ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Green Park Residency

Registered No litigation declared Others project

Green Park Residency

By Green Park Residency

RG-MH-50744 · RERA P51700018080 · Last updated on MahaRERA portal: 18 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 48 months from the original
3 of 11Construction stages donefurthest along: Stilt Floor, 50%
150 of 181Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

Green Park Residency is a Others project by Green Park Residency in Thane, Maharashtra, registered with MahaRERA as P51700018080 on 10 Oct 2018. Possession is promised by 31 Dec 2028. The completion date has moved by 48 months from the original filing. 31 of the 181 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameGreen Park Residency
  • TypeOthers
  • Location
    • Bhiwandi Wada Road
    • Bhiwandi
    • Kawad Kh.
    • Thane
    • 421302
  • Pincode421302
  • RERA no.P51700018080
  • ReraGenie IDRG-MH-50744

Builder

  • NameGreen Park Residency
  • Entity typePartnership
  • PartnerSalim Waris Ali Manihar

Key dates

this monthRegisteredOct 2018First promiseDec 2024Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Oct 2018
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Dec 2024)
  • Buildings1 building record
  • Documents filed74 files

Current status

17%31 of 181 units booked

Figures as on 18 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Green ParkNA525215724181

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 50%.

Green Park: 36% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed48

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots48
Open Space48

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,800 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Sep 2024

Approvals and building plan

Sanctioning authorityMUMBAI METROPOLITAN REGION DEVELOPMENT
Permissible FSI6873.51
Proposed, not sanctioned6,874 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAshar Enclave Kolshet Road Thane 400607

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM. NAKHUDA CONSULTING ENGINEER AND ASSOCIATES
EngineerASSOCIATED STUCTURAL ENGINEERS
Chartered AccountantMANISH K RAMAWATI AND COMPANY
Chartered AccountantANJS & ASSCIATES
Chartered AccountantM.S K Hemant & CO
PartnerRole in project
Green Park Residency-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700017495Dec 2024 → Dec 2028

Reason as filed by the promoterDue to Financial issue we would not able to complete the project within the stipulated prescribe time as mentioned in application .

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Oct 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Fome 1 March 2026.pdf18 Jun 2026
Form 2File: Fome 2 june 2026.pdf18 Jun 2026
Form 3File: Form 3 Green Park 31-03-2026 sign.pdf18 Jun 2026
Disclosure of Sold and Booked InventoryFile: disclosure of sold unsold_compressed.pdf18 Jun 2026
Form 1File: Form 1 30-09-25.pdf13 Feb 2026
Form 2File: Form 2 30-09-25.pdf13 Feb 2026
Form 3File: Form 3 Green Park 30-09-2025 signed.pdf13 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold.pdf13 Feb 2026
Form 1File: Form 1 31-12-25.pdf13 Feb 2026
Form 2File: Form 2 31-12-25.pdf13 Feb 2026
Form 3File: Form 3 Green Park 31-12-2025 signed.pdf13 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold.pdf13 Feb 2026
Form 5 (FY 2022-2023)File: FORM 5 22-23.pdf13 Oct 2025
Form 5 (FY 2023-2024)File: FORM 5 23-24.pdf13 Oct 2025
Form 1File: Form 1 March 2025.pdf26 Sep 2025
Form 2File: Form 2 March 2025.pdf26 Sep 2025
Form 3File: Form - 3 30-03-2025 - converted.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of 30-06-2025.pdf26 Sep 2025
Form 1File: Form 1 Sept 2025.pdf26 Sep 2025
Form 2File: Form 2 sept 2025.pdf26 Sep 2025
Form 3File: Form 3 30-06-2025 - converted.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of 30_06_2025.pdf26 Sep 2025
PAN CardFile: pancard.pdf23 Oct 2024
Certificates of CA (Form 3)File: Form 3.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold_ booked inventory.pdf23 Oct 2024
Declaration about Commencement CertificateFile: declaration about comm cert.pdf23 Oct 2024
Details of encumbrancesFile: No encumbrances Certificate FINANCE.pdf22 Oct 2024
Details of encumbrances concerned to FinanceFile: No encumbrances Certificate FINANCE.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - converted.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 18-19.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21.pdf22 Oct 2024
CERSAI detailsFile: Cersai_Declaration.pdf22 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf22 Oct 2024
Deviation Report with respect to Allotment letterFile: deviation-allotment.pdf22 Oct 2024
Details of encumbrances concerned to LegalFile: No encumbrances Certificate FINANCE.pdf22 Oct 2024
Deviation Report with respect to model copy of AgreementFile: deviation-draft sale.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21-22.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf22 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23-24.pdf22 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured_unsecured finance availed for the project.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure.pdf31 Mar 2024
Certificates of CA (Form 3)File: Form 3 Final_compressed.pdf31 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf28 Mar 2024
Declaration in FORM BFile: Form B.pdf9 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Eng Certificate_compressed.pdf7 Sep 2023
Disclosure of sold/ booked inventoryFile: Disclosure.pdf7 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf7 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf1 Sep 2023
Proforma of Agreement for saleFile: Draft Agreement.pdf1 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2020-21.pdf9 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2021-22.pdf9 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2022-23.pdf9 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5.pdf4 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf4 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: From 5 20-21.pdf4 Jun 2023
Layout approvalFile: Scan_0313-04_merged_compressed (1)_11zon.pdf31 May 2023
Copy of Layout Approval (in case of layout)File: Scan_0313-04_merged_compressed (1)_11zon.pdf31 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Adobe Scan Feb 23, 2023.pdf31 May 2023
Declaration about Commencement CertificateFile: Adobe Scan Feb 23, 2023.pdf31 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf12 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf12 Mar 2023
Layout approvalFile: Layout Report.pdf4 Oct 2018
Building plan approvalFile: Layout Report.pdf4 Oct 2018
Copy of the legal title reportFile: Title Report compressed.pdf4 Oct 2018
Details of encumbrancesFile: encumberence.pdf4 Oct 2018
Copy of Layout Approval (in case of layout)File: Layout Report.pdf4 Oct 2018
Building Plan Approval (IOD)File: Layout Report.pdf4 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: CC PDF Compressed.pdf4 Oct 2018
Declaration in FORM BFile: Declaration Form B.pdf4 Oct 2018
Certificates of CA (Form 3)File: Certificate form 3.pdf4 Oct 2018
Proforma of Allotment letterFile: Agreement for sell.pdf4 Oct 2018

How this compares with Thane

17%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 48 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Green Park Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhiwandi7,600+ in Thane

Builder: Green Park Residency

Green Park Residency has 1 registration on MahaRERA, including Green Park Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Green Park Residency is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Green Park Residency?

The registered promoter entity is Green Park Residency, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Green Park Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Green Park Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Green Park Residency?

The professionals named in the filing: Architect: M. NAKHUDA CONSULTING ENGINEER AND ASSOCIATES; Engineer: ASSOCIATED STUCTURAL ENGINEERS; Chartered Accountant: MANISH K RAMAWATI AND COMPANY; Chartered Accountant: ANJS & ASSCIATES; Chartered Accountant: M.S K Hemant & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Green Park Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Green Park Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Green Park Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.