ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Haware Paramount Kalyan Phase- III

Registered No litigation declared Others project

Haware Paramount Kalyan Phase- III

By Haware Properties LLP

RG-MH-19087 · RERA P51700078127 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 35.00 crore secured on the land, in favour of Aditya Birla Capital limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
0 of 44Construction stages doneacross 4 buildings; furthest along: Excavation, 0%
54 of 218Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

Haware Paramount Kalyan Phase- III is a Others project by Haware Properties LLP in Thane, Maharashtra, registered with MahaRERA as P51700078127 on 25 Nov 2024. Possession is promised by 31 Dec 2028. 164 of the 218 units on this registration are recorded sold or booked, and 0 of 44 construction stages are filed complete.

At a glance

Project

  • NameHaware Paramount Kalyan Phase- III
  • TypeOthers
  • Location
    • Survey No- 3/2 (Pt)
    • 3/5 (Pt)
    • 3/6
    • Muthaval
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700078127
  • ReraGenie IDRG-MH-19087

Builder

  • NameHaware Properties LLP
  • Entity typePartnership
  • LLPINAAJ-9305
  • GSTIN27AAKFH5456M1ZS
  • LLPIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersAmit Suresh Haware, Amar Suresh Haware
  • Other registrations9 more →

Key dates

this monthRegisteredNov 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Nov 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed64 files

Current status

75%164 of 218 units booked

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No- 11NA8864064
Building No- 10NA88541064
Building No- 09NA88351247
Building No-08NA8835843

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Excavation, at 0%.

Building No- 110%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No- 100%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No- 090%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building No-080%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed335

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots335
Closed/Covered109
Open Space226
BuildingClosed/CoveredOpen SpaceTotal
Building No- 11285785
Building No- 10275784
Building No- 09275683
Building No-08275683

Land and ownership15

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,120 sq m
Land owned byThe promoter, with other names on the file
Named landowners15
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital limited
Secured amountRs 35.00 crore
CERSAI search filedYes
Declared on13 Oct 2025
LandownerVillageDistrict
Ashutosh Anil BhamreMuthavalThane
Jaydeep Anil BhamreMuthavalThane
Suvarna Anil BhamreMuthavalThane
Reshma Ananta DatilkarMuthavalThane
Santosh Vasant BhamreMuthavalThane
Revantibai alias Jayvanti Bai Vasant BhamreMuthavalThane
Namdeo Kathod BhamreMuthavalThane
Sandeep Pandurang BhamreMuthavalThane
Subhash Pandurang BhamreMuthavalThane
Jitendra Arjun BhamreMuthavalThane
Chatrapati Arjun BhamreMuthavalThane
Fashibai Namdeo BhamreMuthavalThane
Sakhubai Namdeo BhamreMuthavalThane
Bhushan Namdeo BhamreMuthavalThane
Jagdish Namdeo BhamreMuthavalThane

Approvals and building plan

Sanctioning authorityDistrict Collector Thane
Permissible FSI14247.34
Proposed, not sanctioned9,247 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop No 14,15 16, Shri Ganesh Chs, Sector 1, Opp.Apna Bazar, Vashi, Navi Mumbai Dist.400703

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSaakaar Architects
ArchitectPB Associates
EngineerSaeed Shaikh
EngineerSK Consultants & Engineers
Chartered AccountantJain Sharat Chand & Co
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
Haware Properties LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Haware Paramount Kalyan Phase III as on Mar 26.pdf18 Apr 2026
Form 2File: Form 2 - Haware Paramount Kalyan Phase-III 31-03-2026.pdf18 Apr 2026
Form 3File: Form 3 of Haware Paramount Phase 3 as on 31-03-2026.pdf18 Apr 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Haware Paramount Phase 3 as on Mar 26.pdf18 Apr 2026
Form 1File: Form 1 - Haware Paramount Kalyan Phase III as on Dec 2025.pdf18 Apr 2026
Form 2File: Form 2 - Haware Paramount Kalyan Phase-III as on Dec 25.pdf18 Apr 2026
Form 3File: Form 3 - Haware Paramount Kalyan Phase III as on Dec 2025.pdf18 Apr 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Haware Paramount Phase 3 as on Dec 25.pdf18 Apr 2026
Form 1File: Form 1 - Haware Paramount Kalyan Phase III as on June 2025.pdf20 Oct 2025
Form 2File: Form 2 - Haware Paramount Kalyan Phase III as on June 2025.pdf20 Oct 2025
Form 3File: Form 3 - Haware Paramount Kalyan Phase III as on June 2025.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Haware Paramount Kalyan Phase III as on June 2025.pdf20 Oct 2025
Form 1File: Form 1 - Haware Paramount Kalyan Phase III as on Sep 2025.pdf20 Oct 2025
Form 2File: Form 2 - Haware Paramount Kalyan Phase III as on Sep 2025.pdf20 Oct 2025
Form 3File: Form 3 - Haware Paramount Kalyan Phase III as on Sep 2025.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Haware Paramount Kalyan Phase III as on Sep 2025.pdf20 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31122024 1.pdf4 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31032025.pdf4 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Haware Paramount Phase 3 as on 31-12-2024.pdf4 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Haware Paramount Phase 3 as on 31-03-2025.pdf4 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Haware Paramount Kalyan Phase III as on March 2025.pdf4 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Haware Paramount Kalyan Phase III as on December 2024.pdf4 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Haware Paramount Kalyan Phase III as on March 2025.pdf4 May 2025
Proforma of Allotment letterFile: Review_AL_Haware Paramount Kalyan Phase III_22102024.pdf23 Oct 2024
Deviation Report with respect to Allotment letterFile: No Deviation Report_AL_Haware Paramount Kalyan Phase III_ 22102024.pdf23 Oct 2024
Deviation Report with respect to model copy of AgreementFile: AFS_Deviation Report_ Haware Paraamount Kalyan Phase III_22102024.pdf23 Oct 2024
Proforma of Agreement for saleFile: Final AFS-Haware Paramount Phase 3.pdf23 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - All RERA Account.pdf22 Oct 2024
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (1).pdf19 Oct 2024
Details of encumbrances concerned to FinanceFile: 2 a Details of encumbrances concerned to Finance (1).pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Haware Paramount Kalyan Phase 3_11zon.pdf19 Oct 2024
Declaration about Commencement CertificateFile: Format D.pdf19 Oct 2024
CERSAI detailsFile: DECLARATION of Cersai.pdf19 Oct 2024
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (1).pdf19 Oct 2024
Details of encumbrances concerned to LegalFile: 2 a Details of encumbrances concerned to Finance (1).pdf19 Oct 2024
Other - FinanceFile: ilovepdf_merged.pdf19 Oct 2024
Other - TechnicalFile: 1 Other - Technical (11).pdf19 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured and unsecured finance availed for the project.pdf19 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Verification mail.pdf13 Aug 2024
Other - TechnicalFile: 2 Other - Technical (2).pdf13 Aug 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B (Only Promoter).pdf12 Aug 2024
Copy of the legal title reportFile: Latest Title Report Haware Paramount Phase 3_11zon.pdf10 Aug 2024
Declaration in FORM BFile: Affidavit Cum Declaration (Haware Paramount Kalyan Phase-3).pdf10 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate_11zon.pdf10 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexures A.pdf10 Jun 2024
Building plan approvalFile: Plan 9_11zon.pdf5 Jun 2024
Building plan approvalFile: Plan 8.pdf5 Jun 2024
Building plan approvalFile: Plan-7.pdf5 Jun 2024
Building plan approvalFile: Plan 6.pdf5 Jun 2024
Building plan approvalFile: Plan 5.pdf5 Jun 2024
Building plan approvalFile: Plan-4.pdf5 Jun 2024
Building plan approvalFile: Plan-3.pdf5 Jun 2024
Building plan approvalFile: Plan-2.pdf5 Jun 2024
Layout approvalFile: Plan-1.pdf5 Jun 2024
PAN CardFile: 1 PAN Card.pdf5 Jun 2024
Copy of Layout Approval (in case of layout)File: Plan-1.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan-7.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan-2.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan-3.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan-4.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 5.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 6.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 8.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 9_11zon.pdf5 Jun 2024

How this compares with Thane

75%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Haware Paramount Kalyan Phase- III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Muthaval7,600+ in Thane

2 kmHaware Paramount Kalyan Completed 2Lapsed / revoked 4Other 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 21 registered projects within 2 km.

Builder: Haware Properties LLP

Haware Properties LLP has 10 registrations on MahaRERA, including Haware My First Home Shil Phata Phase 1 Bldg 1 and Haware My First Home Shil Phata Phase 1 Bldg 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Haware Paramount Kalyan Phase- III is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Haware Paramount Kalyan Phase- III?

The registered promoter entity is Haware Properties LLP, a partnership as per the filing. Its LLPIN AAJ-9305 and GSTIN 27AAKFH5456M1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Haware Paramount Kalyan Phase- III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Haware Paramount Kalyan Phase- III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Haware Paramount Kalyan Phase- III?

The professionals named in the filing: Architect: Saakaar Architects; Architect: PB Associates; Engineer: Saeed Shaikh; Engineer: SK Consultants & Engineers; Chartered Accountant: Jain Sharat Chand & Co; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Haware Paramount Kalyan Phase- III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Haware Paramount Kalyan Phase- III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Haware Paramount Kalyan Phase- III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.