Home / Browse projects / Raigarh, Maharashtra / Harmony Residency

Registered No litigation declared Residential / Group Housing project

Harmony Residency

By Harmony Realtors

RG-MH-07214 · RERA P52000054988 · Last updated on MahaRERA portal: 24 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 12 months from the original
3 of 11Construction stages donefurthest along: Stilt Floor, 60%
45 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

Harmony Residency is a Residential / Group Housing project by Harmony Realtors in Raigarh, Maharashtra, registered with MahaRERA as P52000054988 on 21 Feb 2024. Possession is promised by 31 Mar 2027. The completion date has moved by 12 months from the original filing. 11 of the 56 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameHarmony Residency
  • TypeResidential / Group Housing
  • Location
    • Sector- 54
    • Dronagiri
    • Uran
    • Raigarh
    • 400702
  • Pincode400702
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000054988
  • ReraGenie IDRG-MH-07214

Builder

  • NameHarmony Realtors
  • Entity typePartnership
  • PartnersHarsh Chatarlal Jain, Sushila C Jain

Key dates

this monthRegisteredFeb 2024First promiseMar 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Feb 2024
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed91 files

Current status

20%11 of 56 units booked
47.7%Work done, per cost certificate

Figures as on 24 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-Wing and B-WingNA8756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 60%.

A-Wing and B-Wing: 46% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor60%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises37%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks59%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.7%

Progress on shared amenities15

As on 24 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Open Space30

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area600 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra
Permissible FSI2399.68
Proposed, not sanctioned2,361 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Plot No- 107, Rajesh Building, J P Road, Andheri West- 400058
Estimated costRs 6.50 cr
Cost incurredRs 3.10 cr
Work done47.72%
BuildingWingEstimatedIncurred
A-Wing and B-WingNARs 6.17 crRs 3.09 cr
-NARs 32.50 lakhRs 1.08 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtul Patel Architects
EngineerSK Consultants & Engineers
EngineerShahaji Tanpure
EngineerKuldeep Singh
Chartered AccountantNB Sayed & Associates
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
Harmony Realtors-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA12022619812Mar 2026 → Mar 2027

Reason as filed by the promoterThe project construction is substantially completed and only minor finishing works remain. However, the application for Occupancy Certificate (OC) is currently pending due to delay in approvals from the concerned local authority. Since the issuance of OC is essential for project completion and handover, additional time is required to obtain the same. The delay is purely administrative and beyond the control of the promoter. Therefore, an extension is sought to complete the remaining minor works and secure the Occupancy Certificate in compliance with RERA provisions. Given the circumstances, we

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Harmony Residency.pdf24 Jul 2026
Withdrawal Update Form 2File: Harmony_Residency_Form2_Q1_2026-27_24-07-2026_07-10.pdf24 Jul 2026
Withdrawal Update Form 3File: Harmony_Residency_Form3_Q1_2026-27_20-07-2026_15-21_doc1.pdf24 Jul 2026
Layout approvalFile: Highlighted Plan Harmony Residency-1.pdf8 Jun 2026
Building plan approvalFile: Highlighted Plan Harmony Residency-2.pdf8 Jun 2026
Form 2A (FY 2023-2024)File: Form 2A 23-24 Signed.pdf3 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A 24-25 Signed.pdf3 Jun 2026
Form 5 (FY 2023-2024)File: Form 5 23-24 Signed.pdf3 Jun 2026
Withdrawal Update Form 1File: Form 1 - Harmony Residency as on March 2026.pdf22 May 2026
Withdrawal Update Form 2File: Form 2 - Harmony Residency as on March 2026.pdf22 May 2026
Withdrawal Update Form 3File: Form 3 - Harmony Residency as on March 2026.pdf22 May 2026
Form 5 (FY 2024-2025)File: Form 5 for Harmony Residency FY 2024-25.pdf26 Feb 2026
Withdrawal Update Form 1File: Form 1 - Harmony Residency as on Dec 2025.pdf18 Jan 2026
Withdrawal Update Form 2File: Form 2 - Harmony Residency as on Dec 2025.pdf18 Jan 2026
Withdrawal Update Form 3File: Form 3 - Harmony Residency as on Dec 2025.pdf18 Jan 2026
Withdrawal Update Form 1File: Form 1 - Harmony Residency as on Sep 2025.pdf17 Nov 2025
Withdrawal Update Form 2File: Form 2 - Harmony Residency as on Sep 2025.pdf17 Nov 2025
Withdrawal Update Form 3File: Form 3 - Harmony Residency as on Sep 2025.pdf17 Nov 2025
Form 1File: Form 1 - Harmony Residency as on Sep 2025.pdf19 Oct 2025
Form 2File: Form 2 - Harmony Residency as on Sep 2025.pdf19 Oct 2025
Form 3File: Form 3 - Harmony Residency as on Sep 2025.pdf19 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Harmony Residency as on Sep 2025.pdf19 Oct 2025
Form 1File: Form 1 - Harmony Residency as on June 2025.pdf20 Jul 2025
Form 2File: Form 2 - Harmony Residency as on June 2025.pdf20 Jul 2025
Form 3File: Form 3 - Harmony Residency as on June 2025.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Harmony Residency as on June 2025.pdf20 Jul 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - Mar 2024.pdf24 May 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - Jun 2024.pdf24 May 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - Sep 2024.pdf24 May 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - Dec 2024.pdf24 May 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - Mar 2025.pdf24 May 2025
Declaration about Commencement CertificateFile: FORMAT D.pdf24 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24) signed.pdf14 May 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - Dec 2024.pdf7 May 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - Mar 2025.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Apr 2025
Layout approvalFile: Plan 1.pdf21 Apr 2025
Building plan approvalFile: Plan 2.pdf21 Apr 2025
Copy of Layout Approval (in case of layout)File: Plan 1.pdf21 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf21 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 2024 SIGNED.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Harmony Residency as on March 2025.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Harmony Residency as on 31-03-2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Harmony Residency as on March 2025.pdf20 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - 2024 (Harmony Residency) SIGNED.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Harmony Residency as on 31-03-2024.pdf19 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Harmony Residency as on 30-06-2024.pdf19 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Harmony Residency as on 30-09-2024.pdf19 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Harmony Residency as on 31-12-2024.pdf19 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Harmony Residency as on March 2024.pdf19 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Harmony Residency as on June 2024.pdf19 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Harmony Residency as on Sep 2024.pdf19 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Harmony Residency as on Dec 2024.pdf19 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Harmony Residency - FY 2023-24.pdf19 Mar 2025
Layout approvalFile: Plan 1.pdf13 Mar 2025
Building plan approvalFile: Plan 2.pdf13 Mar 2025
Copy of Layout Approval (in case of layout)File: Plan 1.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Harmony Residency as on March 2024.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Harmony Residency as on June 2024.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Harmony Residency as on Sep 2024.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Harmony Residency as on Dec 2024.pdf13 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf13 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf13 Mar 2025
Other - LegalFile: Partenership deed_11zon.pdf24 Jan 2024
Other - TechnicalFile: 1 Other - Technical (8) (1).pdf24 Jan 2024
Other - LegalFile: LEASE DEED (5)_11zon (1).pdf23 Jan 2024
Other - LegalFile: 3RD TP WITH HARMONY REALTORS (1)_11zon.pdf23 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A(Pending Details).pdf20 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (4) (1).pdf9 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: output (68) (1).pdf12 Dec 2023
Copy of the legal title reportFile: Short Title_Harmony Residency_Harmony Realtors_16012024_11zon.pdf9 Dec 2023
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (7) (1).pdf9 Dec 2023
Details of encumbrances concerned to FinanceFile: 2 a Details of encumbrances concerned to Finance (7) (1).pdf9 Dec 2023
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (7) (1).pdf9 Dec 2023
Details of encumbrances concerned to LegalFile: 2 a Details of encumbrances concerned to Finance (7) (1).pdf9 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf9 Dec 2023
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (12) (1).pdf9 Dec 2023

How this compares with Raigarh

20%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Harmony Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dronagiri5,900+ in Raigarh

2 kmHarmony ResidencyCompleted 43Lapsed / revoked 16Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 101 registered projects within 2 km.

Builder: Harmony Realtors

Harmony Realtors has 1 registration on MahaRERA, including Harmony Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Harmony Residency is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Harmony Residency?

The registered promoter entity is Harmony Realtors, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Harmony Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Harmony Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Harmony Residency?

The professionals named in the filing: Architect: Atul Patel Architects; Engineer: SK Consultants & Engineers; Engineer: Shahaji Tanpure; Engineer: Kuldeep Singh; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Harmony Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Harmony Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Harmony Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.