Headquarters
By Mrs Gauri Abhishek Thakker Mr Deepak Bhagwandas Motwani and Gaurav Developers Pvt Ltd
RG-MH-05132 · RERA P51600023706 · Last updated on MahaRERA portal: 6 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Headquarters is a Commercial project by Mrs Gauri Abhishek Thakker Mr Deepak Bhagwandas Motwani and Gaurav Developers Pvt Ltd in Nashik, Maharashtra, registered with MahaRERA as P51600023706 on 2 Jan 2020. Possession is promised by 30 Dec 2028. 106 of the 179 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameHeadquarters
- TypeCommercial
- Location
- LINK ROAD
- GOVIND NAGAR
- Nashik
- 422009
- Pincode422009
- RERA no.P51600023706
- ReraGenie IDRG-MH-05132
Builder
- NameMrs Gauri Abhishek Thakker Mr Deepak Bhagwandas Motwani and Gaurav Developers Pvt Ltd
- Entity typePartnership
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Jan 2020
- Promised completion30 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed181 files
Current status
Figures as on 6 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Headquarters | NA | 17 | 17 | 1 | 178 | 179 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
Headquarters: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed205
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Headquarters | NA | Rs 10.45 cr | Rs 25.99 cr |
| - | NA | Rs 4.69 cr | Rs 5.91 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PDP ARCHITECTS |
| Architect | Darshan P Sancheti |
| Engineer | PRASHANT PATIL |
| Engineer | Sunil Nilkanth Ghodke |
| Chartered Accountant | s g pandit company |
| Chartered Accountant | Pandit Bhandari & Co. |
| Partner | Role in project |
|---|---|
| Mrs Gauri Abhishek Thakker Mr Deepak Bhagwandas Motwani and Gaurav Developers Pvt Ltd | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| FD No 1/2014 S C S No 63/2017 R C S No 383/2014 | Civil Court Nashik | Active |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Dec 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Aug 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2028
Documents filed181
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 181 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: HQ-Form2A-Engineering Certificate-dtd-31-03-2026.pdf | 6 Jul 2026 |
| Form 2A (FY 2024-2025)File: Form 2A Final.PDF | 21 May 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 19 May 2026 |
| Withdrawal Update Form 1File: form 1.pdf | 19 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 19 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 19 May 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 19 May 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 19 May 2026 |
| Form 1File: Form1.pdf | 18 May 2026 |
| Form 2File: Form 2.pdf | 18 May 2026 |
| Form 3File: Form 3.pdf | 18 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf | 18 May 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 03 H Q 31-03-2025.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 H Q ARC CERTIFICATE 2024 06 30.pdf | 12 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 H Q ARC CERTIFICATE 2024 09 30.pdf | 12 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 H Q ARC CERTIFICATE 2024 12 30.pdf | 12 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 H Q 2024 12 31.pdf | 8 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 H Q CONSO 2024 12 31.pdf | 28 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 H Q CONSO 2024 09 30.pdf | 11 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 H Q GDPL 2024 03 31.pdf | 11 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 H Q MOTWANI D B 2024 03 31.pdf | 11 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 H Q THAKKER G A 2024 03 31.pdf | 11 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: HQ AC GDPL (6).pdf | 18 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: HQ AC DEEPAK MOTWANI (4).pdf | 18 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: HQ AC THAKKER GAURI A (3).pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 H Q 2024 09 30.pdf | 16 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 30 6 2024_compressed.pdf | 22 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 30-6-2024.pdf | 22 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 HQ MAR 24_compressed.pdf | 3 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 H Q MAR24_compressed.pdf | 3 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3-Form No 2A-Certificate No P51600023706.pdf | 3 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 H Q CONSO 2024 03 31.pdf | 21 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC-2023.pdf | 14 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HQ-Form-1-Architect Certificate Dtd -31-12-2023.pdf | 1 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 H Q CONSO 2023 12 31.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HQ-Form No 1-Architect Certificate-Dtd-30-09-2023_compressed.pdf | 7 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEP-2023.pdf | 7 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 H Q CONSO 2023 09 30.pdf | 21 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 H Q GDPL.pdf | 30 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 H Q MOTWANI D B.pdf | 30 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June-23.pdf | 31 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: June-23.pdf | 31 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 - HQ June 23_11zon.pdf | 31 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 13 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 13 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf | 13 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon.pdf | 13 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 19-20 Deepak.pdf | 17 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 new 21-22 Deepak.pdf | 17 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 20.pdf | 15 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SEP-2022.pdf | 15 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEC-2022.pdf | 15 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HQ-Arch Certificate-FORM 1-DEC-2021.pdf | 15 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAR-2020.pdf | 15 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUN-2020.pdf | 15 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEP-2020.pdf | 15 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC-2020.pdf | 15 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAR-2021.pdf | 15 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC-2021.pdf | 15 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MAR-2022.pdf | 15 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUN-2022.pdf | 15 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: JUN-2022.pdf | 15 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: SEP-2022.pdf | 15 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: DEC-2022.pdf | 15 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June 2022.pdf | 15 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jun-2022.pdf | 15 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June 2022.pdf | 15 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 05 19-20 GAURAV.pdf | 15 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20 HEAD GAURI.pdf | 15 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 GAURI 21-22.pdf | 15 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mar-2020.pdf | 14 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mar 2020.pdf | 14 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: March 2020.pdf | 14 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: June 2020.pdf | 14 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- All 181 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Headquarters on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GOVIND NAGAR4,100+ in Nashik
STAR WORLD
DEEPAK KALYANJI CHANDE
VRAJ CENTRAL VISTA
DHAIRYA DEVELOPERS
ROONGTA TECHONE APARTMENT
SHREE TIRUMALA BUILDCON
VRAJ CAPITAL
KAPILAVASTU CREATORS
MAA BHAGWATI RESIDENCY APARTMENT
ROONGTA LANDMARKS LLP
THREE LEAVES PHASE ONE
DEEPAK INFRA AND HOMES PRIVATE LIMITED
See every Nashik project, with the district possession charts
Builder: Mrs Gauri Abhishek Thakker Mr Deepak Bhagwandas Motwani and Gaurav Developers Pvt Ltd
Mrs Gauri Abhishek Thakker Mr Deepak Bhagwandas Motwani and Gaurav Developers Pvt Ltd has 1 registration on MahaRERA, including Headquarters. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if Headquarters is delayed beyond 30 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Headquarters?
The registered promoter entity is Mrs Gauri Abhishek Thakker Mr Deepak Bhagwandas Motwani and Gaurav Developers Pvt Ltd, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Headquarters?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Headquarters?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Headquarters?
The professionals named in the filing: Architect: PDP ARCHITECTS; Architect: Darshan P Sancheti; Engineer: PRASHANT PATIL; Engineer: Sunil Nilkanth Ghodke; Chartered Accountant: s g pandit company; Chartered Accountant: Pandit Bhandari & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Headquarters?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback