Registration lapsed No litigation declared Residential / Group Housing project

HIMALAYA SUNSHINE

By HIMALAYA INFRAPROJECTS SUNSHINE

RG-MH-07830 · RERA P50500013766 · Last updated on MahaRERA portal: 17 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 28 months past the filed date
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 4 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jun 2024Possession promised28 months past this date
391 of 704Construction stages doneacross 64 buildings; furthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 274 documents Report an error

HIMALAYA SUNSHINE is a Residential / Group Housing project by HIMALAYA INFRAPROJECTS SUNSHINE in Nagpur, Maharashtra, registered with MahaRERA as P50500013766 on 25 Oct 2017. Possession was promised by 30 Jun 2024 and is now 28 months past that date. The completion date has moved by 6 months from the original filing.

At a glance

Project

  • NameHIMALAYA SUNSHINE
  • TypeResidential / Group Housing
  • Location
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440023
  • Pincode440023
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500013766
  • ReraGenie IDRG-MH-07830

Builder

  • NameHIMALAYA INFRAPROJECTS SUNSHINE
  • Entity typeOthers
  • Named personsSUNIL DUDDALWAR, SONAL DUDDALWAR, KUNAL DUDDALWAR
  • Declared earlier projects4 →

Key dates

28 months past promisethis monthRegisteredOct 2017First promiseDec 2023Revised toJun 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on25 Oct 2017
  • Promised completion30 Jun 2024
  • Revised completionRevised to 30 Jun 2024 (originally 30 Dec 2023)
  • Buildings64 building records
  • Documents filed274 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SANCTIONED ROW HOUSE NO 24 Approx 124 SqmtNA20000
SANCTIONED ROW HOUSE NO 25 Approx 124 SqmtNA20000
SANCTIONED ROW HOUSE NO 26 Approx 124 SqmtNA20000
SANCTIONED ROW HOUSE NO 27 Approx 124 SqmtNA20000
SANCTIONED ROW HOUSE NO 28 Approx 124 SqmtNA20000
SANCTIONED ROW HOUSE NO 29 Approx 124 SqmtNA20000
SANCTIONED TWIN BUNGALOW NO 37 Approx 149 SqmtNA30000
SANCTIONED TWIN BUNGALOW NO 38 Approx 149 SqmtNA30000
SANCTIONED TWIN BUNGALOW NO 39 Approx 149 SqmtNA30000
SANCTIONED TWIN BUNGALOW NO 40 Approx 149 SqmtNA30000
SANCTIONED TWIN BUNGALOW NO 41 Approx 149NA30000
SANCTIONED TWIN BUNGALOW NO 42 Approx 149NA30000
Open Plot No 1 Approx 197 sqmt areaNA00000
Open Plot No 2 Approx 150 sqmt areaNA00000
Open Plot No 3 Approx 151 sqmt areaNA00000
Open Plot No 4 Approx 151 sqmt areaNA00000
Open Plot No 5 Approx 151 sqmt areaNA00000
Open Plot No 6 Approx 156 sqmtNA00000
SANCTIONED ROW HOUSE NO 7 Approx 177 sqmtNA30000
SANCTIONED ROW HOUSE NO 8 Approx 179 sqmtNA30000
SANCTIONED ROW HOUSE NO 9 Approx 170 sqmtNA30000
SANCTIONED ROW HOUSE NO 10 Approx 148 sqmtNA30000
SANCTIONED ROW HOUSE NO 11 Approx 100 sqmtNA20000
SANCTIONED ROW HOUSE NO 12 Approx 100 sqmtNA20000
SANCTIONED ROW HOUSE NO 13 Approx 94 sqmtNA30000
SANCTIONED ROW HOUSE NO 14 Approx 94 sqmtNA30000
SANCTIONED ROW HOUSE NO 15 Approx 121 sqmtNA20000
SANCTIONED ROW HOUSE NO 16 Approx 124 sqmtNA20000
SANCTIONED ROW HOUSE NO 17 Approx 124 sqmtNA20000
SANCTIONED ROW HOUSE NO 18 Approx 124 sqmtNA20000
SANCTIONED ROW HOUSE NO 19 Approx 124 sqmtNA20000
SANCTIONED ROW HOUSE NO 20 Approx 124 sqmtNA20000
SANCTIONED ROW HOUSE NO 21 Approx 124 sqmtNA20000
SANCTIONED ROW HOUSE NO 22 Approx 125 sqmtNA20000
SANCTIONED ROW HOUSE NO 23 Approx 125 sqmtNA20000
SANCTIONED ROW HOUSE NO 30 Approx 121 sqmtNA20000
SANCTIONED TWIN BUNGALOW NO 31 Approx 199 sqmtNA30000
SANCTIONED TWIN BUNGALOW NO 32 Approx 149 sqmtNA30000
SANCTIONED TWIN BUNGALOW NO 33 Approx 149 sqmtNA30000
SANCTIONED TWIN BUNGALOW NO 34 Approx 149 sqmtNA30000
SANCTIONED TWIN BUNGALOW NO 35 Approx 156 sqmtNA30000
SANCTIONED TWIN BUNGALOW NO 36 Approx 149 sqmtNA30000
SANCTIONED TWIN BUNGALOW NO 43 Approx 149 sqmtNA30000
SANCTIONED TWIN BUNGALOW NO 44 Approx 211 sqmtNA30000
SANCTIONED ROW HOUSE NO 45 Approx 122 sqmtNA20000
SANCTIONED ROW HOUSE NO 46 Approx 124 sqmtNA20000
SANCTIONED ROW HOUSE NO 47 Approx 121 sqmtNA20000
SANCTIONED ROW HOUSE NO 48 Approx 121 sqmtNA20000
SANCTIONED ROW HOUSE NO 49 Approx 124 sqmtNA20000
SANCTIONED ROW HOUSE NO 50 Approx 124 sqmtNA20000
SANCTIONED ROW HOUSE NO 51 Approx 124 sqmtNA20000
SANCTIONED ROW HOUSE NO 52 Approx 124 sqmtNA20000
SANCTIONED ROW HOUSE NO 53 Approx 124 sqmtNA20000
SANCTIONED ROW HOUSE NO 54 Approx 124 sqmtNA20000
SANCTIONED ROW HOUSE NO 55 Approx 121 sqmtNA20000
SANCTIONED ROW HOUSE NO 56 Approx 160 SqmtNA30000
SANCTIONEN ROW HOUSE NO 57 Approx 160 SqmtNA30000
SANCTIONED ROW HOUSE NO 58 Aprrox 160 SqmtNA30000
SANCTIONED ROW HOUSE NO 59 Approx 160 SqmtNA30000
SANCTIONED ROW HOUSE NO 60 Approx 107 SqmtNA30000
SANCTIONED ROW HOUSE NO 61 Approx 133 SqmtNA30000
SANCTIONED ROW HOUSE NO 62 Approx 107 SqmtNA30000
SANCTIONED ROW HOUSE NO 63 Approx 167 SqmtNA30000
Open Plot No 64 Approx 253 Sqmt AreaNA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 17 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 64 buildings; the table lists the first 20.

391 of 704 construction stages are filed complete across 64 buildings. The stage furthest along is Basement (if any), at 0%.

SANCTIONED ROW HOUSE NO 24 Approx 124 Sqmt64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SANCTIONED ROW HOUSE NO 25 Approx 124 Sqmt64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SANCTIONED ROW HOUSE NO 26 Approx 124 Sqmt64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SANCTIONED ROW HOUSE NO 27 Approx 124 Sqmt64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SANCTIONED ROW HOUSE NO 28 Approx 124 Sqmt64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SANCTIONED ROW HOUSE NO 29 Approx 124 Sqmt64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SANCTIONED TWIN BUNGALOW NO 37 Approx 149 Sqmt64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SANCTIONED TWIN BUNGALOW NO 38 Approx 149 Sqmt64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SANCTIONED TWIN BUNGALOW NO 39 Approx 149 Sqmt64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SANCTIONED TWIN BUNGALOW NO 40 Approx 149 Sqmt64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SANCTIONED TWIN BUNGALOW NO 41 Approx 14964%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SANCTIONED TWIN BUNGALOW NO 42 Approx 14964%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Open Plot No 1 Approx 197 sqmt area0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Open Plot No 2 Approx 150 sqmt area0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Open Plot No 3 Approx 151 sqmt area0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Open Plot No 4 Approx 151 sqmt area0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Open Plot No 5 Approx 151 sqmt area0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Open Plot No 6 Approx 156 sqmt0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SANCTIONED ROW HOUSE NO 7 Approx 177 sqmt64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SANCTIONED ROW HOUSE NO 8 Approx 179 sqmt64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes50%
Street LightingYes20%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes30%
Open ParkingNoNot applicable

Parking filed61

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots61
Open Space61
BuildingOpen SpaceTotal
SANCTIONED ROW HOUSE NO 24 Approx 124 Sqmt11
SANCTIONED ROW HOUSE NO 25 Approx 124 Sqmt11
SANCTIONED ROW HOUSE NO 26 Approx 124 Sqmt11
SANCTIONED ROW HOUSE NO 27 Approx 124 Sqmt11
SANCTIONED ROW HOUSE NO 28 Approx 124 Sqmt11
SANCTIONED ROW HOUSE NO 29 Approx 124 Sqmt11
SANCTIONED TWIN BUNGALOW NO 37 Approx 149 Sqmt11
SANCTIONED TWIN BUNGALOW NO 38 Approx 149 Sqmt11
SANCTIONED TWIN BUNGALOW NO 39 Approx 149 Sqmt11
SANCTIONED TWIN BUNGALOW NO 40 Approx 149 Sqmt11
SANCTIONED TWIN BUNGALOW NO 41 Approx 14911
SANCTIONED TWIN BUNGALOW NO 42 Approx 14911
SANCTIONED ROW HOUSE NO 7 Approx 177 sqmt11
SANCTIONED ROW HOUSE NO 8 Approx 179 sqmt11
SANCTIONED ROW HOUSE NO 9 Approx 170 sqmt11
SANCTIONED ROW HOUSE NO 10 Approx 148 sqmt11
SANCTIONED ROW HOUSE NO 11 Approx 100 sqmt11
SANCTIONED ROW HOUSE NO 12 Approx 100 sqmt11
SANCTIONED ROW HOUSE NO 13 Approx 94 sqmt11
SANCTIONED ROW HOUSE NO 14 Approx 94 sqmt11
SANCTIONED ROW HOUSE NO 15 Approx 121 sqmt11
SANCTIONED ROW HOUSE NO 16 Approx 124 sqmt11
SANCTIONED ROW HOUSE NO 17 Approx 124 sqmt11
SANCTIONED ROW HOUSE NO 18 Approx 124 sqmt11
SANCTIONED ROW HOUSE NO 19 Approx 124 sqmt11
SANCTIONED ROW HOUSE NO 20 Approx 124 sqmt11
SANCTIONED ROW HOUSE NO 21 Approx 124 sqmt11
SANCTIONED ROW HOUSE NO 22 Approx 125 sqmt11
SANCTIONED ROW HOUSE NO 23 Approx 125 sqmt11
SANCTIONED ROW HOUSE NO 30 Approx 121 sqmt11
SANCTIONED TWIN BUNGALOW NO 31 Approx 199 sqmt22
SANCTIONED TWIN BUNGALOW NO 32 Approx 149 sqmt11
SANCTIONED TWIN BUNGALOW NO 33 Approx 149 sqmt11
SANCTIONED TWIN BUNGALOW NO 34 Approx 149 sqmt11
SANCTIONED TWIN BUNGALOW NO 35 Approx 156 sqmt11
SANCTIONED TWIN BUNGALOW NO 36 Approx 149 sqmt11
SANCTIONED TWIN BUNGALOW NO 43 Approx 149 sqmt11
SANCTIONED TWIN BUNGALOW NO 44 Approx 211 sqmt22
SANCTIONED ROW HOUSE NO 45 Approx 122 sqmt11
SANCTIONED ROW HOUSE NO 46 Approx 124 sqmt11
SANCTIONED ROW HOUSE NO 47 Approx 121 sqmt11
SANCTIONED ROW HOUSE NO 48 Approx 121 sqmt11
SANCTIONED ROW HOUSE NO 49 Approx 124 sqmt11
SANCTIONED ROW HOUSE NO 50 Approx 124 sqmt11
SANCTIONED ROW HOUSE NO 51 Approx 124 sqmt11
SANCTIONED ROW HOUSE NO 52 Approx 124 sqmt11
SANCTIONED ROW HOUSE NO 53 Approx 124 sqmt11
SANCTIONED ROW HOUSE NO 54 Approx 124 sqmt11
SANCTIONED ROW HOUSE NO 55 Approx 121 sqmt11
SANCTIONED ROW HOUSE NO 56 Approx 160 Sqmt11
SANCTIONEN ROW HOUSE NO 57 Approx 160 Sqmt11
SANCTIONED ROW HOUSE NO 58 Aprrox 160 Sqmt11
SANCTIONED ROW HOUSE NO 59 Approx 160 Sqmt11
SANCTIONED ROW HOUSE NO 60 Approx 107 Sqmt11
SANCTIONED ROW HOUSE NO 61 Approx 133 Sqmt11
SANCTIONED ROW HOUSE NO 62 Approx 107 Sqmt11
SANCTIONED ROW HOUSE NO 63 Approx 167 Sqmt11
Open Plot No 64 Approx 253 Sqmt Area22

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,639 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9616.23
Proposed, not sanctioned1,766 sq m
Buildings approved64
Buildings sanctioned64

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch204 DHARAMPETH EXT SHANKAR NAGAR NAGPUR 440010

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRUPESH NAOGHARE
EngineerP S PATANKAR
PartnerRole in project
HIMALAYA INFRAPROJECTS SUNSHINE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500016631Dec 2023 → Jun 2024

Reason as filed by the promoterThat Promoter undertaken development of the Project bearing Registration No. P50500013766 in various phases and at the time of registration of the said Project the estimated cost, as mentioned in the first paragraph of this declaration, was considered for those plots which were released or to be released immediately and the sanction of Building Map was obtained. Hence the total estimated cost was proportional to the released plots and sanctioned units. Now that all the plots have been released by the sanctioning authority and also all the Building Map sanctions of units have been received (exc

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Oct 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Oct 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 May 2024

Documents filed274

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 274 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - LegalFile: Form 4 Updted 14-02-2025.pdf17 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annexure F - Form 5.pdf7 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Updated_merged_compressed.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf12 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf12 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory.pdf12 Jul 2024
Certificates of CA (Form 3)File: Form 3_compressed.pdf12 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Plot No 56 to Plot No 63 Occupancy Certificate.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Architects Certificate - Unit I.pdf8 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Engineers Certificate - Unit I.pdf8 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A - Engineers Certificate For Quality Assurance - Unit I.pdf8 Apr 2024
Disclosure of sold/ booked inventoryFile: Himalaya Sunshine - Sold - Booked Inventory.pdf8 Apr 2024
Certificates of CA (Form 3)File: FORM 3 - Chartered Accountants Certificate - Unit I_compressed.pdf8 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architects Certificate Unit I.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineers Certificate Unit I.pdf20 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A Engineers Certificate For Quality Assurance Unit I.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory Unit I.pdf20 Jan 2024
Certificates of CA (Form 3)File: FORM 3 Chartered Accountants Certificate Unit I NEW.pdf20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Annual Report on Statement of Accounts.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf16 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf16 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Supervisor Certificate.pdf16 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold - Booked Inventory.pdf16 Nov 2023
Certificates of CA (Form 3)File: C A Certificate.pdf16 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architects Certificate.pdf26 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - Engineers Certificate.pdf26 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A - Site Supervisor’s Certificate.pdf26 Aug 2023
Disclosure of sold/ booked inventoryFile: Revised Format Sold - Booked Inventory.pdf26 Aug 2023
Certificates of CA (Form 3)File: FORM 3 - Chartered Accountant’s Certificate.pdf26 Aug 2023
Declaration in FORM BFile: FORM B UNIT I.pdf22 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Unit I.pdf22 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Unit I.pdf22 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf22 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold Booked Unit I.pdf22 Jun 2023
Certificates of CA (Form 3)File: Form 3 Unit I NEW.pdf22 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf22 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf22 May 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKD INVENTORY.pdf22 May 2023
Certificates of CA (Form 3)File: FORM 3_.pdf22 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificates 7 to 33 units.pdf16 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificates 34 to 55 units.pdf16 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM NO 5 UNIT 1.pdf13 Feb 2023
Building plan approvalFile: Building Permit and Plan Plot No 56.pdf15 Jun 2022
Building plan approvalFile: Building Permit and Plan Plot No 57.pdf15 Jun 2022
Building plan approvalFile: Building Permit and Plan Plot No 58.pdf15 Jun 2022
Building plan approvalFile: Building Permit and Plan Plot No 59.pdf15 Jun 2022
Building plan approvalFile: Building Permit and Plan Plot No 60.pdf15 Jun 2022
Building plan approvalFile: Building Permit and Plan Plot No 61.pdf15 Jun 2022
Building plan approvalFile: Building Permit and Plan Plot No 62.pdf15 Jun 2022
Building plan approvalFile: Building Permit and Plan Plot No 63.pdf15 Jun 2022
Building Plan Approval (IOD)File: Building Permit and Plan Plot No 56.pdf15 Jun 2022
Building Plan Approval (IOD)File: Building Permit and Plan Plot No 57.pdf15 Jun 2022
Building Plan Approval (IOD)File: Building Permit and Plan Plot No 58.pdf15 Jun 2022
Building Plan Approval (IOD)File: Building Permit and Plan Plot No 59.pdf15 Jun 2022
Building Plan Approval (IOD)File: Building Permit and Plan Plot No 60.pdf15 Jun 2022
Building Plan Approval (IOD)File: Building Permit and Plan Plot No 61.pdf15 Jun 2022
Building Plan Approval (IOD)File: Building Permit and Plan Plot No 62.pdf15 Jun 2022
Building Plan Approval (IOD)File: Building Permit and Plan Plot No 63.pdf15 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: Building Permit Plot No 56 Revised.pdf15 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: Building Permit Plot No 57.pdf15 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: Building Permit Plot No 58.pdf15 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: Building Permit Plot No 59.pdf15 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: Building Permit Plot No 60.pdf15 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: Building Permit Plot No 61.pdf15 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: Building Permit Plot No 62.pdf15 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: Building Permit Plot No 63.pdf15 Jun 2022
Certificates of CA (Form 3)File: Form 3 Unit 1.pdf4 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020-21_compressed.pdf30 Apr 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: NEW 12 Occupancy Certificate UPDATE.pdf13 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf22 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf22 Sep 2021
Disclosure of sold/ booked inventoryFile: SOLD BOOK INVENTORY.pdf22 Sep 2021
Certificates of CA (Form 3)File: Form 3_Sunshine Unit I new.pdf22 Sep 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate NEW.pdf22 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5.pdf25 Jan 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Himalaya Sunshine Engineers Certificate.pdf12 Mar 2020
Building plan approvalFile: Building Permit Plot No 48 NEW.pdf22 Feb 2020

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
HIMALAYA EMPIRETHE HIMALAYA EMPIRE APARTMENT KHASRA NO 82 2 4 AND 82 3PART MAUZA BABHULKHEDA SHATABDI SQUARE SOMALWADA BESA ROAD NAGPUR155CompletedSep 2016Sep 2016
HIMALAYA GALAXY-IIHIMALAYA GALAXY-II PLOT NO 59 60 AND 61 AMRAVATI ROAD NEAR UNIVERSITY CAMPUS NAGPUR18CompletedSep 2014Sep 2014
HIMALAYA GALAXY-IHIMALAYA GALAXY-I PLOT NO.62 & 63 AMRAVATI ROAD NEAR UNIVERSITY CAMPUS KACHIMET NAGPUR15CompletedApr 2014Apr 2014
HIMALAYA PRESTIGEHIMALAYA PRESTIGE APARTMENT CONDOMINIUM NEAR SBI COLONY OPPOSITE VRCE GATE SOUTH AMBAZARI ROAD NAGPUR36CompletedSep 2011Aug 2011

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one moved by 6 months
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HIMALAYA SUNSHINE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nagpur (M Corp.)2,800+ in Nagpur

2 kmHIMALAYA SUNSHINECompleted 3Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: HIMALAYA INFRAPROJECTS SUNSHINE

HIMALAYA INFRAPROJECTS SUNSHINE has 1 registration on MahaRERA, including HIMALAYA SUNSHINE. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that HIMALAYA SUNSHINE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if HIMALAYA SUNSHINE is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HIMALAYA SUNSHINE?

The registered promoter entity is HIMALAYA INFRAPROJECTS SUNSHINE, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HIMALAYA SUNSHINE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HIMALAYA SUNSHINE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HIMALAYA SUNSHINE?

The professionals named in the filing: Architect: RUPESH NAOGHARE; Engineer: P S PATANKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HIMALAYA SUNSHINE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HIMALAYA SUNSHINE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HIMALAYA SUNSHINE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.