ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / HARI SAGAR

Registration lapsed No litigation declared Residential / Group Housing project

HARI SAGAR

By BHAKTI ENTERPRISES

RG-MH-00706 · RERA P51600000630 · Last updated on MahaRERA portal: 29 Apr 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • Completion date moved by 72 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
56 of 66Construction stages doneacross 6 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

HARI SAGAR is a Residential / Group Housing project by BHAKTI ENTERPRISES in Nashik, Maharashtra, registered with MahaRERA as P51600000630 on 18 Jul 2017. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 72 months from the original filing.

At a glance

Project

  • NameHARI SAGAR
  • TypeResidential / Group Housing
  • Location
    • Lam road
    • Deolali
    • Nashik
    • 422401
  • Pincode422401
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600000630
  • ReraGenie IDRG-MH-00706

Builder

  • NameBHAKTI ENTERPRISES
  • Entity typePartnership
  • PartnerMANOHAR JAGUMAL KARDA
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

16 months past promisethis monthRegisteredJul 2017First promiseJun 2019Revised toJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Jul 2017
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 30 Jun 2019)
  • Buildings6 building records
  • Documents filed90 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A TYPENA20000
C TYPENA40000
D TYPENA40000
E TYPENA20000
F TYPENA40000
B TYPENA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 29 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

56 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Podiums (if any), at 0%.

A TYPE91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C TYPE91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D TYPE91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E TYPE91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
F TYPE55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B TYPE91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes90%
Street LightingYes75%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes75%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes75%

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Closed/Covered34
BuildingClosed/CoveredTotal
A TYPE22
C TYPE66
D TYPE1212
E TYPE22
F TYPE66
B TYPE66

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,360 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2755.43
Proposed, not sanctioned2,222 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 10 - 18, Sai Plaza, Poona Road, Near Bytco College, Nashik, Maharashtra 422214

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHARAM PAPNEJA
PartnerRole in project
BHAKTI ENTERPRISES-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51600002201Jun 2019 → Jun 2020

Reason as filed by the promoterThe Project has received certificate for part completion from authority dated on 19th April, 2018. Hence, the extension is sought as we are on the verge of obtaining Occupancy Certificate from the competent authority. The document will be uploaded on the MAHARERA Site as soon as the same is received.

EXT51600009685Jun 2019 → Dec 2021

Reason as filed by the promoterConstruction work is getting delayed due to strict norms of lockdown imposed by government during this pandemic. Hence extension is required. We have uploaded the completion certificates of the buildings hence the consent is not taken from the allottees of such project. Further there are no bookings in the buildings for which extension is being sought.

EXT51600012942Jun 2019 → Jun 2025

Reason as filed by the promoterConstruction is being delayed due to unavoidable reason

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: HARI SAGAR.pdf29 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari sagar.pdf26 Apr 2024
Details of encumbrancesFile: Encumbrance certificate (1)_page-0001.pdf24 Feb 2024
Details of encumbrances concerned to FinanceFile: Encumbrance certificate finance_page-0001.pdf24 Feb 2024
Details of encumbrances concerned to LegalFile: Encumbrance certificate finance_page-0001.pdf24 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank acc details_page-0001_page-0001.pdf24 Feb 2024
Deviation Report with respect to Allotment letterFile: Encumbrance certificate-model allotment letter_page-0001.pdf24 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Encumbrance certificate-model agreement_page-0001.pdf24 Feb 2024
Certificates of CA (Form 3)File: Hari Sagar.pdf23 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: hari sagar.pdf22 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Hari sagar.pdf22 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Hari Sagar.pdf22 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: hari sagar.pdf22 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Hari sagar.pdf21 Feb 2024
Certificates of CA (Form 3)File: Hari sagar.pdf21 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Hari Sagar.pdf20 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Hari sagar.pdf20 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Hari sagar.pdf20 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Hari sagar.pdf20 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Hari Sagar.pdf20 Feb 2024
Certificates of CA (Form 3)File: H Sagar.pdf20 Feb 2024
Certificates of CA (Form 3)File: Hari Sagar (2).pdf20 Feb 2024
Certificates of CA (Form 3)File: hari Sagar (2).pdf20 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Sagar.pdf17 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Sagar.pdf17 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Sagar.pdf17 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Sagar.pdf17 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Sagar.pdf17 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Sagar.pdf17 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hari Sagar.pdf17 Feb 2024
Disclosure of sold/ booked inventoryFile: Hari Sagar.pdf17 Feb 2024
Disclosure of sold/ booked inventoryFile: Hari Sagar.pdf17 Feb 2024
Disclosure of sold/ booked inventoryFile: Hari Sagar.pdf17 Feb 2024
Disclosure of sold/ booked inventoryFile: Hari Sagar.pdf17 Feb 2024
Disclosure of sold/ booked inventoryFile: Hari sagar.pdf17 Feb 2024
Disclosure of sold/ booked inventoryFile: Hari Sagar.pdf17 Feb 2024
Disclosure of sold/ booked inventoryFile: H Sagar.pdf17 Feb 2024
Disclosure of sold/ booked inventoryFile: SAGAR (2).pdf19 Dec 2022
Disclosure of sold/ booked inventoryFile: SAGAR300922.pdf19 Dec 2022
Disclosure of sold/ booked inventoryFile: HARI SAGAR (2)_page-0001.pdf24 Nov 2022
Disclosure of sold/ booked inventoryFile: HARI SAGAR.pdf29 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Hari Sagar.pdf5 Apr 2022
Disclosure of sold/ booked inventoryFile: hari sagar.pdf10 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: HARI SAGAR.pdf5 Feb 2022
Disclosure of sold/ booked inventoryFile: Hari Sagar June.pdf29 Oct 2021
Disclosure of sold/ booked inventoryFile: Hari Sagar September.pdf29 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Sagar 20-21.pdf13 Oct 2021
Disclosure of sold/ booked inventoryFile: Hari Sagar.pdf9 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Hari Sagar.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: Hari Sagar.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Bhakti- Hari sagar_compressed.pdf30 Sep 2021
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE-Sagar.pdf15 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM-2A - 19-20-sagar.pdf15 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM-2A.pdf19 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5-Sagar-2019-20.pdf30 Sep 2020
Certificates of CA (Form 5)File: Form 5_Hari Sagar.pdf30 Sep 2019
Building plan approvalFile: Nisarg-Plan 1.pdf22 Oct 2018
Building plan approvalFile: Hari Sagar-Revised plan-1.pdf22 Oct 2018
Building plan approvalFile: Hari Sagar-Revised plan-2.pdf22 Oct 2018
Building Plan Approval (IOD)File: Nisarg-Plan 1.pdf22 Oct 2018
Building Plan Approval (IOD)File: Hari Sagar-Revised plan-1.pdf22 Oct 2018
Building Plan Approval (IOD)File: Hari Sagar-Revised plan-2.pdf22 Oct 2018
Certificates of CA (Form 5)File: Form 5 - Hari Sagar.pdf30 Sep 2018
Layout approvalFile: 1.pdf18 Jul 2017
Building plan approvalFile: 1.pdf18 Jul 2017
Building plan approvalFile: 2.pdf18 Jul 2017
Building plan approvalFile: 3.pdf18 Jul 2017
Building plan approvalFile: 4.pdf18 Jul 2017
Building plan approvalFile: 6.pdf18 Jul 2017
Building plan approvalFile: 8.pdf18 Jul 2017
Building plan approvalFile: 7-ilovepdf-compressed.pdf18 Jul 2017
Building plan approvalFile: 5-ilovepdf-compressed (1).pdf18 Jul 2017
Copy of Layout Approval (in case of layout)File: 1.pdf18 Jul 2017
Building Plan Approval (IOD)File: 1.pdf18 Jul 2017
Building Plan Approval (IOD)File: 2.pdf18 Jul 2017
Building Plan Approval (IOD)File: 3.pdf18 Jul 2017
Building Plan Approval (IOD)File: 4.pdf18 Jul 2017
Building Plan Approval (IOD)File: 6.pdf18 Jul 2017
Building Plan Approval (IOD)File: 8.pdf18 Jul 2017
Building Plan Approval (IOD)File: 7-ilovepdf-compressed.pdf18 Jul 2017

How this compares with Nashik

10%of Nashik projects moved their completion datethis one moved by 72 months
19%of Nashik registrations have lapsed or been cancelledthis one is among them

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep HARI SAGAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Deolali4,100+ in Nashik

2 kmHARI SAGARCompleted 7Lapsed / revoked 4Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 23 registered projects within 2 km.

Builder: BHAKTI ENTERPRISES

BHAKTI ENTERPRISES has 3 registrations on MahaRERA, including HARI SAGAR and BHAKTI AURA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What does it mean that HARI SAGAR shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if HARI SAGAR is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of HARI SAGAR?

The registered promoter entity is BHAKTI ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in HARI SAGAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for HARI SAGAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at HARI SAGAR?

The professionals named in the filing: Architect: DHARAM PAPNEJA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in HARI SAGAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About HARI SAGAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save HARI SAGAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.