ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Haware Paradise

Registration lapsed No litigation declared Residential / Group Housing project

Haware Paradise

By Suresh Kashinath Haware

RG-MH-10211 · RERA P51700000844 · Last updated on MahaRERA portal: 19 Jul 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 55 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2022Possession promised55 months past this date
99 of 110Construction stages doneacross 10 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 40 documents Report an error

Haware Paradise is a Residential / Group Housing project by Suresh Kashinath Haware in Thane, Maharashtra, registered with MahaRERA as P51700000844 on 23 Jul 2017. Possession was promised by 30 Mar 2022 and is now 55 months past that date.

At a glance

Project

  • NameHaware Paradise
  • TypeResidential / Group Housing
  • Location
    • Village Road
    • On Kalyan Bapgaon Road
    • Muthaval
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700000844
  • ReraGenie IDRG-MH-10211

Builder

  • NameSuresh Kashinath Haware
  • Entity typeIndividual
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live2 lapsed, de-registered or revoked

Key dates

55 months past promisethis monthRegisteredJul 2017PromisedMar 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on23 Jul 2017
  • Promised completion30 Mar 2022
  • Revised completionNone
  • Buildings10 building records
  • Documents filed40 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
KNA50000
LNA50000
MNA50000
NNA50000
ONA50000
PNA50000
QNA50000
RNA50000
BungalowNA20000
SNA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building10

As on 19 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

99 of 110 construction stages are filed complete across 10 buildings. The stage furthest along is Excavation, at 0%.

K100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
L100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
M100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
N100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
O100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
P100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Q100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
R100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bungalow100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
S0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities23

As on 19 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Library with WIFIYes0%
GymYes0%
Childrens Play AreaYes0%
Swimming PoolYes0%
Sports MulticourtYes0%
Main Gate with CCTV SecurityYes0%
Decorative Entrance LobbyYes0%
Indoor GamesYes0%

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered1
Open Space7
BuildingClosed/CoveredOpen SpaceTotal
K011
L011
Q011
R022
Bungalow022
S101

Land and ownership15

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,370 sq m
Land owned byThe promoter, with other names on the file
Named landowners15
LandownerVillageDistrict
Manglya Sardu BhamreMuthavalThane
Nivrutti Appa BhamreMuthavalThane
Vitthal Appa BhamreMuthavalThane
Jagannath Sardu BhamreMuthavalThane
Balaram Shivram BhamreMuthavalThane
Leelaram Shivram BhamreMuthavalThane
Sudam Shivram BhamreMuthavalThane
Dinkar Shivram BhamreMuthavalThane
Kashinath Dattu BhamreMuthavalThane
Vaman Budhaji BhamreMuthavalThane
Bemtya Budhaji BhamreMuthavalThane
Santosh Vasant BhamreMuthavalThane
Bhagwan Dattu BhamreMuthavalThane
Gurunath Budhaji BhamreMuthavalThane
Sunil Bemtya BhamreMuthavalThane

Approvals and building plan

Permissible FSI11370.0
Proposed, not sanctioned11,218 sq m
Buildings approved10
Buildings sanctioned10

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSec 17, Vashi, Navi Mumbai

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSaakaar Architects
EngineerPentacon Structural Consultants Pvt Ltd
EngineerSaeed Shaikh
PartnerRole in project
Suresh Kashinath Haware-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Jul 2022

Documents filed40

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30-09-2017_compressed.pdf19 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-12-2017_compressed.pdf19 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-03-2018_compressed.pdf19 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30-06-2018_compressed.pdf19 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30-09-2018_compressed.pdf19 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-12-2018_compressed.pdf19 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-03-2019_compressed.pdf19 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30-06-2019_compressed.pdf19 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 30-09-2019_compressed.pdf19 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 31-12-2019_compressed.pdf19 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 PARADISE - 30-9-2017.pdf19 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 PARADISE - 31-12-2017.pdf19 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 PARADISE - 31-03-2018.pdf19 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 PARADISE - 30-06-2018.pdf19 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 PARADISE - 30-09-2018.pdf19 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 PARADISE - 31-12-2018.pdf19 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 PARADISE - 31-03-2019.pdf19 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 PARADISE - 30-06-2019.pdf19 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 PARADISE - 30-09-2019.pdf19 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 PARADISE - 31-12-2019.pdf19 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Haware Paradise Form - 2A - Engineer's Certificate (Quality Assurance) 2019-20.pdf21 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Haware Paradise Form - 2A - Engineer's Certificate (Quality Assurance) 2020-21.pdf21 Jul 2022
Disclosure of sold/ booked inventoryFile: Haware Paradise DISCLOSURE OF SOLD.pdf21 Jul 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PARADISE OC 14-12-2019.pdf21 Jul 2022
Details of encumbrancesFile: Haware paradise encumbrance.pdf14 Nov 2019
Certificates of CA (Form 5)File: Paradise.pdf15 Dec 2018
Proforma of Allotment letterFile: 7 Haware Paradise Allotment Letter and Agreement Draft RERA.pdf15 Jul 2017
Certificates of CA (Form 3)File: 11 Haware Paradise Form 3 CA 14 Jul 2017.pdf14 Jul 2017
Layout approvalFile: 10 Haware Paradise Layout Approval.pdf13 Jul 2017
Copy of Layout Approval (in case of layout)File: 10 Haware Paradise Layout Approval.pdf13 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 4 Haware Paradise CC and Letter Dated 8 Jul 2016.pdf13 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 3 Haware Paradise CC and Letter 2 April 2016.pdf13 Jul 2017
Declaration in FORM BFile: 0 Form B Suresh Kashinath Haware Haware Paradise.pdf13 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 8 Haware Paradise FORM1 13 Jul 2017.pdf13 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 9 Haware Paradise Form 2 Engineer.pdf13 Jul 2017
Building plan approvalFile: 6 Self Declaration regarding IOD Haware Paradise.pdf12 Jul 2017
Details of encumbrancesFile: 5 Self Declaration regarding encumbrances Haware Paradise.pdf12 Jul 2017
Building Plan Approval (IOD)File: 6 Self Declaration regarding IOD Haware Paradise.pdf12 Jul 2017
PAN CardFile: Suresh Haware Pan Card.pdf11 Jul 2017
Copy of the legal title reportFile: 1 Haware Paradise Title Certificate.pdf11 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Haware Paradise on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near On Kalyan Bapgaon Road7,600+ in Thane

2 kmHaware ParadiseCompleted 2Lapsed / revoked 3Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 21 registered projects within 2 km.

Builder: Suresh Kashinath Haware

Suresh Kashinath Haware has 6 registrations on MahaRERA, including Haware Pinnacle and Haware Paradise. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Haware Paradise shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Haware Paradise is delayed beyond 30 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Haware Paradise?

The registered promoter entity is Suresh Kashinath Haware, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Haware Paradise?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Haware Paradise?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Haware Paradise?

The professionals named in the filing: Architect: Saakaar Architects; Engineer: Pentacon Structural Consultants Pvt Ltd; Engineer: Saeed Shaikh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Haware Paradise?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Haware Paradise. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Haware Paradise to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.