HIMALAYA SUNSHINE LOTUS APARTMENTS
By HIMALAYA INFRAPROJECT SUNSHINE UNIT II
RG-MH-13449 · RERA P50500046089 · Last updated on MahaRERA portal: 8 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 27 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- All 5 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HIMALAYA SUNSHINE LOTUS APARTMENTS is a Others project by HIMALAYA INFRAPROJECT SUNSHINE UNIT II in Nagpur, Maharashtra, registered with MahaRERA as P50500046089 on 20 Jun 2022. Possession is promised by 31 Mar 2027. The completion date has moved by 27 months from the original filing. 45 of the 60 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameHIMALAYA SUNSHINE LOTUS APARTMENTS
- TypeOthers
- Location
- DABHA MAIN STREET
- DABHA
- Nagpur (M Corp.)
- Nagpur (Urban)
- Nagpur
- 440023
- Pincode440023
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500046089
- ReraGenie IDRG-MH-13449
Builder
- NameHIMALAYA INFRAPROJECT SUNSHINE UNIT II
- Entity typeOthers
- Named personsSunil Ramakrishna Duddalwar, SONAL SUNIL DUDDALWAR, KUNAL SUNIL DUDDALWAR
- Declared earlier projects6 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Jun 2022
- Promised completion31 Mar 2027
- Revised completionRevised to 31 Mar 2027 (originally 31 Dec 2024)
- Buildings1 building record
- Documents filed164 files
Current status
Figures as on 8 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| HIMALAYA SUNSHINE LOTUS APARTMENTS | NA | 12 | 11 | 45 | 15 | 60 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 96%.
HIMALAYA SUNSHINE LOTUS APARTMENTS: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 96% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 8 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed233
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| HIMALAYA SUNSHINE LOTUS APARTMENTS | NA | Rs 24.94 cr | Rs 27.51 cr |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RUPESH NAOGHARE |
| Engineer | MEGHAN PATWARDHAN |
| Engineer | Himanshu Sanjay Wankhede |
| Engineer | sandeep kuthe |
| Chartered Accountant | GOVILKAR AND ASSOCIATES |
| Chartered Accountant | Jodh Josh and Co |
| Chartered Accountant | RAVINDRA VIRENDRA LASHKARE |
| Chartered Accountant | Rishi Lashkare |
| Chartered Accountant | W S Korke & Co. |
| Partner | Role in project |
|---|---|
| HIMALAYA INFRAPROJECT SUNSHINE UNIT II | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterExtension is sought due to unavoidable circumstances including heavy rains in this monsoon season and also the Migration of Labor force to their native places for working on their farmlands the pace of construction activity substantially slowed down and was operational with only 25% manpower. The Labourers from neighbouring areas and States were engaged by our Contractors and since the rainy season was good and most of the labourers are also engaged in agricultural activity this has caused Reverse Migration of the Labourers to their farmlands resulting in considerable slackening of constructio
Reason as filed by the promoterI, Shri Sunil Duddalwar, promoter / authorized person of the said project, am writing to formally request an extension for the completion date of our residential development project known as HIMALAYA SUNSHINE LOTUS APARTMENT, located at Plot No. 66, Kh. No. 38, Mouza - Dabha, Tah. & Distt. - Nagpur; total admeasuring 2504.48 Sq. Mtrs. I, Shri Sunil Duddalwar, being the Authorized Signatory/Promoter of the project "HIMALAYA SUNSHINE LOTUS APARTMENT", bearing MahaRERA Registration No. P50500046089, do hereby solemnly declare as under: 1. That the construction work of the above-mentioned project
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Mar 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Jun 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Jun 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed164
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 164 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - Architects certificate - Himalaya Lotus - March 2026.pdf | 8 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 - Architects certificate - Himalaya Lotus - JUNE 2026.pdf | 8 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - Engineer certificate - Himalaya Lotus - March 2026.pdf | 8 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - Engineer certificate - Himalaya Lotus - JUNE 2026.pdf | 8 Aug 2026 |
| Withdrawal Update Form 3File: FORM 3 - CA Certificate - Himalaya Lotus - March 2026.pdf | 8 Aug 2026 |
| Withdrawal Update Form 3File: FORM 3 - CA Certificate - Himalaya Lotus - JUNE 2026.pdf | 8 Aug 2026 |
| Form 1File: Form 1 Architect Certificate June 2022.pdf | 28 Feb 2026 |
| Form 2File: Form 2 - Engineer Certificte June 2022.pdf | 28 Feb 2026 |
| Form 3File: Form 3 CA Certificate June 2022.pdf | 28 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold_ booked inventory.pdf | 28 Feb 2026 |
| Form 1File: 1 Architect Certificate Sep 2022.pdf | 28 Feb 2026 |
| Form 2File: Form 2 - Engineer Certificte Sep 2022.pdf | 28 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold_ booked inventory.pdf | 28 Feb 2026 |
| Form 3File: Form 3 CA Certificate Sep 2022.pdf | 28 Feb 2026 |
| Form 1File: Form 1 - March 2023.pdf | 27 Feb 2026 |
| Form 2File: Form 2 - March 2023.pdf | 27 Feb 2026 |
| Form 3File: Form 3 - March 2023.pdf | 27 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory - March 2023.pdf | 27 Feb 2026 |
| Form 1File: Form 1 Dec 2022.pdf | 27 Feb 2026 |
| Form 2File: Form 2 - Dec 2022.pdf | 27 Feb 2026 |
| Form 3File: Form 3 - Dec 2022.pdf | 27 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory - Dec 2022.pdf | 27 Feb 2026 |
| Form 1File: Himalay Sunshine Lotue Apartment - Form 1 - Oct 2025.pdf | 26 Feb 2026 |
| Form 2File: Himalaya Sunshine Lotus apartment - Form 2 - October - 2025.pdf | 26 Feb 2026 |
| Form 3File: Himalaya Sunshine Lotus Apartment - Form 3 - Octomber 25.pdf | 26 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Himalaya Sunshine Lotus Apartment - Disclosure of Sold Inventory - Oct 25.pdf | 26 Feb 2026 |
| Form 2A (FY 2022-2023)File: himalaya - Form 2 A - 2022-2023.pdf | 26 Feb 2026 |
| Form 2A (FY 2023-2024)File: himalaya - Form 2 A - 2023 - 2024.pdf | 26 Feb 2026 |
| Form 2A (FY 2024-2025)File: Himalaya - Form 2 A - 2024-2025.pdf | 26 Feb 2026 |
| Form 2A (FY 2025-2026)File: Himalaya - Form 2 A - 2025-2026.pdf | 26 Feb 2026 |
| Form 5 (FY 2024-2025)File: form - 5 - himalaya - march 25.pdf | 23 Feb 2026 |
| Form 5 (FY 2022-2023)File: Form 5 - Annual Report on Statenebt of Accounts - Lotus 2022-23.pdf | 16 Jan 2026 |
| Form 5 (FY 2023-2024)File: Form 5 - Lotus - 2023-2024.pdf | 16 Jan 2026 |
| Form 1File: Form 1 - Architect Certificate Lotus Sep 2025.pdf | 14 Jan 2026 |
| Form 2File: Form 2 Engineer Certificate - Lotus - Sep 2025.pdf | 14 Jan 2026 |
| Form 3File: Form 3 - Chartered Accountant Certificate - Lotus - Sep 2025.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold - Booked Inventory - Lotus Sep 2025.pdf | 14 Jan 2026 |
| Form 1File: Form 1 - Architect Certificate - Lotus - June 2025.pdf | 14 Jan 2026 |
| Form 2File: Form 2 - Engineer Certificate - Lotus June 2025.pdf | 14 Jan 2026 |
| Form 3File: Form 3 - Chartered Accountant Certificate - Lotus - June 2025.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold - Booked Inventory - Lotus - June 2025.pdf | 14 Jan 2026 |
| Form 1File: Form 1 - Architect Certificate - Lotus - March 2025.pdf | 14 Jan 2026 |
| Form 2File: Form 2 - Engineer Certificate - Lotus - March 2025.pdf | 14 Jan 2026 |
| Form 3File: Form 3 - Chartered Accountant Certificate - Lotus -March 2025.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold - Booked Inventory - Lotus - March 2025.pdf | 14 Jan 2026 |
| Form 1File: Form 1 - Architect Certificate - Lotus - Dec 2024.pdf | 14 Jan 2026 |
| Form 2File: Form 2 - Engineer Certificate - Lotus - Dec 2024.pdf | 14 Jan 2026 |
| Form 3File: Form 3 - Chartered Accountant Certificate - Lotus - Dec 2024.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold - Booked Inventory - Lotus - Dec 2024.pdf | 14 Jan 2026 |
| Form 1File: FORM 1 - Architect Certificate - Lotus - Sep 2024.pdf | 14 Jan 2026 |
| Form 2File: FORM 2 - Engineer Certificate - Lotus - Sep 2024.pdf | 14 Jan 2026 |
| Form 3File: FORM 3 - Chartered Accountant Certificate - Lotus Sep 2024.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold - Booked Inventory - Lotus - Sep 2024.pdf | 14 Jan 2026 |
| Form 1File: FORM 1 - Architect Certificate - Lotus - June 2024.pdf | 14 Jan 2026 |
| Form 2File: FORM 2 - Engineer Certificate - Lotus - June 2024.pdf | 14 Jan 2026 |
| Form 3File: FORM 3 - Chartered Accountant Certificate - Lotus - june 2024.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold - Booked Inventory - Lotus - June 2024.pdf | 14 Jan 2026 |
| Form 1File: FORM 1 - Architect Certificate - Lotus -March 2024.pdf | 14 Jan 2026 |
| Form 2File: FORM 2 - Engineer Certificate - Lotus -March 2024.pdf | 14 Jan 2026 |
| Form 3File: FORM 3 - Chartered Accountant Certificate - Lotus - March 2024.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Himalaya Sunshine Lotus Apartments - Sold - Booked Inventory March 2024.pdf | 14 Jan 2026 |
| Form 1File: FORM 1 - Architect Certificate - Lotus - Dec 2023.pdf | 14 Jan 2026 |
| Form 2File: FORM 2 - Engineer Certificate - Lotus - Dec 2023.pdf | 14 Jan 2026 |
| Form 3File: FORM 3 - Chartered Accountant Certificate - Lotus - Dec 2023.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold - Booked Inventory - Lotus -Dec 2023.pdf | 14 Jan 2026 |
| Form 1File: FORM 1 - Architects Certificate - Lotus -Sep 2023.pdf | 14 Jan 2026 |
| Form 2File: FORM 2 - Engineers Certificate - Lotus - Sep 2023.pdf | 14 Jan 2026 |
| Form 3File: FORM 3 - Chartered Accountant Certificate - Lotus - Sep 2023.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold - Booked Inventory - Lotus - Sep 2023.pdf | 14 Jan 2026 |
| Form 1File: Form 1 - Architect Certificate June 2023.pdf | 14 Jan 2026 |
| Form 2File: Form 2 - Engineer Certificate June 2023.pdf | 14 Jan 2026 |
| Form 3File: Form 3 - Chartered Accountant Certificate June 2023.pdf | 14 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Revised Format Sold - Booked Inventory June 2023.pdf | 14 Jan 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects.pdf | 10 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CACCertificate.pdf | 10 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate.pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Inventory.pdf | 10 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engineers Certificate.pdf | 10 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-03-2025.pdf | 7 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31-03-2025 New.pdf | 7 Apr 2025 |
Promoter's earlier projects5
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| HIMALAYA SUNSHINE APARTMENTS II | HIMALAYA SUNSHINE APARTMENTS II PLOT NO 67 HIMALAYA SUNSHINE LAYOUT CITY SURVEY NO 270 67 KH NO 38 SHEET NO 64 MOUZA DABHA NAGPUR | 128 | Completed | Jun 2022 | Dec 2021 |
| HIMALAYA EMPIRE | THE HIMALAYA EMPIRE APARTMENT KHASRA NO 82 2 4 AND 82 3PART MAUZA BABHULKHEDA SHATABDI SQUARE SOMALWADA BESA ROAD NAGPUR | 155 | Completed | Sep 2016 | Sep 2016 |
| HIMALAYA GALAXY-II | HIMALAYA GALAXY-II PLOT NO 59 60 AND 61 AMRAVATI ROAD NEAR UNIVERSITY CAMPUS NAGPUR | 18 | Completed | Sep 2014 | Sep 2014 |
| HIMALAYA GALAXY-I | CORPORATION HOUSE NO 1758G62 AND 1758G63 CITY SURVEY NO 55 AND SHEET NO 21 OF MAUZA KACHIMET NAGAR | 15 | Completed | Apr 2014 | Apr 2014 |
| HIMALAYA PRESTIGE | HIMALAYA PRESTIGE APARTMENT CONDOMINIUM NEAR SBI COLONY OPPOSITE VRCE GATE SOUTH AMBAZARI ROAD NAGPUR | 36 | Completed | Sep 2011 | Aug 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 164 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep HIMALAYA SUNSHINE LOTUS APARTMENTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DABHA2,800+ in Nagpur
Filed coordinates, straight-line distance. 28 registered projects within 2 km.
PREMIER HERITAGE WADDHAMNA -182
PREMIER HERITAGE
PREMIER HERITAGE WADDHAMNA -181
PREMIER HERITAGE
SHREE RAM EMPIRE
SANJAY PAIDLEWAR, NITISH CHORDIA AND SHISH
SDPL Aashray Dabha II
SANDEEP DWELLERS PVT. LTD.
PREMIER HERITAGE WADDHAMNA -183
PREMIER HERITAGE
SDPL Suvarnabhumi
SANDEEP DWELLERS PVT. LTD.
See every Nagpur project, with the district possession charts
Builder: HIMALAYA INFRAPROJECT SUNSHINE UNIT II
HIMALAYA INFRAPROJECT SUNSHINE UNIT II has 1 registration on MahaRERA, including HIMALAYA SUNSHINE LOTUS APARTMENTS. Its filings disclose 6 earlier MahaRERA projects: declares 6 of 6 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if HIMALAYA SUNSHINE LOTUS APARTMENTS is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HIMALAYA SUNSHINE LOTUS APARTMENTS?
The registered promoter entity is HIMALAYA INFRAPROJECT SUNSHINE UNIT II, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HIMALAYA SUNSHINE LOTUS APARTMENTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for HIMALAYA SUNSHINE LOTUS APARTMENTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HIMALAYA SUNSHINE LOTUS APARTMENTS?
The professionals named in the filing: Architect: RUPESH NAOGHARE; Engineer: MEGHAN PATWARDHAN; Engineer: Himanshu Sanjay Wankhede; Engineer: sandeep kuthe; Chartered Accountant: GOVILKAR AND ASSOCIATES; Chartered Accountant: Jodh Josh and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HIMALAYA SUNSHINE LOTUS APARTMENTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback