ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Haware Paramount Kalyan Phase 1

Registered No litigation declared Others project

Haware Paramount Kalyan Phase 1

By Haware Properties LLP

RG-MH-07651 · RERA P51700056061 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Rs 35.00 crore secured on the land, in favour of Aditya Birla Capital Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
8 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 95%
49 of 229Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

Haware Paramount Kalyan Phase 1 is a Others project by Haware Properties LLP in Thane, Maharashtra, registered with MahaRERA as P51700056061 on 10 May 2024. Possession is promised by 31 Dec 2028. 180 of the 229 units on this registration are recorded sold or booked, and 8 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameHaware Paramount Kalyan Phase 1
  • TypeOthers
  • Location
    • Survey No 3/2 Part and 3/5 Part
    • Muthaval Village
    • Muthaval
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700056061
  • ReraGenie IDRG-MH-07651

Builder

  • NameHaware Properties LLP
  • Entity typePartnership
  • LLPINAAJ-9305
  • GSTIN27AAKFH5456M1ZS
  • LLPIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • PartnerAmit Suresh Haware
  • Other registrations9 more →

Key dates

this monthRegisteredMay 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 May 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed84 files

Current status

79%180 of 229 units booked
20.9%Work done, per cost certificate

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bldg 1NA8810610116
Bldg 2NA88891099
Bldg 3NA3314014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

Bldg 141%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bldg 255%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises92%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bldg 322%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor30%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed196

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots196
Closed/Covered22
Open Space174
BuildingClosed/CoveredOpen SpaceTotal
Bldg 185866
Bldg 275865
Bldg 375865

Land and ownership15

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,050 sq m
Land owned byThe promoter, with other names on the file
Named landowners15
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 35.00 crore
CERSAI search filedYes
Declared on13 Oct 2025
LandownerVillageDistrict
Jagdish Namdeo BhamreMuthavalThane
Bhushan Namdeo BhamreMuthavalThane
Sakhubai Namdeo BhamreMuthavalThane
Fashibai Namdeo BhamreMuthavalThane
Chatrapati Arjun BhamreMuthavalThane
Jitendra Arjun BhamreMuthavalThane
Subhash Pandurang BhamreMuthavalThane
Sandeep Pandurang BhamreMuthavalThane
Namdeo Kathod BhamreMuthavalThane
Revantibai alias Jayvanti Bai Vasant BhamreMuthavalThane
Santosh Vasant BhamreMuthavalThane
Reshma Ananta DatilkarMuthavalThane
Suvarna Anil BhamreMuthavalThane
Jaydeep Anil BhamreMuthavalThane
Ashutosh Anil BhamreMuthavalThane

Approvals and building plan

Sanctioning authorityThane Collector Office
Permissible FSI11070.89
Proposed, not sanctioned8,471 sq m
Buildings approved4
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop No 14,15 16, Shri Ganesh Chs, Sector 1, Opp.Apna Bazar, Vashi, Navi Mumbai Dist.400703
Estimated costRs 29.09 cr
Cost incurredRs 6.09 cr
Work done20.95%
BuildingWingEstimatedIncurred
Bldg 1NARs 9.50 crRs 2.03 cr
Bldg 2NARs 9.50 crRs 2.03 cr
Bldg 3NARs 9.50 crRs 2.03 cr
-NARs 58.19 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSaakaar Architects
ArchitectPB Associates
EngineerPentacon Structural Consultants
EngineerSK Consultants & Engineers
Chartered AccountantSharat Jain
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
Haware Properties LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600200Bhakti AchrekarHaware Properties LLP27/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Haware Paramount Kalyan Phase 1 as on Mar 26.pdf18 Apr 2026
Withdrawal Update Form 2File: Form 2 - Haware Paramount Kalyan Phase 1 as on 31-03-2026.pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3 - Haware Paramount Kalyan Phase 1 as on 31-03-2026.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1 - Haware Paramount Kalyan Phase 1 as on Dec 2025.pdf25 Feb 2026
Withdrawal Update Form 2File: Form 2 - Haware Paramount Kalyan Phase 1 as on Dec 2025.pdf25 Feb 2026
Withdrawal Update Form 3File: Form 3 - Haware Paramount Kalyan Phase 1 as on Dec 2025.pdf25 Feb 2026
Withdrawal Update Form 1File: Form 1 - Haware Paramount Kalyan Phase 1as on June 2025.pdf24 Oct 2025
Withdrawal Update Form 1File: Form 1 - Haware Paramount Kalyan Phase 1 as on Sep 2025.pdf24 Oct 2025
Withdrawal Update Form 2File: Form 2 - Haware Paramount Kalyan Phase 1 as on June 2025.pdf24 Oct 2025
Withdrawal Update Form 2File: Form 2 - Haware Paramount Kalyan Phase 1 as on Sep 2025.pdf24 Oct 2025
Withdrawal Update Form 3File: Form 3 - Haware Paramount Kalyan Phase 1 as on June 2025.pdf24 Oct 2025
Withdrawal Update Form 3File: Form 3 - Haware Paramount Kalyan Phase 1 as on Sep 2025.pdf24 Oct 2025
Withdrawal Update Form 1File: Form 1 - Haware Paramount Kalyan Phase 1 as on Sep 2025.pdf22 Oct 2025
Withdrawal Update Form 2File: Form 2 - Haware Paramount Kalyan Phase 1 as on Sep 2025.pdf22 Oct 2025
Withdrawal Update Form 3File: Form 3 - Haware Paramount Kalyan Phase 1 as on Sep 2025.pdf22 Oct 2025
Form 1File: Form 1 - Haware Paramount Kalyan Phase 1 as on June 2024.pdf30 Aug 2025
Form 2File: Form 2 - Haware Paramount Kalyan Phase 1 as on June 2024.pdf30 Aug 2025
Form 3File: Form 3 - Haware Paramount Kalyan Phase 1 as on June 2024.pdf30 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Haware Paramount Kalyan Phase 1 as on June 2024.pdf30 Aug 2025
Form 1File: Form 1 - Haware Paramount Kalyan Phase 1 as on Sep 2024.pdf30 Aug 2025
Form 2File: Form 2 - Haware Paramount Kalyan Phase 1 as on Sep 2024.pdf30 Aug 2025
Form 3File: Form 3 - Haware Paramount Kalyan Phase 1 as on Sep 2024.pdf30 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Haware Paramount Kalyan Phase 1 as on Sep 2024.pdf30 Aug 2025
Form 1File: Form 1 - Haware Paramount Kalyan Phase 1 as on Dec 2024.pdf30 Aug 2025
Form 2File: Form 2 - Haware Paramount Kalyan Phase 1 as on Dec 2024.pdf30 Aug 2025
Form 3File: Form 3 - Haware Paramount Kalyan Phase 1 as on Dec 2024.pdf30 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Haware Paramount Kalyan Phase 1 as on Dec 2024.pdf30 Aug 2025
Form 1File: Form 1 - Haware Paramount Kalyan Phase 1 as on March 2025.pdf30 Aug 2025
Form 2File: Form 2 - Haware Paramount Kalyan Phase 1 as on March 2025.pdf30 Aug 2025
Form 3File: Form 3 - Haware Paramount Kalyan Phase 1 as on March 2025.pdf30 Aug 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Haware Paramount Kalyan Phase 1 as on March 2025.pdf30 Aug 2025
Withdrawal Update Form 1File: 30062024.pdf11 Aug 2025
Withdrawal Update Form 2File: Form 2 - Haware Paramount Kalyan Phase 1 as on June 2024.pdf11 Aug 2025
Withdrawal Update Form 3File: Form 3 - March 2025_compressed (1).pdf11 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30062024.pdf4 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30092024.pdf4 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31122024.pdf4 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31032025.pdf4 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Haware Paramount Phase 1 as on 30-06-2024.pdf4 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Haware Paramount Phase 1 as on 30-09-2024.pdf4 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Haware Paramount Phase 1 as on 31-12-2024.pdf4 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Haware Paramount Phase 1 as on 31-03-2025 Fi.pdf4 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Haware Paramount Kalyan Phase 1 as on June 2024.pdf4 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Haware Paramount Kalyan Phase 1 as on September 2024.pdf4 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Haware Paramount Kalyan Phase 1 as on December 2024.pdf4 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Haware Paramount Kalyan Phase 1 as on March 2025.pdf4 May 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Verification Haware Palms and Paramount.pdf30 Apr 2024
Other - TechnicalFile: Annexure A - Order No 50.pdf25 Apr 2024
Other - TechnicalFile: 1 Other - Technical (19) (1).pdf24 Apr 2024
Declaration in FORM BFile: FORM B - Haware Properties LLP - Haware Paramount Kalyan Phase 1.pdf26 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3_11zon.pdf26 Feb 2024
Proforma of Allotment letterFile: PROFORMA ALLOTMENT LETTER.pdf26 Feb 2024
Proforma of Agreement for saleFile: HAWARE PARAMOUNT PHASE '1' AGREEMENT FOR SALE 26Feb2024.pdf26 Feb 2024
Deviation Report with respect to Allotment letterFile: Deviation Report for Model Allotment Letter.pdf26 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report for Model Agreement.pdf26 Feb 2024
Copy of the legal title reportFile: Title Certificate Haware Paramount Phase 1_compressed.pdf23 Feb 2024
Details of encumbrances concerned to FinanceFile: Declaration Financial Encumbrances - Haware Paramount Phase 1.pdf23 Feb 2024
Details of encumbrances concerned to FinanceFile: Declaration Legal Encumbrances - Haware Paramount Phase 1.pdf23 Feb 2024
Details of encumbrances concerned to LegalFile: Declaration Financial Encumbrances - Haware Paramount Phase 1.pdf23 Feb 2024
Details of encumbrances concerned to LegalFile: Declaration Legal Encumbrances - Haware Paramount Phase 1.pdf23 Feb 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf23 Feb 2024
CERSAI detailsFile: DECLARATION ABOUT CERSAI.pdf23 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organizations.pdf23 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account.pdf23 Feb 2024
Layout approvalFile: Haware Paramount Phase 1 Approved Plan-1-pdf.pdf3 Feb 2024
Layout approvalFile: Haware Paramount Phase 1 Approved Plan-2.pdf3 Feb 2024
Layout approvalFile: Haware Paramount Phase 1 Approved Plan-3.pdf3 Feb 2024
Layout approvalFile: Haware Paramount Phase 1 Approved Plan-4.pdf3 Feb 2024
Layout approvalFile: Haware Paramount Phase 1 Approved Plan-5.pdf3 Feb 2024
Layout approvalFile: Haware Paramount Phase 1 Approved Plan-6.pdf3 Feb 2024
Layout approvalFile: Haware Paramount Phase 1 Approved Plan-7.pdf3 Feb 2024
Layout approvalFile: Haware Paramount Phase 1 Approved Plan-8.pdf3 Feb 2024
Building plan approvalFile: Haware Paramount Phase 1 CC_compressed.pdf3 Feb 2024
PAN CardFile: Haware Properties LLP Pan Card_compressed.pdf3 Feb 2024
Copy of Layout Approval (in case of layout)File: Haware Paramount Phase 1 Approved Plan-1-pdf.pdf3 Feb 2024
Copy of Layout Approval (in case of layout)File: Haware Paramount Phase 1 Approved Plan-2.pdf3 Feb 2024
Copy of Layout Approval (in case of layout)File: Haware Paramount Phase 1 Approved Plan-3.pdf3 Feb 2024
Copy of Layout Approval (in case of layout)File: Haware Paramount Phase 1 Approved Plan-4.pdf3 Feb 2024
Copy of Layout Approval (in case of layout)File: Haware Paramount Phase 1 Approved Plan-5.pdf3 Feb 2024
Copy of Layout Approval (in case of layout)File: Haware Paramount Phase 1 Approved Plan-6.pdf3 Feb 2024

How this compares with Thane

79%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Haware Paramount Kalyan Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Muthaval Village7,600+ in Thane

2 kmHaware Paramount Kalyan Completed 2Lapsed / revoked 4Other 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 21 registered projects within 2 km.

Builder: Haware Properties LLP

Haware Properties LLP has 10 registrations on MahaRERA, including Haware My First Home Shil Phata Phase 1 Bldg 1 and Haware My First Home Shil Phata Phase 1 Bldg 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Haware Paramount Kalyan Phase 1 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Haware Paramount Kalyan Phase 1?

The registered promoter entity is Haware Properties LLP, a partnership as per the filing. Its LLPIN AAJ-9305 and GSTIN 27AAKFH5456M1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Haware Paramount Kalyan Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Haware Paramount Kalyan Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Haware Paramount Kalyan Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Haware Paramount Kalyan Phase 1?

The professionals named in the filing: Architect: Saakaar Architects; Architect: PB Associates; Engineer: Pentacon Structural Consultants; Engineer: SK Consultants & Engineers; Chartered Accountant: Sharat Jain; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Haware Paramount Kalyan Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Haware Paramount Kalyan Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Haware Paramount Kalyan Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.