Home / Browse projects / Pune, Maharashtra / GREENVILLE BUILDING A3
GREENVILLE BUILDING A3
RG-MH-47247 · RERA P52100052806 · Last updated on MahaRERA portal: 19 Nov 2025
Source: official MahaRERA filing
Red flags
- Litigation declared, 1 case
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GREENVILLE BUILDING A3 is a Others project by Vision Realtors in Pune, Maharashtra, registered with MahaRERA as P52100052806 on 5 Oct 2023. The registration is recorded completed; possession was promised by 30 Jun 2025. 64 of the 95 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameGREENVILLE BUILDING A3
- TypeOthers
- Location
- SOLAPUR ROAD
- HADAPSAR
- Haveli
- Pune
- 411028
- Pincode411028
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100052806
- ReraGenie IDRG-MH-47247
Builder
- NameVision Realtors
- Entity typePartnership
- GSTIN27AAKFV7057L1ZF
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersDevendra Bankatlal Rathi, Devendra Satish Bhattad, Neeraj Mansukhlal Karnavat
- Other registrations4 more →
- Completed5 of 5
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on5 Oct 2023
- Promised completion30 Jun 2025
- Revised completionNone
- Buildings1 building record
- Documents filed77 files
Current status
Figures as on 19 Nov 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GREENVILLE BUILDING A3 | NA | 15 | 13 | 91 | 4 | 95 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
GREENVILLE BUILDING A3: 68% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 80% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 19 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 60% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 50% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 80% |
| Solid Waste Management And Disposal | Yes | 70% |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | Yes | 50% |
| Fire protection and fire safety requirements | Yes | 30% |
| Electrical meter room, sub-station, receiving station | Yes | 20% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed102
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Mr Baban Kamthe & Others | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Prakash Kanhekar |
| Engineer | Sunil Mutalik & Associates |
| Chartered Accountant | Pushpak B Mundada & Associates |
| Chartered Accountant | Sunil Nimbalkar & Associates |
| Partner | Role in project |
|---|---|
| Vision Realtors | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 1595/2014 | Pune District Court | Order Passed |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jun 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jun 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed77
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Green Villae Audit Report 2024-25.pdf | 19 Nov 2025 |
| Layout approvalFile: 1-15_compressed.pdf | 27 Jun 2025 |
| Building plan approvalFile: 1-15_compressed.pdf | 27 Jun 2025 |
| Building plan approvalFile: 2-15_compressed.pdf | 27 Jun 2025 |
| Building plan approvalFile: 3-15_compressed.pdf | 27 Jun 2025 |
| Building plan approvalFile: 4-15_compressed.pdf | 27 Jun 2025 |
| Building plan approvalFile: 5-15_compressed.pdf | 27 Jun 2025 |
| Building plan approvalFile: 6-15_compressed.pdf | 27 Jun 2025 |
| Building plan approvalFile: 7-15_compressed.pdf | 27 Jun 2025 |
| Building plan approvalFile: 8-15_compressed.pdf | 27 Jun 2025 |
| Building plan approvalFile: 9-15_compressed.pdf | 27 Jun 2025 |
| Building plan approvalFile: 10-15_compressed.pdf | 27 Jun 2025 |
| Building plan approvalFile: 11-15_compressed.pdf | 27 Jun 2025 |
| Building plan approvalFile: 12-15_compressed.pdf | 27 Jun 2025 |
| Building plan approvalFile: 13-15_compressed.pdf | 27 Jun 2025 |
| Building plan approvalFile: 14-15_compressed.pdf | 27 Jun 2025 |
| Building plan approvalFile: 15-15_compressed.pdf | 27 Jun 2025 |
| Occupational CertificateFile: Completion CERTIFICATE FULL -A3.pdf | 27 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vision Realtors Arch Certificate 31 March 2025.pdf | 13 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Vision Realtors March 2025.pdf | 13 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Realtors Engg Certificate March 2025.pdf | 13 May 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventry Greenville March 2025.pdf | 13 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Green Ville CA Certificate Dec 2024.pdf | 31 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Vision Reltors Engg Certificate Dec 2024.pdf | 31 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Green Ville Disclosure of Sold Unsold Inventry Dec 2024.pdf | 31 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate A3 Q2.pdf | 23 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Greenville A3 Building.pdf | 23 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Greenville September 30.pdf | 23 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventry Greenville A3 Building.pdf | 23 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Vision Certificate A3.pdf | 18 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate (Form 3) Greenville- A3 Building.pdf | 16 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate A3.pdf | 15 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg A3.pdf | 15 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold A3.pdf | 15 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A3 Architect certificate.pdf | 7 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Greenville.pdf | 7 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sold inventory A3 Bldg.pdf | 7 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 7 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate A3.pdf | 23 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate A3.pdf | 23 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD INVENTORY A3 Dec 2023.pdf | 23 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate A3 Dec 2023.pdf | 23 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Greenville A3_compressed.pdf | 23 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Resi Com.pdf | 8 Aug 2023 |
| Declaration about Commencement CertificateFile: Declaration about commencement.pdf | 8 Aug 2023 |
| Layout approvalFile: Layout 1_compressed.pdf | 3 Aug 2023 |
| Building plan approvalFile: Layout 2.pdf | 3 Aug 2023 |
| Building plan approvalFile: TF Plan 1.pdf | 3 Aug 2023 |
| Building plan approvalFile: TF Plan 2.pdf | 3 Aug 2023 |
| Layout approvalFile: Declaration of Plot Area.pdf | 3 Aug 2023 |
| PAN CardFile: PAN Card.pdf | 3 Aug 2023 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 3 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Financial Encumbrance.pdf | 3 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf | 3 Aug 2023 |
| Details of encumbrances concerned to LegalFile: Financial Encumbrance.pdf | 3 Aug 2023 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf | 3 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: Layout 1_compressed.pdf | 3 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: Declaration of Plot Area.pdf | 3 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout 2.pdf | 3 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: TF Plan 1.pdf | 3 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: TF Plan 2.pdf | 3 Aug 2023 |
| Declaration in FORM BFile: Promoter Form B.pdf | 3 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate.pdf | 3 Aug 2023 |
| CERSAI detailsFile: CERSAI.pdf | 3 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure - D Bhattad.pdf | 3 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure - D Rathi.pdf | 3 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure - Neeraj Karnavat.pdf | 3 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure - Nitin Malpani.pdf | 3 Aug 2023 |
| Proforma of Agreement for saleFile: Agreement of Sale.pdf | 3 Aug 2023 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 3 Aug 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank A_C.pdf | 3 Aug 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation-Allotment Letter.pdf | 3 Aug 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation- Agreement of Sale.pdf | 3 Aug 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 77 filed documents as one ZIP, foldered, with a manifest
Keep GREENVILLE BUILDING A3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near HADAPSAR13,700+ in Pune
Filed coordinates, straight-line distance. 117 registered projects within 2 km.
Amanora Arbano Towers 73,74,75 and 76
City Corporation Limited
Astrana
Dilip Baburao Tupe
Leisure Town Phase 1
Sai Proviso Homes
ARV Newtown Phase III
Vedant Infracon
Kumar Parc Residences - A2
Kumar Properties Infratech Developers Pvt
Kumar Parc residences - A1
Kumar Properties Infratech Developers Pvt
Builder: Vision Realtors
Vision Realtors has 5 registrations on MahaRERA, including GREENVILLE BUILDING A1 and GREENVILLE BUILDING A2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if GREENVILLE BUILDING A3 is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GREENVILLE BUILDING A3?
The registered promoter entity is Vision Realtors, a partnership as per the filing. Its GSTIN 27AAKFV7057L1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GREENVILLE BUILDING A3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GREENVILLE BUILDING A3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GREENVILLE BUILDING A3?
The professionals named in the filing: Architect: Prakash Kanhekar; Engineer: Sunil Mutalik & Associates; Chartered Accountant: Pushpak B Mundada & Associates; Chartered Accountant: Sunil Nimbalkar & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GREENVILLE BUILDING A3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback