ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / GULAB SRUSHTI

Completed No litigation declared Residential / Group Housing project

GULAB SRUSHTI

By BUTTEPATIL PROPERTIES

RG-MH-22607 · RERA P52100031652 · Last updated on MahaRERA portal: 6 Nov 2024

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Internal walls, 80%
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

GULAB SRUSHTI is a Residential / Group Housing project by BUTTEPATIL PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100031652 on 3 Nov 2021. The registration is recorded completed; possession was promised by 31 Dec 2023.

At a glance

Project

  • NameGULAB SRUSHTI
  • TypeResidential / Group Housing
  • Location
    • GUJRAT COLONY
    • KOTHRUD
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100031652
  • ReraGenie IDRG-MH-22607

Builder

  • NameBUTTEPATIL PROPERTIES
  • Entity typePartnership
  • GSTIN27AALFB1805H1ZN
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersRAJENDRA GULABRAO BUTTEPATIL, GULABRAO VITTHALRAO BUTTEPATIL, SHANTANU GULABRAO BUTTEPATIL, SHALINI GULABRAO BUTTEPATIL, SHEETAL RAJENDRA BUTTEPATIL
  • Other registrations9 more →
  • Completed5 of 10
  • Past their filed date2
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2021PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Nov 2021
  • Promised completion31 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GULAB SRUSHTINA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

GULAB SRUSHTI: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area832 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
RAKESH PANAVKAR & OTHERSPune (M Corp.)Pune
SANJAYKUMAR RANKA & OTHERSPune (M Corp.)Pune
VILAS MEMANE & OTHERSPune (M Corp.)Pune
DYANESHWAR MEMANE & OTHERSPune (M Corp.)Pune

Approvals and building plan

Permissible FSI2594.62
Proposed, not sanctioned2,595 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPRABHAT ROAD PUNE

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANGESH GOTAL
EngineerKALPESH MANANI
Chartered AccountantAMBAR NAIK
PartnerRole in project
BUTTEPATIL PROPERTIES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100018314Dec 2023 → Jun 2024

Reason as filed by the promoterWe would request you to extend our project completion date by 6 months due to technical issues for the final plan sanctioning & also we got the sanctions from the competent authority late than the estimated time

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Apr 2024

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Gualb Srushti Society Reg Certificate.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA G Srushti 31 Mar2024 C.pdf21 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA G Srushti 30 June 2024 C.pdf21 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 G SRUSHTI MAR 24.pdf21 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 20240405165731 rotated.pdf12 Apr 2024
Architect’s Certificate on Completion of Project (Form 4)File: Architect Form 4 Gulab Srushti .pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gulab Srushti Dec 2023.pdf18 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A MARCH 22.pdf26 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A MARCH 23.pdf26 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A MAR 22.pdf25 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A MAR 23.pdf25 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 MAR 23.pdf25 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Q3 EC 21-22.pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Q4 EC 21-22.pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Q1 EC 22-23.pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Q2 EC 22-23.pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Q3 EC 22-23.pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Q4 EC 22-23.pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Q1 EC 23-24.pdf20 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Q2 EC 23-24.pdf20 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5 Q3 EC 22-23.pdf20 Dec 2023
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Unsold.pdf20 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q 4 CA 21-22 2.pdf20 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q 1 CA 22-23 3.pdf20 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q 2 CA 22-23 4.pdf20 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q 3 CA 22-23 5.pdf20 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q 4 CA 22-23 6.pdf20 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q 1 CA 23 -24 7.pdf20 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q 2 CA 23 -24 8.pdf20 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: GULAB SRUSHTI FORM 5 22-23.pdf20 Dec 2023
Declaration in FORM BFile: Affidavit cum Declaration.pdf18 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 AC 21-22.pdf18 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q 4 AC 21-22.pdf18 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q 1 AC 22-23 3.pdf18 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q 2 AC 22-23 4.pdf18 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q 3 AC 22-23 5.pdf18 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q 4 AC 22-23 6.pdf18 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q 1 AC 23-24 7.pdf18 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q 2 AC 23-24 8.pdf18 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A 21-22.pdf18 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A 22-23.pdf18 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q 4 AC 21-22 2.pdf18 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q 1 AC 22-23 3.pdf18 Dec 2023
Building plan approvalFile: Scan_2920-02.pdf6 Nov 2023
Building plan approvalFile: Scan_2920-01_compressed (1).pdf6 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Scan_2920-02.pdf6 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Scan_2920-01_compressed (1).pdf6 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: 20231106212455.pdf6 Nov 2023
Building plan approvalFile: Kothrud Plan 2nd.pdf25 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Kothrud Plan 2nd.pdf25 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: 20230324221341.pdf25 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GULAB SRUSHTI FORM 5 MAR-2022.pdf8 Feb 2023
Building plan approvalFile: 721 PLAN GS UPTO 3RD.pdf27 Oct 2021
Layout approvalFile: cOPY OF LAYOUT.pdf27 Oct 2021
Copy of the legal title reportFile: Title REPORT KOTHRUD.pdf27 Oct 2021
Details of encumbrancesFile: ENCUMBRANCE CERTI.pdf27 Oct 2021
Copy of Layout Approval (in case of layout)File: cOPY OF LAYOUT.pdf27 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: 721 PLAN GS UPTO 3RD.pdf27 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Kothrud CC.pdf27 Oct 2021
Declaration about Commencement CertificateFile: COMMENCEMENT DECLARATION.pdf27 Oct 2021
Declaration in FORM BFile: DECLARATION FORM B-GS F.pdf27 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GULAB SRUSHTI CA CERTI.pdf27 Oct 2021
Proforma of Allotment letterFile: ALLOTMENT LETTER-GS F.pdf27 Oct 2021
Proforma of Allotment letterFile: AGREEMENT FOR SALE-Gujrat colony-Buttepatil.pdf27 Oct 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
GULAB SADANP52100029801SHIVAJINAGAR, Pune19Jul 2021CompletedJun 2023Feb 1980

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GULAB SRUSHTI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KOTHRUD13,700+ in Pune

2 kmGULAB SRUSHTICompleted 101Lapsed / revoked 50Other 164Dot size: filed unitsN

Filed coordinates, straight-line distance. 315 registered projects within 2 km.

Builder: BUTTEPATIL PROPERTIES

BUTTEPATIL PROPERTIES has 10 registrations on MahaRERA, including GULAB VISHWA and GULAB BHAKTI NIWAS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GULAB SRUSHTI is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GULAB SRUSHTI?

The registered promoter entity is BUTTEPATIL PROPERTIES, a partnership as per the filing. Its GSTIN 27AALFB1805H1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GULAB SRUSHTI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GULAB SRUSHTI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GULAB SRUSHTI?

The professionals named in the filing: Architect: MANGESH GOTAL; Engineer: KALPESH MANANI; Chartered Accountant: AMBAR NAIK. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GULAB SRUSHTI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GULAB SRUSHTI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GULAB SRUSHTI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.