ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / HARI VITTHAL APARTMENTS

Registration lapsed No litigation declared Residential / Group Housing project

HARI VITTHAL APARTMENTS

By NIWAS ENTERPRISES

RG-MH-43491 · RERA P52100046938 · Last updated on MahaRERA portal: 13 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
7 of 11Construction stages donefurthest along: External plumbing and external plaster, 85%
0Complaints at MahaRERAon this registration
Jump to the 47 documents Report an error

HARI VITTHAL APARTMENTS is a Residential / Group Housing project by NIWAS ENTERPRISES in Pune, Maharashtra, registered with MahaRERA as P52100046938 on 20 Sep 2022. Possession was promised by 1 Jun 2026 and is now 4 months past that date.

At a glance

Project

  • NameHARI VITTHAL APARTMENTS
  • TypeResidential / Group Housing
  • Location
    • TULSHIBAUGWALE COLONY SAHAKAR NAGAR PARVATI
    • PUNE
    • Pune (M Corp.)
    • Pune City
    • 411009
  • Pincode411009
  • RERA no.P52100046938
  • ReraGenie IDRG-MH-43491

Builder

  • NameNIWAS ENTERPRISES
  • Entity typePartnership
  • GSTIN27AADFN4455H1Z7
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersSANGITA RATNAKAR GODSE, SANGITA RATNAKAR GODSE
  • Other registrations14 more →
  • Completed7 of 15
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

4 months past promisethis monthRegisteredSep 2022PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on20 Sep 2022
  • Promised completion1 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed47 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
HARI VITHHAL APARTMENTNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 85%.

HARI VITHHAL APARTMENT: 83% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 13 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes25%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes35%
Solid Waste Management And DisposalYes40%
Water conservation /Rain water harvestingYes35%
Energy managemcntYes25%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered1
Open Space23

Land and ownership7

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area426 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
LandownerVillageDistrict
VRUSHALI CHANDRASHEKHAR KULKARNISatara (M Cl)Satara
PRABHAKAR DATTATRAY THOSARMumbai CityMumbai City
SHRIRAM PANDITPune (M Corp.)Pune
Mr. Sanjay Datatray KadamParvatiPune
Mr. Vasant Ganesh PatankarBIROBAWADIPune
Mr.Jayant Ramchandra VijapureParvatiPune
Mr. Prakash Nattu PanditParvatiPune

Approvals and building plan

Permissible FSI1786.75
Proposed, not sanctioned876 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTILAK ROAD BRANCH PUNE

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Chartered AccountantN B Sayed & Associates
PartnerRole in project
Niwas Enterprises-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed47

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2023-2024)File: Form 5 of Hari Vitthal Apartments FY 2023-24.pdf13 Jun 2026
Form 5 (FY 2024-2025)File: Form 5 of Hari Vitthal Apartments FY 2024-25.pdf13 Jun 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Hari Vitthal as on Dec 2024.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Hari Vitthal as on Dec 2024.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Hari Vithal Apartments as on Dec 2024.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Hari Vithal Apartments as on March 2025.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Hari Vitthal as on June 2024.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Hari Vitthal as on Sep 2024.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Hari Vitthal as on June 2024.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Hari Vitthal as on Sep 2024.pdf19 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of Hari Vitthal Apartments FY 2023-24.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Hari Vithal Apartments as on Sep 2024.pdf10 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Doc1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Hari Vitthal as on 31st December 2023.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Hari Vitthal as on March 2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Hari Vitthal as on 31st December 2023.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Hari Vitthal as on 31st March 2024.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on 31-03-2023.pdf26 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Hari Vitthal as on 31st March 2023.pdf26 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: New Format Form 5 Hari Vitthal Apartments.pdf26 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-09-22.pdf24 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-12-22.pdf24 Mar 2023
Disclosure of sold/ booked inventoryFile: Circular 29 - Hari Vithhal.pdf24 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Hari Vitthal as on 30-09-2022.pdf24 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Hari Vitthal as on 31-12-2022.pdf24 Mar 2023
Other - LegalFile: AFS_NIWAS_07092022.pdf8 Sep 2022
Other - LegalFile: Allotment letter_ Niwas_07092022.pdf8 Sep 2022
Deviation Report with respect to Allotment letterFile: Allotment -Deviation Hari Vitthal.pdf7 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Agreement -Deviation.pdf7 Sep 2022
Proforma of Allotment letterFile: allotment letter.pdf5 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank account delcaration.pdf5 Aug 2022
Details of encumbrances concerned to FinanceFile: financial encumbrances.pdf27 Jul 2022
Details of encumbrances concerned to LegalFile: legal encumb.pdf27 Jul 2022
CERSAI detailsFile: CERSAI.pdf27 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed.pdf27 Jul 2022
Layout approvalFile: Plan_2.pdf13 Jul 2022
Building plan approvalFile: Plan_2.pdf13 Jul 2022
PAN CardFile: NIWAS_PAN_CARD.pdf13 Jul 2022
Copy of the legal title reportFile: Search_Report.pdf13 Jul 2022
Copy of Layout Approval (in case of layout)File: Plan_2.pdf13 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan_2.pdf13 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement_certificate.pdf13 Jul 2022
Declaration about Commencement CertificateFile: form d.pdf13 Jul 2022
Declaration in FORM BFile: Declaration_-_Hari_Vitthal.pdf13 Jul 2022

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
RAJENDRAPLOT NO 26 KOHINOR COLONY SAHAKAR NAGAR 2 PUNE - 4110098CompletedJan 2018Oct 2017
PUSHPAMEDHPLOT NO 39 40 TULSIBAGHWALE COLONY SAHAKAR NAGAR 2 PUNE 41100920CompletedJan 2017Jan 2017
KASTURIPLOT NO 5 SR NO 28 CTS NO 1463 HINGE KHURD6CompletedDec 2013Dec 2013

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HARI VITTHAL APARTMENTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

Builder: NIWAS ENTERPRISES

NIWAS ENTERPRISES has 15 registrations on MahaRERA, including PARVATI VANDAN and MANAS. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that HARI VITTHAL APARTMENTS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if HARI VITTHAL APARTMENTS is delayed beyond 1 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HARI VITTHAL APARTMENTS?

The registered promoter entity is NIWAS ENTERPRISES, a partnership as per the filing. Its GSTIN 27AADFN4455H1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HARI VITTHAL APARTMENTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HARI VITTHAL APARTMENTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HARI VITTHAL APARTMENTS?

The professionals named in the filing: Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HARI VITTHAL APARTMENTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HARI VITTHAL APARTMENTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HARI VITTHAL APARTMENTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.