Home / Browse projects / Thane, Maharashtra / GREEN SQUARE
GREEN SQUARE
RG-MH-68200 · RERA P51700046932 · Last updated on MahaRERA portal: 14 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 3 cases
Clear
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GREEN SQUARE is a Residential / Group Housing project by SQUAREFEET ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700046932 on 20 Sep 2022. Possession is promised by 31 Dec 2027. 209 of the 217 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameGREEN SQUARE
- TypeResidential / Group Housing
- Location
- 40 M WIDE ROAD
- KAVESAR GHODBUNDER ROAD BEHIND D MART
- Thane (M Corp.)
- Thane
- 400607
- Pincode400607
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700046932
- ReraGenie IDRG-MH-68200
Builder
- NameSQUAREFEET ENTERPRISES
- Entity typePartnership
- PartnerSACHIN CHANDRU MIRANI
- Other registrations2 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Sep 2022
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed93 files
Current status
Figures as on 14 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GREEN SQUARE BLDG 2 A | NA | 23 | 22 | 217 | 0 | 217 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.
GREEN SQUARE BLDG 2 A: 77% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities15
As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 70% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Land and ownership10
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| BAKIR ABDUL QADIR WAREKAR | Thane (M Corp.) | Thane |
| MANDAKINI NANAVATI | Thane (M Corp.) | Thane |
| SHAHNAWAZ ABDUL KADIR VAREKAR | Thane (M Corp.) | Thane |
| SARFARAZ ABDUL KADIR VAREKAR | Thane (M Corp.) | Thane |
| SHAKIL ABDUL KADIR VAREKAR | Thane (M Corp.) | Thane |
| RAUF ABDUL KADIR VAREKAR | Thane (M Corp.) | Thane |
| SHAHNAWAZ ANWAR PATEL | Thane (M Corp.) | Thane |
| JUNAID HASAN VAREKAR | Thane (M Corp.) | Thane |
| BHARAT CHANDULAL NANAWATI | Thane (M Corp.) | Thane |
| AM WEB NET PRIVATE LIMITED | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| GREEN SQUARE BLDG 2 A | NA | Rs 26.20 cr | Rs 24.37 cr |
| - | NA | Rs 6.55 cr | Rs 1.11 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ten Folds Architects And Consultants ANIL jagwani |
| Engineer | TECHLINE CONSULTING ENGINEERS ENGINEERS |
| Chartered Accountant | NEHA AMIT AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| SQUAREFEET ENTERPRISES | - |
Litigation declared3
| Case | Court | Status |
|---|---|---|
| 693/2012 | THANE DISTRICT COURT | PENDING |
| 487/2013 | THANE DISTRICT COURT | PENDING |
| 693/2012/2012 | THANE DISTRICT COURT | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Apr 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed93
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE 30-06-2025.pdf | 14 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE 30-06-2025.pdf | 14 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE 30-06-2025.pdf | 14 Jul 2026 |
| Withdrawal Update Form 1File: JUNE TWENTY FOUR TWOA.pdf | 11 May 2026 |
| Withdrawal Update Form 1File: JUNE TWENTY FOUR TWOA.pdf | 11 May 2026 |
| Withdrawal Update Form 2File: JUNE TWENTY FOUR ENGINEERS TWO A.pdf | 11 May 2026 |
| Withdrawal Update Form 2File: JUNE TWENTY FOUR ENGINEERS TWO A.pdf | 11 May 2026 |
| Withdrawal Update Form 3File: JUNE 2024 TWOA CA.pdf | 11 May 2026 |
| Withdrawal Update Form 3File: JUNE 2024 TWOA CA.pdf | 11 May 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TWO A DEC TWENTY FOUR ARCHITECT.pdf | 31 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TWO A DEC TWENTY FOUR ARCHITECT.pdf | 31 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A QUALITY ASSURANCE CERTIFICATE.pdf | 31 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: TWO A ANNUAL REPORT ON SOA SEPT TWENTY FOUR.pdf | 13 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA TWO A SEPT TWENTY FOUR.pdf | 25 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEPT TWENTY FOUR TWO A ENJINEER CERTIFICATE.pdf | 25 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEPT TWENTY FOUR TWO A ENJINEER CERTIFICATE.pdf | 25 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT LETTER WING A SEPT TWENTY FOUR compressed.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUNE TWENTY FOUR ENGINEERS TWO A.pdf | 2 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JUNE 2024 TWOA CA.pdf | 18 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JUNE TWENTY FOUR TWOA.pdf | 11 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2A (1)FORM 2A ENGINEERS CERTIFICATE.pdf | 2 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A (2) FORM 2A ENGINEERS CERTIFICATE.pdf | 2 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A (3) FORM 2A ENGINEERS CERTIFICATE.pdf | 2 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A (4) FORM 2A ENGINEERS CERTIFICATE.pdf | 2 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A (5) FORM 2A ENGINEERS CERTIFICATE.pdf | 2 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A (6) FORM 2A ENGINEERS CERTIFICATE.pdf | 2 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A (7)FORM 2A ENGINEERS CERTIFICATE.pdf | 2 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A (8)FORM 2A ENGINEERS CERTIFICATE.pdf | 2 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A (9)FORM 2A ENGINEERS CERTIFICATE.pdf | 2 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MARCH TWENTY THREE A CA CERTIFICATE.pdf | 25 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TWO A ARCHITECT.pdf | 20 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: THREE TWENTY THREE TWO A ARCHITECTS.pdf | 20 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: NINE TWENTY TWO A ARCHITECT.pdf | 20 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JUNE TWENTY THREEE GS 2A ARCHITECT.pdf | 20 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SEPT TWENTY THREE GS A ARCHITECT.pdf | 20 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GS A ARCHITECT CERTIFICATE.pdf | 20 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MARCH TWENTY FOUR GS A ARCHITECT.pdf | 20 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEPT TWENTY TWO ENJINEERS.pdf | 20 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC TWENTY TWO ENJINEERS.pdf | 20 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUNE TWENTY THREE ENJINEERS.pdf | 20 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEPT TWENTY THREE ENJINEERS.pdf | 20 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC TWENTY THREE ENJINEERS.pdf | 20 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MARCH TWENTY FOUR ENJINEERS.pdf | 20 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEPT A TWENTY TWO CA.pdf | 20 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEC A TWENTY TWO CA.pdf | 20 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JUNE A TWENTY THREE CA.pdf | 20 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEPT A TWENTY THREE CA.pdf | 20 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEC A TWENTY THREE CA.pdf | 20 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MARCH A TWENTY FOUR CA.pdf | 20 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31-03-2023 ENGINEER CERTIFICATE.pdf | 11 May 2023 |
| Proforma of Agreement for saleFile: RERA AGREEMENT 2023.pdf | 6 May 2023 |
| Building plan approvalFile: PL 2 CARPET AREA.pdf | 21 Apr 2023 |
| Building plan approvalFile: 3 - 6 , 19 TOWER 1.pdf | 21 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: PL 2 CARPET AREA.pdf | 21 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 - 6 , 19 TOWER 1.pdf | 21 Apr 2023 |
| Building plan approvalFile: 11 TO 14 TOWER 2B.pdf | 20 Apr 2023 |
| Building plan approvalFile: 15 TO 18 TOWER 3.pdf | 20 Apr 2023 |
| Building plan approvalFile: 7 TO 10 TOWER 2A.pdf | 20 Apr 2023 |
| Layout approvalFile: PL 1 LAYOUT PLAN GS_compressed.pdf | 20 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: PL 1 LAYOUT PLAN GS_compressed.pdf | 20 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 7 TO 10 TOWER 2A.pdf | 20 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 11 TO 14 TOWER 2B.pdf | 20 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 15 TO 18 TOWER 3.pdf | 20 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC COPY 4365-23-11-04-23 GREEN SQUARE_compressed (1).pdf | 13 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Green Square Compressed.pdf | 15 Sep 2022 |
| Other - LegalFile: Search Report 166 168 169.pdf | 8 Sep 2022 |
| Other - LegalFile: Search Report 170.pdf | 8 Sep 2022 |
| Copy of the legal title reportFile: TITLE REPORT GREEN SQUARE-1.pdf | 25 Aug 2022 |
| Copy of the legal title reportFile: TITLE REPORT GREEN SQUARE-2.pdf | 25 Aug 2022 |
| Details of encumbrances concerned to FinanceFile: No encumbrance Finance.pdf | 19 Aug 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrance Green Square.pdf | 19 Aug 2022 |
| Declaration about Commencement CertificateFile: Declaration Abt CC.pdf | 19 Aug 2022 |
| Declaration in FORM BFile: Form B.pdf | 19 Aug 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200245028164_For_Asset_Based_Search_19_08_2022_12_31_55_974.pdf | 19 Aug 2022 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 19 Aug 2022 |
| Proforma of Allotment letterFile: Final RERA Agreement.pdf | 19 Aug 2022 |
| Proforma of Allotment letterFile: Application Form for RERA.pdf | 19 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT GREEN SQUARE_compressed.pdf | 19 Aug 2022 |
| Layout approvalFile: scan 005_compressed.pdf | 18 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: scan 005_compressed.pdf | 18 Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 93 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GREEN SQUARE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KAVESAR GHODBUNDER ROAD BEHIND D MART7,600+ in Thane
Filed coordinates, straight-line distance. 394 registered projects within 2 km.
Hiranandani Westgate Phase 1
SHODEN DEVELOPERS PRIVATE LIMITED
Forestville - Phase 1
Oberoi Realty Limited
DOSTI WEST COUNTY - PHASE 4- DOSTI PINE
DOSTI ENTERPRISES
Y SQUARE
SHREE MALLINATH ENTERPRISE LLP
Primera
Agile Real Estate Dev Private Limited
UNIQUE VISTAS MHADA BUILDINGNO. 4 5 6 7
MADHU HARSHAD DOSHI
See every Thane project, with the district possession charts
Builder: SQUAREFEET ENTERPRISES
SQUAREFEET ENTERPRISES has 3 registrations on MahaRERA, including GREEN SQUARE and GREEN SQUARE BLDG. NO 2B. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if GREEN SQUARE is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GREEN SQUARE?
The registered promoter entity is SQUAREFEET ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GREEN SQUARE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GREEN SQUARE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GREEN SQUARE?
The professionals named in the filing: Architect: Ten Folds Architects And Consultants ANIL jagwani; Engineer: TECHLINE CONSULTING ENGINEERS ENGINEERS; Chartered Accountant: NEHA AMIT AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GREEN SQUARE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback