Hira House

By Goshar Alliance LLP

RG-MH-23228 · RERA P51900078474 · Last updated on MahaRERA portal: 20 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Plinth, 70%
27 of 35Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

Hira House is a Residential / Group Housing project by Goshar Alliance LLP in Mumbai City, Maharashtra, registered with MahaRERA as P51900078474 on 17 Dec 2024. Possession is promised by 31 Dec 2028. 8 of the 35 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameHira House
  • TypeResidential / Group Housing
  • Location
    • Sir Bhalchandra Road
    • Matunga East
    • Fnorth-400019
    • Ward FNorth
    • Mumbai City
    • 400019
  • Pincode400019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900078474
  • ReraGenie IDRG-MH-23228

Builder

  • NameGoshar Alliance LLP
  • Entity typeOthers
  • GSTIN27AAMFG8992K1ZG
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Dec 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Current status

23%8 of 35 units booked
30.9%Work done, per cost certificate

Figures as on 20 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Hira HouseNA362535035

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 70%.

Hira House: 33% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)60%
Podiums (if any)50%
Plinth70%
Stilt Floor60%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed67

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots67
Closed/Covered67

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area739 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
Declared on7 Jun 2025
LandownerVillageDistrict
Hira Sagar Co-operative Housing Society LimitedFnorth-400019Mumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3948.88
Proposed, not sanctioned3,949 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPAL RESIDENCY,SHOP NO 2,PLOT NO 358BHANDARKAR ROAD, MATUNGA CR MUMBAI MAHARASHTRA 400019
Estimated costRs 58.71 cr
Cost incurredRs 18.12 cr
Work done30.87%
BuildingWingEstimatedIncurred
Hira HouseNARs 29.36 crRs 9.06 cr
-NARs 29.36 crRs 9.06 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanjay Jadhav
EngineerDinesh Bhagat
Chartered AccountantHemraj Chheda
PartnerRole in project
Goshar Alliance LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Withdrawal Application Form1 (Sanjay Jadhav)_compressed.pdf20 May 2026
Withdrawal Update Form 2File: Engineer Certificate - DINESH BHAGAT.pdf20 May 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 - Chartered Accountant.pdf20 May 2026
Withdrawal Update Form 1File: Architect Certificate - Withdrawal Application Form1.pdf28 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate - Withdrawal Application Form2 (7).pdf28 Feb 2026
Withdrawal Update Form 3File: Withdrawal Form (Chartered Accounts Certificate).pdf28 Feb 2026
Withdrawal Update Form 1File: Sanjay Jadhav (Withdrawal Form 1).pdf2 Dec 2025
Withdrawal Update Form 2File: Dinesh Bhagat (Withdrawal Form 2).pdf2 Dec 2025
Withdrawal Update Form 3File: Hemraj Chheda (Withdrawal Form 3).pdf2 Dec 2025
Withdrawal Update Form 1File: Sanjay Jadhav (Withdrawal Form 1).pdf18 Nov 2025
Withdrawal Update Form 2File: Dinesh Bhagat (Withdrawal Form 2).pdf18 Nov 2025
Withdrawal Update Form 3File: Hemraj Chheda (Withdrawal Form 3).pdf18 Nov 2025
Withdrawal Update Form 1File: Sanjay Jadhav (Withdrawal Form 1).pdf17 Nov 2025
Withdrawal Update Form 1File: Sanjay Jadhav (Withdrawal Form 1).pdf17 Nov 2025
Withdrawal Update Form 2File: Dinesh Bhagat (Withdrawal Form 2).pdf17 Nov 2025
Withdrawal Update Form 2File: Dinesh Bhagat (Withdrawal Form 2).pdf17 Nov 2025
Withdrawal Update Form 3File: Hemraj Chheda (Withdrawal Form 3).pdf17 Nov 2025
Withdrawal Update Form 3File: Hemraj Chheda (Withdrawal Form 3).pdf17 Nov 2025
Withdrawal Update Form 1File: Withdrawal Application Form1.pdf30 Oct 2025
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf30 Oct 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 (2).pdf30 Oct 2025
Withdrawal Update Form 1File: Architectu0027s Certificate for Completion of Work.pdf6 Oct 2025
Withdrawal Update Form 1File: Architectu0027s Certificate for Completion of Work.pdf6 Oct 2025
Withdrawal Update Form 1File: Architectu0027s Certificate for Completion of Work.pdf6 Oct 2025
Withdrawal Update Form 2File: 11 Engineeru0027s Certificate - Annexure B - Form 2.pdf6 Oct 2025
Withdrawal Update Form 2File: 11 Engineeru0027s Certificate - Annexure B - Form 2.pdf6 Oct 2025
Withdrawal Update Form 2File: 11 Engineeru0027s Certificate - Annexure B - Form 2.pdf6 Oct 2025
Withdrawal Update Form 3File: 21 Chartered Accountantu0027s Certificate - Annexure D - Form 3.pdf6 Oct 2025
Withdrawal Update Form 3File: 21 Chartered Accountantu0027s Certificate - Annexure D - Form 3.pdf6 Oct 2025
Withdrawal Update Form 3File: 21 Chartered Accountantu0027s Certificate - Annexure D - Form 3.pdf6 Oct 2025
Commencement certificateFile: Commencement Certificate.pdf21 Jul 2025
Declaration and undertaking (Annexure A)File: 45 Annexure A - Declaration-cum-Undertaking.pdf21 Jul 2025
Building plan approval or NA orderFile: 8 Revised CC HH Upper Stilt.pdf21 Jul 2025
Form 1File: 17-12-2024 to 31-12-2024 Architect's Certificate - Annexure A - Form 1.pdf19 Jun 2025
Form 2File: 17-12-2024 to 31-12-2024 Engineer's Certificate - Annexure B - Form 2.pdf19 Jun 2025
Form 3File: CA CERTIFICATE 22-10-24 to 31-12-24.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: 17-12-2024 to 31-12-2024 Disclosure for sold unsold inventory.pdf19 Jun 2025
Self-declaration of Quarterly ProgressFile: 17-12-2024 to 31-12-2024 QPR Declaration.pdf19 Jun 2025
Form 1File: 01-01-2025 to 31-03-2025 Architect's Certificate - Annexure A - Form 1.pdf19 Jun 2025
Form 2File: 01-01-2025 to 31-03-2025 Engineer's Certificate - Annexure B - Form 2.pdf19 Jun 2025
Form 3File: CA CERTIFICATE 01-01-25 to 31-03-25.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: 01-01-2025 to 31-03-2025 Disclosure for sold unsold inventory.pdf19 Jun 2025
Self-declaration of Quarterly ProgressFile: 01-01-2025 to 31-03-2025 QPR Declaration.pdf19 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 21 Chartered Accountant's Certificate - Annexure D - Form 3.pdf12 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration-cum-Undertaking.pdf23 Nov 2024
Other - FinanceFile: Declaration-cum-Undertaking.pdf23 Nov 2024
Other - FinanceFile: Annexure A - Declaration-cum-Undertaking.pdf22 Nov 2024
Other - LegalFile: 42 Form B Promoter Decleration HH.pdf19 Nov 2024
Other - LegalFile: 42 Form B Promoter Decleration.pdf19 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 21 Annexure A Disclosure of interest in other REO.pdf19 Nov 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: 36 Format A Declaration for RERA Bank Account.pdf8 Nov 2024
Proforma of Agreement for saleFile: 30 HH RERA AFS.pdf7 Nov 2024
Proforma of Allotment letterFile: 31 HH RERA AL.pdf23 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 37 Letter from Bank RERA Designated Bank Account.pdf23 Oct 2024
Building plan approvalFile: 5_6 HH IOD Drawing 07 to 12.pdf22 Oct 2024
Layout approvalFile: 5_6 HH IOD Drawing 01 to 06.pdf22 Oct 2024
Layout approvalFile: 5_6 HH IOD Drawing 07 to 12.pdf22 Oct 2024
Copy of the legal title reportFile: 2 HH RERA Title Report.pdf22 Oct 2024
Copy of Layout Approval (in case of layout)File: 5_6 HH IOD Drawing 07 to 12.pdf22 Oct 2024
Copy of Layout Approval (in case of layout)File: 5_6 HH IOD Drawing 01 to 06.pdf22 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 5_6 HH IOD Drawing 07 to 12.pdf22 Oct 2024
Details of encumbrances concerned to FinanceFile: 3,4 Details of Encumbrances Financial Legal.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Engineer's Certificate - Annexure B - Form 2.pdf21 Oct 2024
Details of encumbrances concerned to LegalFile: 3,4 Details of Encumbrances Financial Legal.pdf21 Oct 2024
Declaration in FORM BFile: Form B No Encumbrances.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate for Completion of Work.pdf18 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC HH Upper Stilt.pdf18 Oct 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf18 Oct 2024
Deviation Report with respect to Allotment letterFile: 38 HH RERA AL Deviation.pdf18 Oct 2024
Deviation Report with respect to model copy of AgreementFile: 39 HH RERA AFS Deviation.pdf18 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: 17 HH RERA No Loan Disclosure Letter.pdf18 Oct 2024
PAN CardFile: GAL PAN.pdf17 Oct 2024
CERSAI detailsFile: CERSAI Asset based Search Report.pdf17 Oct 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
MONT KIARAP51900002127Mumbai City, Mumbai CityJul 2017CompletedSep 2020Registered original: Mar 2019Jun 2020

How this compares with Mumbai City

23%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Hira House on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Matunga East780+ in Mumbai City

2 kmHira HouseCompleted 13Lapsed / revoked 17Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 62 registered projects within 2 km.

Builder: Goshar Alliance LLP

Goshar Alliance LLP has 1 registration on MahaRERA, including Hira House. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Hira House is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Hira House?

The registered promoter entity is Goshar Alliance LLP, an others as per the filing. Its GSTIN 27AAMFG8992K1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Hira House?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Hira House?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Hira House?

The professionals named in the filing: Architect: Sanjay Jadhav; Engineer: Dinesh Bhagat; Chartered Accountant: Hemraj Chheda. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Hira House?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Hira House. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Hira House to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.