Hemanti Co-operative Housing Society
By Hemanti Sahakari Gruhrachana Sanstha Maryadit(Hemanti Co-operative Housing Society)
RG-MH-76269 · RERA P52100052338 · Last updated on MahaRERA portal: 27 May 2026
Source: official MahaRERA filing
Red flags
- Completion date moved by 9 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Hemanti Co-operative Housing Society is a Residential / Group Housing project by Hemanti Sahakari Gruhrachana Sanstha Maryadit(Hemanti Co-operative Housing Society) in Pune, Maharashtra, registered with MahaRERA as P52100052338 on 14 Aug 2023. The registration is recorded completed; possession was promised by 15 Sep 2026. The completion date has moved by 9 months from the original filing. 13 of the 28 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameHemanti Co-operative Housing Society
- TypeResidential / Group Housing
- Location
- Sahakar Nagar
- Parvati
- Haveli
- Pune
- 411009
- Pincode411009
- RERA no.P52100052338
- ReraGenie IDRG-MH-76269
Builder
- NameHemanti Sahakari Gruhrachana Sanstha Maryadit(Hemanti Co-operative Housing Society)
- Entity typeSociety
- ChairpersonKalpana Sharschandra Lagu
- SecretoryShaunak Vijay Tamhane
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on14 Aug 2023
- Promised completion15 Sep 2026
- Revised completionRevised to 15 Sep 2026 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed79 files
Current status
Figures as on 27 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A | NA | 8 | 8 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
Building A: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed45
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Hemanti Sahakari Gruhrachana Sanstha Maryadit | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building A | NA | Rs 7.64 cr | Rs 7.64 cr |
| - | NA | Rs 46.58 lakh | Rs 46.58 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | HRISHIKESH KULKARNI |
| Engineer | SACHIN DOSHI |
| Chartered Accountant | ANJK & CO LLP |
| Chartered Accountant | G N Mantri and Associates |
| Partner | Role in project |
|---|---|
| Hemanti Sahakari Gruhrachana Sanstha Maryadit(Hemanti Co-operative Housing Society) | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have received Completion Certificate no. OC No. OCC/0654/25 dated 19/09/2025. As the project has lapsed, we are currently unable to submit the correction application. Therefore, we are applying for an extension. Upon receipt of the extension approval, we will proceed with submitting the correction application, followed by the completion application.
Reason as filed by the promoterWe, Hemanti Sahakari Gruhrachana Sanstha Maryadit (Hemanti Co-operative Housing Society), hereby declare the following with respect to the project Hemanti Co-operative Housing Society bearing registration number P52100052338 registered under MahaRERA. The delay in the completion of the real estate project has been primarily caused by a delay in OC. The project is 100% completed, and we have received the Occupation Certificate (OC) on 19/09/2025 and we have also initiated the process for the possession as well. However, there is mismatch occurred in certain details on the MahaRERA profile as co
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Apr 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: Full OC.pdf | 27 May 2026 |
| Occupational CertificateFile: OC Verification.pdf | 27 May 2026 |
| Occupational CertificateFile: CC.pdf | 27 May 2026 |
| Occupational CertificateFile: CC Plan highlighted.pdf | 27 May 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 19 May 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 19 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 19 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 19 May 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 19 May 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 19 May 2026 |
| Withdrawal Update Form 1File: Sept 25 - Architect Certificate (Form-1).pdf | 3 Feb 2026 |
| Withdrawal Update Form 2File: Sept 25 - Engineeru0027s certificate (Form 2).pdf | 3 Feb 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3-Signed.pdf | 3 Feb 2026 |
| Form 2A (FY 2024-2025)File: Form 2A FY 2024-25 - signed.pdf | 6 Jan 2026 |
| Withdrawal Update Form 1File: Sept 25 - Architect Certificate (Form-1).pdf | 12 Dec 2025 |
| Withdrawal Update Form 2File: Sept 25 - Engineeru0027s certificate (Form 2).pdf | 12 Dec 2025 |
| Withdrawal Update Form 3File: Withdrawal Application Form3-Signed.pdf | 12 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form 5_FY 2024-25-signed.pdf | 12 Oct 2025 |
| Withdrawal Update Form 1File: Form 1 - Architectu0027s Certificate June 25.pdf | 15 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 - Engineeru0027s Certificate June 25.pdf | 15 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 - CA Certificate June 25.pdf | 15 Jul 2025 |
| Layout approvalFile: Layout Approval.pdf | 18 Apr 2025 |
| Building plan approvalFile: Building Plan.pdf | 18 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Layout Approval.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate Hemanti - March 2025.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate HSS March 2025 - Signed.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer's Certificate Hemanti - March 2025.pdf | 18 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 18 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory - March 2025.pdf | 18 Apr 2025 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate HSS December 2024_Signed.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer's Certificate.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory December 2024_Signed.pdf | 18 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Form 5 23-24 Hemanti Sahakari Society Signed.pdf | 30 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 13 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate HSS September 2024 - Sign.pdf | 13 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 13 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 13 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 16 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate HSS June 2024 Signed.pdf | 16 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 14 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 14 Aug 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised CC.pdf | 24 May 2024 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 24 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance Certificate.pdf | 24 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 17 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 17 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 17 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Signed.pdf | 17 May 2024 |
| Layout approvalFile: Layout Plan.pdf | 2 Apr 2024 |
| Building plan approvalFile: Building Plan.pdf | 2 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 2 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf | 2 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 25 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 25 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Signed.pdf | 25 Nov 2023 |
| Layout approvalFile: Layout Approval.pdf | 12 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance certificate with Finance and Legal.pdf | 12 Jul 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance certificate with Finance and Legal.pdf | 12 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: Layout Approval.pdf | 12 Jul 2023 |
| Declaration about Commencement CertificateFile: CC Declaration.pdf | 12 Jul 2023 |
| Declaration in FORM BFile: Form B Declaration by promoter and Authority Letter.pdf | 12 Jul 2023 |
| CERSAI detailsFile: Cersai Declaration.pdf | 12 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 12 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Mrs Kalpana S Lagu.pdf | 12 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Mr Shaunak V Tamhane.pdf | 12 Jul 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration on Seperate bank account.pdf | 12 Jul 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report on allotment letter.pdf | 12 Jul 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report on agreement draft.pdf | 12 Jul 2023 |
| Copy of the legal title reportFile: Legal Title Report_11zon.pdf | 8 Jul 2023 |
| CERSAI detailsFile: Cersai Assets Based.pdf | 8 Jul 2023 |
| Proforma of Agreement for saleFile: Agreement for Sale.pdf | 8 Jul 2023 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 8 Jul 2023 |
| Building plan approvalFile: Building Plan Approval.pdf | 7 Jul 2023 |
| PAN CardFile: Hemanti PAN.pdf | 7 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval.pdf | 7 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 2105 - Hemanti Commencement Certificate.pdf | 7 Jul 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 79 filed documents as one ZIP, foldered, with a manifest
Keep Hemanti Co-operative Housing Society on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Parvati13,700+ in Pune
Sai Towers
CITY ETHERNAL LLP
ARCO SKYLIFE
ARCO ENGINEERS
Shrirang Park
NBC PROJECTS
NYATI EMBLEM
NYATI CONSTRUCTION PRIVATE LIMITED
SHALIMAR
SONIGARA VENTURES
SUMEDHA
SHREE RAM BUILDERS & PROMOTERS
Builder: Hemanti Sahakari Gruhrachana Sanstha Maryadit(Hemanti Co-operative Housing Society)
Hemanti Sahakari Gruhrachana Sanstha Maryadit(Hemanti Co-operative Housing Society) has 1 registration on MahaRERA, including Hemanti Co-operative Housing Society. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Hemanti Co-operative Housing Society is delayed beyond 15 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Hemanti Co-operative Housing Society?
The registered promoter entity is Hemanti Sahakari Gruhrachana Sanstha Maryadit(Hemanti Co-operative Housing Society), a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Hemanti Co-operative Housing Society?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Hemanti Co-operative Housing Society?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Hemanti Co-operative Housing Society?
The professionals named in the filing: Architect: HRISHIKESH KULKARNI; Engineer: SACHIN DOSHI; Chartered Accountant: ANJK & CO LLP; Chartered Accountant: G N Mantri and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Hemanti Co-operative Housing Society?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback