Red flags
- Registration lapsed
- Possession 28 months past the filed date
- Completion date moved by 6 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- All 4 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HIMALAYA SUNSHINE is a Residential / Group Housing project by HIMALAYA INFRAPROJECTS SUNSHINE in Nagpur, Maharashtra, registered with MahaRERA as P50500013766 on 25 Oct 2017. Possession was promised by 30 Jun 2024 and is now 28 months past that date. The completion date has moved by 6 months from the original filing.
At a glance
Project
- NameHIMALAYA SUNSHINE
- TypeResidential / Group Housing
- Location
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440023
- Pincode440023
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500013766
- ReraGenie IDRG-MH-07830
Builder
- NameHIMALAYA INFRAPROJECTS SUNSHINE
- Entity typeOthers
- Named personsSUNIL DUDDALWAR, SONAL DUDDALWAR, KUNAL DUDDALWAR
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on25 Oct 2017
- Promised completion30 Jun 2024
- Revised completionRevised to 30 Jun 2024 (originally 30 Dec 2023)
- Buildings64 building records
- Documents filed274 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SANCTIONED ROW HOUSE NO 24 Approx 124 Sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 25 Approx 124 Sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 26 Approx 124 Sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 27 Approx 124 Sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 28 Approx 124 Sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 29 Approx 124 Sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED TWIN BUNGALOW NO 37 Approx 149 Sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED TWIN BUNGALOW NO 38 Approx 149 Sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED TWIN BUNGALOW NO 39 Approx 149 Sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED TWIN BUNGALOW NO 40 Approx 149 Sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED TWIN BUNGALOW NO 41 Approx 149 | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED TWIN BUNGALOW NO 42 Approx 149 | NA | 3 | 0 | 0 | 0 | 0 |
| Open Plot No 1 Approx 197 sqmt area | NA | 0 | 0 | 0 | 0 | 0 |
| Open Plot No 2 Approx 150 sqmt area | NA | 0 | 0 | 0 | 0 | 0 |
| Open Plot No 3 Approx 151 sqmt area | NA | 0 | 0 | 0 | 0 | 0 |
| Open Plot No 4 Approx 151 sqmt area | NA | 0 | 0 | 0 | 0 | 0 |
| Open Plot No 5 Approx 151 sqmt area | NA | 0 | 0 | 0 | 0 | 0 |
| Open Plot No 6 Approx 156 sqmt | NA | 0 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 7 Approx 177 sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 8 Approx 179 sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 9 Approx 170 sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 10 Approx 148 sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 11 Approx 100 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 12 Approx 100 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 13 Approx 94 sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 14 Approx 94 sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 15 Approx 121 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 16 Approx 124 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 17 Approx 124 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 18 Approx 124 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 19 Approx 124 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 20 Approx 124 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 21 Approx 124 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 22 Approx 125 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 23 Approx 125 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 30 Approx 121 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED TWIN BUNGALOW NO 31 Approx 199 sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED TWIN BUNGALOW NO 32 Approx 149 sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED TWIN BUNGALOW NO 33 Approx 149 sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED TWIN BUNGALOW NO 34 Approx 149 sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED TWIN BUNGALOW NO 35 Approx 156 sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED TWIN BUNGALOW NO 36 Approx 149 sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED TWIN BUNGALOW NO 43 Approx 149 sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED TWIN BUNGALOW NO 44 Approx 211 sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 45 Approx 122 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 46 Approx 124 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 47 Approx 121 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 48 Approx 121 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 49 Approx 124 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 50 Approx 124 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 51 Approx 124 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 52 Approx 124 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 53 Approx 124 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 54 Approx 124 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 55 Approx 121 sqmt | NA | 2 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 56 Approx 160 Sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONEN ROW HOUSE NO 57 Approx 160 Sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 58 Aprrox 160 Sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 59 Approx 160 Sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 60 Approx 107 Sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 61 Approx 133 Sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 62 Approx 107 Sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| SANCTIONED ROW HOUSE NO 63 Approx 167 Sqmt | NA | 3 | 0 | 0 | 0 | 0 |
| Open Plot No 64 Approx 253 Sqmt Area | NA | 3 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 17 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 64 buildings; the table lists the first 20.
391 of 704 construction stages are filed complete across 64 buildings. The stage furthest along is Basement (if any), at 0%.
SANCTIONED ROW HOUSE NO 24 Approx 124 Sqmt64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SANCTIONED ROW HOUSE NO 25 Approx 124 Sqmt64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SANCTIONED ROW HOUSE NO 26 Approx 124 Sqmt64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SANCTIONED ROW HOUSE NO 27 Approx 124 Sqmt64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SANCTIONED ROW HOUSE NO 28 Approx 124 Sqmt64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SANCTIONED ROW HOUSE NO 29 Approx 124 Sqmt64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SANCTIONED TWIN BUNGALOW NO 37 Approx 149 Sqmt64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SANCTIONED TWIN BUNGALOW NO 38 Approx 149 Sqmt64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SANCTIONED TWIN BUNGALOW NO 39 Approx 149 Sqmt64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SANCTIONED TWIN BUNGALOW NO 40 Approx 149 Sqmt64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SANCTIONED TWIN BUNGALOW NO 41 Approx 14964%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SANCTIONED TWIN BUNGALOW NO 42 Approx 14964%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Open Plot No 1 Approx 197 sqmt area0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Open Plot No 2 Approx 150 sqmt area0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Open Plot No 3 Approx 151 sqmt area0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Open Plot No 4 Approx 151 sqmt area0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Open Plot No 5 Approx 151 sqmt area0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Open Plot No 6 Approx 156 sqmt0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SANCTIONED ROW HOUSE NO 7 Approx 177 sqmt64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SANCTIONED ROW HOUSE NO 8 Approx 179 sqmt64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 70% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 20% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 30% |
| Open Parking | No | Not applicable |
Parking filed61
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| SANCTIONED ROW HOUSE NO 24 Approx 124 Sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 25 Approx 124 Sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 26 Approx 124 Sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 27 Approx 124 Sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 28 Approx 124 Sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 29 Approx 124 Sqmt | 1 | 1 |
| SANCTIONED TWIN BUNGALOW NO 37 Approx 149 Sqmt | 1 | 1 |
| SANCTIONED TWIN BUNGALOW NO 38 Approx 149 Sqmt | 1 | 1 |
| SANCTIONED TWIN BUNGALOW NO 39 Approx 149 Sqmt | 1 | 1 |
| SANCTIONED TWIN BUNGALOW NO 40 Approx 149 Sqmt | 1 | 1 |
| SANCTIONED TWIN BUNGALOW NO 41 Approx 149 | 1 | 1 |
| SANCTIONED TWIN BUNGALOW NO 42 Approx 149 | 1 | 1 |
| SANCTIONED ROW HOUSE NO 7 Approx 177 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 8 Approx 179 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 9 Approx 170 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 10 Approx 148 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 11 Approx 100 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 12 Approx 100 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 13 Approx 94 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 14 Approx 94 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 15 Approx 121 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 16 Approx 124 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 17 Approx 124 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 18 Approx 124 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 19 Approx 124 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 20 Approx 124 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 21 Approx 124 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 22 Approx 125 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 23 Approx 125 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 30 Approx 121 sqmt | 1 | 1 |
| SANCTIONED TWIN BUNGALOW NO 31 Approx 199 sqmt | 2 | 2 |
| SANCTIONED TWIN BUNGALOW NO 32 Approx 149 sqmt | 1 | 1 |
| SANCTIONED TWIN BUNGALOW NO 33 Approx 149 sqmt | 1 | 1 |
| SANCTIONED TWIN BUNGALOW NO 34 Approx 149 sqmt | 1 | 1 |
| SANCTIONED TWIN BUNGALOW NO 35 Approx 156 sqmt | 1 | 1 |
| SANCTIONED TWIN BUNGALOW NO 36 Approx 149 sqmt | 1 | 1 |
| SANCTIONED TWIN BUNGALOW NO 43 Approx 149 sqmt | 1 | 1 |
| SANCTIONED TWIN BUNGALOW NO 44 Approx 211 sqmt | 2 | 2 |
| SANCTIONED ROW HOUSE NO 45 Approx 122 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 46 Approx 124 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 47 Approx 121 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 48 Approx 121 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 49 Approx 124 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 50 Approx 124 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 51 Approx 124 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 52 Approx 124 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 53 Approx 124 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 54 Approx 124 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 55 Approx 121 sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 56 Approx 160 Sqmt | 1 | 1 |
| SANCTIONEN ROW HOUSE NO 57 Approx 160 Sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 58 Aprrox 160 Sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 59 Approx 160 Sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 60 Approx 107 Sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 61 Approx 133 Sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 62 Approx 107 Sqmt | 1 | 1 |
| SANCTIONED ROW HOUSE NO 63 Approx 167 Sqmt | 1 | 1 |
| Open Plot No 64 Approx 253 Sqmt Area | 2 | 2 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RUPESH NAOGHARE |
| Engineer | P S PATANKAR |
| Partner | Role in project |
|---|---|
| HIMALAYA INFRAPROJECTS SUNSHINE | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThat Promoter undertaken development of the Project bearing Registration No. P50500013766 in various phases and at the time of registration of the said Project the estimated cost, as mentioned in the first paragraph of this declaration, was considered for those plots which were released or to be released immediately and the sanction of Building Map was obtained. Hence the total estimated cost was proportional to the released plots and sanctioned units. Now that all the plots have been released by the sanctioning authority and also all the Building Map sanctions of units have been received (exc
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Oct 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Oct 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Jun 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 28 May 2024
Documents filed274
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 274 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Other - LegalFile: Form 4 Updted 14-02-2025.pdf | 17 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annexure F - Form 5.pdf | 7 Jan 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Updated_merged_compressed.pdf | 24 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 12 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 12 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 12 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Inventory.pdf | 12 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3_compressed.pdf | 12 Jul 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Plot No 56 to Plot No 63 Occupancy Certificate.pdf | 28 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Architects Certificate - Unit I.pdf | 8 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Engineers Certificate - Unit I.pdf | 8 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A - Engineers Certificate For Quality Assurance - Unit I.pdf | 8 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Himalaya Sunshine - Sold - Booked Inventory.pdf | 8 Apr 2024 |
| Certificates of CA (Form 3)File: FORM 3 - Chartered Accountants Certificate - Unit I_compressed.pdf | 8 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architects Certificate Unit I.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers Certificate Unit I.pdf | 20 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A Engineers Certificate For Quality Assurance Unit I.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Inventory Unit I.pdf | 20 Jan 2024 |
| Certificates of CA (Form 3)File: FORM 3 Chartered Accountants Certificate Unit I NEW.pdf | 20 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Annual Report on Statement of Accounts.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 16 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 16 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Supervisor Certificate.pdf | 16 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold - Booked Inventory.pdf | 16 Nov 2023 |
| Certificates of CA (Form 3)File: C A Certificate.pdf | 16 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architects Certificate.pdf | 26 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Engineers Certificate.pdf | 26 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A - Site Supervisor’s Certificate.pdf | 26 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Revised Format Sold - Booked Inventory.pdf | 26 Aug 2023 |
| Certificates of CA (Form 3)File: FORM 3 - Chartered Accountant’s Certificate.pdf | 26 Aug 2023 |
| Declaration in FORM BFile: FORM B UNIT I.pdf | 22 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Unit I.pdf | 22 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Unit I.pdf | 22 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 22 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Unit I.pdf | 22 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 Unit I NEW.pdf | 22 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 22 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 22 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf | 22 May 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKD INVENTORY.pdf | 22 May 2023 |
| Certificates of CA (Form 3)File: FORM 3_.pdf | 22 May 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificates 7 to 33 units.pdf | 16 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificates 34 to 55 units.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM NO 5 UNIT 1.pdf | 13 Feb 2023 |
| Building plan approvalFile: Building Permit and Plan Plot No 56.pdf | 15 Jun 2022 |
| Building plan approvalFile: Building Permit and Plan Plot No 57.pdf | 15 Jun 2022 |
| Building plan approvalFile: Building Permit and Plan Plot No 58.pdf | 15 Jun 2022 |
| Building plan approvalFile: Building Permit and Plan Plot No 59.pdf | 15 Jun 2022 |
| Building plan approvalFile: Building Permit and Plan Plot No 60.pdf | 15 Jun 2022 |
| Building plan approvalFile: Building Permit and Plan Plot No 61.pdf | 15 Jun 2022 |
| Building plan approvalFile: Building Permit and Plan Plot No 62.pdf | 15 Jun 2022 |
| Building plan approvalFile: Building Permit and Plan Plot No 63.pdf | 15 Jun 2022 |
| Building Plan Approval (IOD)File: Building Permit and Plan Plot No 56.pdf | 15 Jun 2022 |
| Building Plan Approval (IOD)File: Building Permit and Plan Plot No 57.pdf | 15 Jun 2022 |
| Building Plan Approval (IOD)File: Building Permit and Plan Plot No 58.pdf | 15 Jun 2022 |
| Building Plan Approval (IOD)File: Building Permit and Plan Plot No 59.pdf | 15 Jun 2022 |
| Building Plan Approval (IOD)File: Building Permit and Plan Plot No 60.pdf | 15 Jun 2022 |
| Building Plan Approval (IOD)File: Building Permit and Plan Plot No 61.pdf | 15 Jun 2022 |
| Building Plan Approval (IOD)File: Building Permit and Plan Plot No 62.pdf | 15 Jun 2022 |
| Building Plan Approval (IOD)File: Building Permit and Plan Plot No 63.pdf | 15 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Building Permit Plot No 56 Revised.pdf | 15 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Building Permit Plot No 57.pdf | 15 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Building Permit Plot No 58.pdf | 15 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Building Permit Plot No 59.pdf | 15 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Building Permit Plot No 60.pdf | 15 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Building Permit Plot No 61.pdf | 15 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Building Permit Plot No 62.pdf | 15 Jun 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Building Permit Plot No 63.pdf | 15 Jun 2022 |
| Certificates of CA (Form 3)File: Form 3 Unit 1.pdf | 4 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020-21_compressed.pdf | 30 Apr 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: NEW 12 Occupancy Certificate UPDATE.pdf | 13 Nov 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 22 Sep 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 22 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf | 22 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOK INVENTORY.pdf | 22 Sep 2021 |
| Certificates of CA (Form 3)File: Form 3_Sunshine Unit I new.pdf | 22 Sep 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate NEW.pdf | 22 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5.pdf | 25 Jan 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Himalaya Sunshine Engineers Certificate.pdf | 12 Mar 2020 |
| Building plan approvalFile: Building Permit Plot No 48 NEW.pdf | 22 Feb 2020 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| HIMALAYA EMPIRE | THE HIMALAYA EMPIRE APARTMENT KHASRA NO 82 2 4 AND 82 3PART MAUZA BABHULKHEDA SHATABDI SQUARE SOMALWADA BESA ROAD NAGPUR | 155 | Completed | Sep 2016 | Sep 2016 |
| HIMALAYA GALAXY-II | HIMALAYA GALAXY-II PLOT NO 59 60 AND 61 AMRAVATI ROAD NEAR UNIVERSITY CAMPUS NAGPUR | 18 | Completed | Sep 2014 | Sep 2014 |
| HIMALAYA GALAXY-I | HIMALAYA GALAXY-I PLOT NO.62 & 63 AMRAVATI ROAD NEAR UNIVERSITY CAMPUS KACHIMET NAGPUR | 15 | Completed | Apr 2014 | Apr 2014 |
| HIMALAYA PRESTIGE | HIMALAYA PRESTIGE APARTMENT CONDOMINIUM NEAR SBI COLONY OPPOSITE VRCE GATE SOUTH AMBAZARI ROAD NAGPUR | 36 | Completed | Sep 2011 | Aug 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 274 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep HIMALAYA SUNSHINE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nagpur (M Corp.)2,800+ in Nagpur
Filed coordinates, straight-line distance. 4 registered projects within 2 km.
PREMIER HERITAGE WADDHAMNA -182
PREMIER HERITAGE
PREMIER HERITAGE WADDHAMNA -181
PREMIER HERITAGE
SHREE RAM EMPIRE
SANJAY PAIDLEWAR, NITISH CHORDIA AND SHISH
SDPL Aashray Dabha II
SANDEEP DWELLERS PVT. LTD.
PREMIER HERITAGE WADDHAMNA -183
PREMIER HERITAGE
SDPL Suvarnabhumi
SANDEEP DWELLERS PVT. LTD.
See every Nagpur project, with the district possession charts
Builder: HIMALAYA INFRAPROJECTS SUNSHINE
HIMALAYA INFRAPROJECTS SUNSHINE has 1 registration on MahaRERA, including HIMALAYA SUNSHINE. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What does it mean that HIMALAYA SUNSHINE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if HIMALAYA SUNSHINE is delayed beyond 30 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HIMALAYA SUNSHINE?
The registered promoter entity is HIMALAYA INFRAPROJECTS SUNSHINE, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HIMALAYA SUNSHINE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for HIMALAYA SUNSHINE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HIMALAYA SUNSHINE?
The professionals named in the filing: Architect: RUPESH NAOGHARE; Engineer: P S PATANKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HIMALAYA SUNSHINE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback