Harmony Residency Wing D

By FAKHRI INFRAVENTURES

RG-MH-69498 · RERA P50500054946 · Last updated on MahaRERA portal: 13 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 95%
8 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

Harmony Residency Wing D is a Residential / Group Housing project by FAKHRI INFRAVENTURES in Nagpur, Maharashtra, registered with MahaRERA as P50500054946 on 21 Feb 2024. Possession is promised by 31 Mar 2028. 16 of the 24 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameHarmony Residency Wing D
  • TypeResidential / Group Housing
  • Location
    • BESA P.S.K 38
    • BESA
    • Nagpur (Rural)
    • Nagpur
    • 440027
  • Pincode440027
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500054946
  • ReraGenie IDRG-MH-69498

Builder

  • NameFAKHRI INFRAVENTURES
  • Entity typePartnership
  • PartnersKHUZAIMA KUTBUDDIN MAIMOON, Shabbir Ali Husain, Juzar bhai Abdeali Bhai Thekawala, Ali Asger Abdeali Bhai Thekawala, Mohamed Husain Abde Ali
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2024PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Feb 2024
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed62 files

Current status

67%16 of 24 units booked
65.5%Work done, per cost certificate

Figures as on 13 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Harmony Residency Wing DNA8724024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.

Harmony Residency Wing D: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed45

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots45
Closed/Covered1
Open Space44

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,469 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Sep 2025

Approvals and building plan

Sanctioning authorityNagar Panchayat Besa Pipla
Permissible FSI2014.1
Proposed, not sanctioned2,014 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Patni Bhanwan , Gandhibagh, Nagpur 440002
Estimated costRs 6.75 cr
Cost incurredRs 4.42 cr
Work done65.53%
BuildingWingEstimatedIncurred
Harmony Residency Wing DNARs 6.75 crRs 4.42 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRajendra R Sulke
ArchitectAshfaque Husain
EngineerAshfaque Husain
Chartered AccountantParvez Ali and Co
Chartered AccountantNooruddin Husain
PartnerRole in project
FAKHRI INFRAVENTURES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1 harmony.pdf13 May 2026
Withdrawal Update Form 1File: Form1 Jan-March26 Fakhri.pdf13 May 2026
Withdrawal Update Form 2File: form 2- harmony.pdf13 May 2026
Withdrawal Update Form 2File: Form2 Jan-March26 Fakhri.pdf13 May 2026
Withdrawal Update Form 3File: form 3- harmony.pdf13 May 2026
Withdrawal Update Form 3File: Form3 Jan-March26 Fakhri.pdf13 May 2026
Withdrawal Update Form 1File: from 1 fakhri.pdf26 Nov 2025
Withdrawal Update Form 2File: form 2 fakhri.pdf26 Nov 2025
Withdrawal Update Form 3File: form 3 fakhri.pdf26 Nov 2025
Form 5 (FY 2024-2025)File: form 5 fakhri.pdf26 Nov 2025
Withdrawal Update Form 1File: Fakhri Form1April June25.pdf17 Sep 2025
Withdrawal Update Form 2File: Fakhri Form2 April June25.pdf17 Sep 2025
Withdrawal Update Form 3File: Fakhri Form3 April June25.pdf17 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Harmony-D.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Harmony-D_compressed.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Harmony -D.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: HARMONY-D Sold Booked Inventory Disclosure 31-03-2025 (2).pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1, fakhri infraventures.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form- 3 fakhri infraventures compressed.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form no 2, fakhri infraventures.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_compressed.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form2.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: sold inventory.pdf21 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form5.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Harmony D.pdf25 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Harmony D.pdf25 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 harmony D_compressed.pdf25 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form1 harmony.pdf24 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 harmony wing d.pdf23 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Harmony wing d_compressed.pdf23 Apr 2024
Declaration about Commencement CertificateFile: MAHA RERA letter BESA PIPLI.pdf15 Feb 2024
Declaration about Commencement CertificateFile: order 50 delcration cum Annexure-A.pdf1 Feb 2024
Declaration about Commencement CertificateFile: CC VERIFICATION MAIL.pdf1 Feb 2024
Layout approvalFile: D wing Highlighted plan copy page 3_compressed.pdf24 Jan 2024
Building plan approvalFile: D wing Highlighted plan copy page 1_compressed.pdf24 Jan 2024
Building plan approvalFile: D wing Highlighted plan copy page 2_compressed_compressed.pdf24 Jan 2024
Building plan approvalFile: D wing Highlighted plan copy page 3_compressed.pdf24 Jan 2024
PAN CardFile: Fakhri PAN Edit.pdf24 Jan 2024
Copy of the legal title reportFile: Legal Title Report_compressed.pdf24 Jan 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE CONCERNED TO FINANCE (1).pdf24 Jan 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE CONCERNED TO LEGAL (1).pdf24 Jan 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE CONCERNED TO FINANCE (1).pdf24 Jan 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE CONCERNED TO LEGAL (1).pdf24 Jan 2024
Copy of Layout Approval (in case of layout)File: D wing Highlighted plan copy page 3_compressed.pdf24 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: D wing Highlighted plan copy page 1_compressed.pdf24 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: D wing Highlighted plan copy page 2_compressed_compressed.pdf24 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: D wing Highlighted plan copy page 3_compressed.pdf24 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: COMENCMENT CERTIFICATE.pdf24 Jan 2024
Declaration about Commencement CertificateFile: NEW DECLARATION ABOUT COMMENCEMNT CERTIFICATE (2).pdf24 Jan 2024
Declaration in FORM BFile: form b.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf24 Jan 2024
CERSAI detailsFile: CERSAI UNDERTAKING (1).pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Fakhri_compressed.pdf24 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloser of intrest 1ST PARTNER.pdf24 Jan 2024
Proforma of Agreement for saleFile: AGREEMENT1 TO SELL RERA_FORMAT.pdf24 Jan 2024
Proforma of Allotment letterFile: Allotment Letter (1) (1).pdf24 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: seprate account disclouser (1).pdf24 Jan 2024
Deviation Report with respect to Allotment letterFile: Deviation Report With Respect to the Allotment Letter.pdf24 Jan 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT OF MODEL COPY OF AGREEMENT (1).pdf24 Jan 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Harmony Residency Phase-1Plot No.135 To 144 and 178 To 189 Kh. No 66-A-1 and 66-B32CompletedAug 2016Aug 2016

How this compares with Nagpur

67%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Harmony Residency Wing D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BESA2,800+ in Nagpur

2 kmHarmony Residency Wing DCompleted 12Lapsed / revoked 18Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 51 registered projects within 2 km.

Builder: FAKHRI INFRAVENTURES

FAKHRI INFRAVENTURES has 3 registrations on MahaRERA, including BABJI ENCLAVE and Harmony Residency. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Harmony Residency Wing D is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Harmony Residency Wing D?

The registered promoter entity is FAKHRI INFRAVENTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Harmony Residency Wing D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Harmony Residency Wing D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Harmony Residency Wing D?

The professionals named in the filing: Architect: Rajendra R Sulke; Architect: Ashfaque Husain; Engineer: Ashfaque Husain; Chartered Accountant: Parvez Ali and Co; Chartered Accountant: Nooruddin Husain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Harmony Residency Wing D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Harmony Residency Wing D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Harmony Residency Wing D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.