Home / Browse projects / Thane, Maharashtra / HARISHREE RESIDENCY-2
HARISHREE RESIDENCY-2
RG-MH-98264 · RERA P51700013198 · Last updated on MahaRERA portal: 16 Jun 2021
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 2 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
HARISHREE RESIDENCY-2 is a Residential / Group Housing project by HARISHREE CREATIONS in Thane, Maharashtra, registered with MahaRERA as P51700013198 on 18 Sep 2017. The registration is recorded completed; possession was promised by 30 Dec 2021.
At a glance
Project
- NameHARISHREE RESIDENCY-2
- TypeResidential / Group Housing
- Location
- Ambarnath(M Cl)
- Ambarnath
- Thane
- 421501
- Pincode421501
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700013198
- ReraGenie IDRG-MH-98264
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on18 Sep 2017
- Promised completion30 Dec 2021
- Revised completionNone
- Buildings2 building records
- Documents filed23 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 9 | 0 | 0 | 0 | 0 |
| WING B | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 16 Jun 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 80%.
WING A44%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING B45%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 16 Jun 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 0% |
Parking filed13
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WING A | 4 | 4 | 8 |
| WING B | 3 | 2 | 5 |
Land and ownership14
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| CHHAGAN BABURAO CHANDANSHIV | Ambarnath(M Cl) | Thane |
| SMT. JAMUNA SHATRUGHNA MEGADE | Ambarnath(M Cl) | Thane |
| NANDKUMAR GANPATRAO BHENDE | Ambarnath(M Cl) | Thane |
| BAPU CHANDRAPPA VADAVRAO | Ambarnath(M Cl) | Thane |
| SIDDHARTH GARBAD TAYDE | Ambarnath(M Cl) | Thane |
| UDAY SURESH TAYDE | Ambarnath(M Cl) | Thane |
| RAJENDRA PRAHALAD UBALE | Ambarnath(M Cl) | Thane |
| MADHUKAR DHARMAJI RAMTEKE | Ambarnath(M Cl) | Thane |
| SHALINI SHANKAR GAIKWAD | Ambarnath(M Cl) | Thane |
| SURYABHAN ANAJI TAYDE | Titwala | Thane |
| GOVIND CHINDHA SONAWANE | Ambarnath(M Cl) | Thane |
| ASHOK MOHANLAL RAIKWAR | Kalyan-Dombivali (M Corp.) | Thane |
| SATYAVAN JANU JADHAV | Badlapur (M Cl) | Thane |
| SHRIDHAR SADASHIV ADANGLE | Ambarnath(M Cl) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SAMARTHYA ENGINEERS JITENDRA PATEL |
| Engineer | SAAD CONSULTANT DARSHAN KASTURE |
| Partner | Role in project |
|---|---|
| HARISHREE CREATIONS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Sep 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Sep 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Oct 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 16 Jun 2021
Documents filed23
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: O C HRC 2.pdf | 16 Jun 2021 |
| Architect’s Certificate on Completion of Project (Form 4)File: HR2 FORM-4.pdf | 16 Jun 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form5.pdf | 2 Jan 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Hc-2 17-18.pdf | 25 Dec 2019 |
| Building plan approvalFile: Sheet 2 of 2 pdf.pdf | 9 Oct 2018 |
| Building plan approvalFile: Sheet 2 of 2 pdf.pdf | 9 Oct 2018 |
| Building plan approvalFile: Sheet 1of 2 pdf.pdf | 9 Oct 2018 |
| Building Plan Approval (IOD)File: Sheet 2 of 2 pdf.pdf | 9 Oct 2018 |
| Building Plan Approval (IOD)File: Sheet 2 of 2 pdf.pdf | 9 Oct 2018 |
| Building Plan Approval (IOD)File: Sheet 1of 2 pdf.pdf | 9 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Revise CC.pdf | 9 Oct 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Revice CC Resize.pdf | 9 Oct 2018 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate.PDF | 14 Sep 2017 |
| Layout approvalFile: Sub Division Plan.PDF | 8 Sep 2017 |
| Building plan approvalFile: Plan Copy.pdf | 8 Sep 2017 |
| PAN CardFile: pancrad HRC.pdf | 8 Sep 2017 |
| Copy of the legal title reportFile: Title PlotNo 2 .pdf | 8 Sep 2017 |
| Details of encumbrancesFile: NO ENCUMBERNANCE CERTIFICATE Plot no2.PDF | 8 Sep 2017 |
| Copy of Layout Approval (in case of layout)File: Sub Division Plan.PDF | 8 Sep 2017 |
| Building Plan Approval (IOD)File: Plan Copy.pdf | 8 Sep 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Plot No 2.pdf | 8 Sep 2017 |
| Declaration in FORM BFile: FORM B Harishree Creations.PDF | 8 Sep 2017 |
| Proforma of Allotment letterFile: Draft Agreement and allotment letter.pdf | 8 Sep 2017 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| HARISHREE RESIDENCY-1P51700013029 | Ambarnath(M Cl), Thane | 156 | Sep 2017 | Completed | Dec 2021 | Mar 2020 |
| NILKANTH HILLS UPVAN | NEAR SHREE COMPLEX | 185 | - | Completed | Mar 2017 | Feb 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 23 filed documents as one ZIP, foldered, with a manifest
Keep HARISHREE RESIDENCY-2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ambarnath(M Cl)7,600+ in Thane
Filed coordinates, straight-line distance. 159 registered projects within 2 km.
CHADHA RESIDENCY
CHADHA DEVELOPERS AND PROMOTERS
KRUSHNA VIHAR - PHASE I
KRUSHAN DHAM BUILDERS & DEVELOPERS
VISHWAJEET MYSPACE
GULABRAO BABURAO KARANJULE PATIL
KHATRI SPARSH
KHATRI REALTY
Tulsi Galaxy
Manas Associates
WALEKAR HOMES
WALEKAR & SON'S DEVELOPERS
See every Thane project, with the district possession charts
Builder: HARISHREE CREATIONS
HARISHREE CREATIONS has 3 registrations on MahaRERA, including HARISHREE RESIDENCY-1 and HARISHREE RESIDENCY-2. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if HARISHREE RESIDENCY-2 is delayed beyond 30 Dec 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of HARISHREE RESIDENCY-2?
The registered promoter entity is HARISHREE CREATIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in HARISHREE RESIDENCY-2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for HARISHREE RESIDENCY-2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at HARISHREE RESIDENCY-2?
The professionals named in the filing: Architect: SAMARTHYA ENGINEERS JITENDRA PATEL; Engineer: SAAD CONSULTANT DARSHAN KASTURE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in HARISHREE RESIDENCY-2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback