Home / Browse projects / Mumbai Suburban, Maharashtra / HIRANI VILLA
HIRANI VILLA
By AMI INFRA PROJECTS PRIVATE LIMITED
RG-MH-28669 · RERA P51800026708 · Last updated on MahaRERA portal: 6 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 5 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 38 months
- 4 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HIRANI VILLA is a Others project by AMI INFRA PROJECTS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800026708 on 21 Oct 2020. Possession was promised by 30 May 2026 and is now 5 months past that date. The completion date has moved by 38 months from the original filing. 19 of the 52 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameHIRANI VILLA
- TypeOthers
- Location
- VILE PARLE EAST
- VILE PARLE
- Andheri
- Mumbai Suburban
- 400057
- Pincode400057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800026708
- ReraGenie IDRG-MH-28669
Builder
- NameAMI INFRA PROJECTS PRIVATE LIMITED
- Entity typeCompany
- CINU70100MH2013PTC242869
- GSTIN27AALCA5659D1ZI
- DirectorsVIPUL HARSHVADAN PANDYA, AMRISH HARSHVADAN PANDYA
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on21 Oct 2020
- Promised completion30 May 2026
- Revised completionRevised to 30 May 2026 (originally 30 Mar 2023)
- Buildings1 building record
- Documents filed135 files
Current status
Figures as on 6 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| HIRANI VILLA | NA | 11 | 11 | 41 | 11 | 52 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
HIRANI VILLA: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed49
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SHAMIK ENTERPRISE PRIVATE LIMITED | Andheri | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| HIRANI VILLA | NA | Rs 12.60 cr | Rs 12.60 cr |
| - | NA | Rs 8.40 cr | Rs 3.11 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Archpro India Eco-Space IT Park Premises CoOp.Soc.Ltd, |
| Architect | ArchproIndia |
| Engineer | M/s Sura and Associates |
| Engineer | ArchproIndia |
| Chartered Accountant | CA NEHALI & CO |
| Chartered Accountant | Nehali & Co |
| Chartered Accountant | Vishal Surti & Associates |
| Partner | Role in project |
|---|---|
| AMI INFRA PROJECTS PRIVATE LIMITED | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION FOR 12 MONTHS
Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 30/06/2024
Reason as filed by the promoterDue to shortage of material and labor not able to complete request you to please grant us extension till 31/03/2025
Reason as filed by the promoterOC Recived
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12501531 | rutuja nilesh oak | AMI INFRA PROJECTS PRIVATE LIMITED | 08/05/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Oct 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed135
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 135 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form_1__architect_certificate__March_26_Signed.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: Form_2__engineer_certificate_-_March_26_Signed.pdf | 6 May 2026 |
| Withdrawal Update Form 3File: Signed_CA_Certificate-_ami_infra_Hirani_villa_mar_26_-_Signed.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: form_1__architect_certificate__Sep_25_.pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: form_1__architect_certificate__Dec_25.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Form_2__engineer_certificate_-_Sep_25__1_.pdf | 24 Apr 2026 |
| Withdrawal Update Form 2File: Form_2__engineer_certificate_-_Dec_25.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: Resigned__22-04-26__CA_Certificate_Ami_Infra-Sept_25_Signed.pdf | 24 Apr 2026 |
| Withdrawal Update Form 3File: Resigned_22-04-26_CA_Certificate_Ami_Infra-Dec_25_-_Signed (1).pdf | 24 Apr 2026 |
| Withdrawal Update Form 1File: form_1__architect_certificate__June_25_.pdf | 23 Apr 2026 |
| Withdrawal Update Form 2File: Form_2__engineer_certificate_-_June_25__1_.pdf | 23 Apr 2026 |
| Withdrawal Update Form 3File: Resigned22-04-26_Estimates_Changed_CA_Certificate_Ami_Infra-June_25_-_Signed.pdf | 23 Apr 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 25 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 25 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 25 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 8 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 8 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 8 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: INVENTORY_DISCLOSURE.pdf | 8 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: INVENTORY_DISCLOSURE.pdf | 20 Dec 2024 |
| Declaration in FORM BFile: FORM_B.pdf | 2 Dec 2024 |
| CERSAI detailsFile: CERSAI_DECLARATION.pdf | 2 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 18 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 18 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: inventory.pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 18 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 18 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: inventory.pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 16 Oct 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: format b20241005_19164286.pdf | 9 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM_2A_FY_2024.pdf | 2 May 2024 |
| Declaration in FORM BFile: FORM_B.pdf | 30 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_form_1.pdf | 30 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Form_2.pdf | 30 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM_2A_FY_2023.pdf | 30 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA_Certificate_Ami_Infra-mar_24.pdf | 30 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form_5_FY22-23.pdf | 30 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Dec 23.pdf | 31 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dec 23.pdf | 31 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ca Certificate Dec 23.pdf | 25 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_form_1_new.pdf | 23 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Form_2_new.pdf | 23 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: INVENTORY_DISCLOSURE_AS_ON.pdf | 23 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3.pdf | 23 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: INVENTORY_DISCLOSURE_AS_ON.pdf | 23 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revisied_signed_CA_Certificate_Ami_Infra.pdf | 23 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf | 14 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2.pdf | 14 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3.pdf | 14 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_form_1_new_Signed.pdf | 13 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Form_2_new_Signed.pdf | 13 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA_Certificate_Ami_Infra-Mar_23.pdf | 9 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA_Certificate Ami Infra-Mar 23.pdf | 6 Jun 2023 |
| Building plan approvalFile: IOA.pdf | 13 May 2023 |
| Layout approvalFile: IOA AND PLANS_3-end_1-2.pdf | 13 May 2023 |
| Layout approvalFile: IOA AND PLANS_3-end_3-end.pdf | 13 May 2023 |
| Copy of Layout Approval (in case of layout)File: IOA AND PLANS_3-end_1-2.pdf | 13 May 2023 |
| Copy of Layout Approval (in case of layout)File: IOA AND PLANS_3-end_3-end.pdf | 13 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOA.pdf | 13 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 13 May 2023 |
| Declaration about Commencement CertificateFile: CC_COVERING_LETTER.pdf | 13 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 june 2022.pdf | 10 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 september 2022.pdf | 10 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 december 2022.pdf | 10 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM_5_-_21-22.pdf | 7 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT_FORM_1 march 2022.pdf | 27 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT_FORM_1 june 2022.pdf | 27 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT_FORM_1 sep 2022.pdf | 27 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT_FORM_1 dec 2022.pdf | 27 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2_-_ENGINEER_CERTIFICATE_-march 2021.pdf | 27 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM_2_-_ENGINEERS_CERTIFICATE_-march 2022.pdf | 27 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM_2A_-_ENGINEERS_CERTIFICATE_-_MARCH_22.pdf | 27 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_CERTIFICATE_NEHALI_ march 2022.pdf | 27 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_CERTIFICATE_NEHALI_ june 2022.pdf | 27 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_CERTIFICATE_NEHALI_ dec 2022.pdf | 27 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA_Form_5_FY_20-21.pdf | 27 Jan 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 135 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep HIRANI VILLA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VILE PARLE6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 360 registered projects within 2 km.
Vijayraj Residency
Vijayraj Realtors
ZEE HAPPY VEENA
ZEE LIFESPACES
Romell Espalier
ROMELL REAL ESTATE PRIVATE LIMITED
ZEE SHAAN
TRISUL DEVELOPERS
SALE BUILDING 1 - CHAMUNDA CROWN AND SALE BUIL
Chamunda Builders & Developers
ARKADE PEARL 1
ARKADE DEVELOPERS LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: AMI INFRA PROJECTS PRIVATE LIMITED
AMI INFRA PROJECTS PRIVATE LIMITED has 1 registration on MahaRERA, including HIRANI VILLA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that HIRANI VILLA shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if HIRANI VILLA is delayed beyond 30 May 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HIRANI VILLA?
The registered promoter entity is AMI INFRA PROJECTS PRIVATE LIMITED, a company as per the filing. Its CIN U70100MH2013PTC242869 and GSTIN 27AALCA5659D1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HIRANI VILLA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against HIRANI VILLA?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for HIRANI VILLA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HIRANI VILLA?
The professionals named in the filing: Architect: Archpro India Eco-Space IT Park Premises CoOp.Soc.Ltd,; Architect: ArchproIndia; Engineer: M/s Sura and Associates; Engineer: ArchproIndia; Chartered Accountant: CA NEHALI & CO; Chartered Accountant: Nehali & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HIRANI VILLA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback