ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Green Olive

Completed No litigation declared Residential / Group Housing project

Green Olive

By Green Olive Venture

RG-MH-25936 · RERA P52100013526 · Last updated on MahaRERA portal: 29 Sep 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
29 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

Green Olive is a Residential / Group Housing project by Green Olive Venture in Pune, Maharashtra, registered with MahaRERA as P52100013526 on 9 Oct 2017. The registration is recorded completed; possession was promised by 30 Dec 2022.

At a glance

Project

  • NameGreen Olive
  • TypeResidential / Group Housing
  • Location
    • Phase 1
    • Hinjewadi
    • Hinjewadi
    • Hinjavadi (CT)
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100013526
  • ReraGenie IDRG-MH-25936

Builder

  • NameGreen Olive Venture
  • Entity typeOthers
  • Named personsKolte-Patil Developers Limited, Arista Developers Private Limited
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2017PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Oct 2017
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings3 building records
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CNA120000
D Floor 1 to 6NA90000
D Floors 7 to 10NA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 29 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

29 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D Floor 1 to 691%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D Floors 7 to 1082%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Parking filed122

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots122
Closed/Covered81
Open Space41
BuildingClosed/CoveredOpen SpaceTotal
C291443
D Floor 1 to 6522779

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,682 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9507.23
Proposed, not sanctioned9,507 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMitra mandal chowk, parvati, swargate pune

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVikas Achalkar
EngineerJW Consultant LLP
PartnerRole in project
Green Olive Venture-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Sep 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Feb 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Feb 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Feb 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 14 Oct 2022

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Green Olive Ventures - Form 5.pdf29 Sep 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf5 Apr 2023
Disclosure of sold/ booked inventoryFile: Green Olive.pdf20 Oct 2022
Certificates of CA (Form 3)File: GOV Form 3 30-09-2022_ Signed.pdf20 Oct 2022
CERSAI detailsFile: CERSAI_Search_Report_200249955865_For_Debtor_Based_Search_17_10_2022_17_13_24_967.pdf18 Oct 2022
Proforma of Allotment letterFile: AFS.pdf14 Oct 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf14 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GOV Q2 arch cert.pdf6 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GOV.pdf30 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 GOV June 2022.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: Inventory Declaration Green Olive.pdf7 Jul 2022
Certificates of CA (Form 3)File: CA - GOV.pdf7 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Green Olive Venture.pdf4 Jul 2022
CERSAI detailsFile: CERSAI_Search_Report_200241269328_For_Debtor_Based_Search_02_07_2022_12_44_04_057.pdf4 Jul 2022
Proforma of Allotment letterFile: AFS 26052022.pdf27 May 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Letter Legal Entity Formation with Deeds.pdf27 May 2022
Disclosure of sold/ booked inventoryFile: Inventory Declaration Green Olive.pdf12 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_200234293696_For_Debtor_Based_Search_04_04_2022_16_56_48_570.pdf6 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Green Olive.pdf20 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA GREEN OLIVE PG 320220107_14521634.pdf18 Jan 2022
Disclosure of sold/ booked inventoryFile: signed inventory declaration dec 21 Green Olive.pdf13 Jan 2022
CERSAI detailsFile: Green Olive.pdf7 Jan 2022
Certificates of CA (Form 3)File: Green Olive Ventures.pdf7 Jan 2022
CERSAI detailsFile: Green Olive.pdf6 Jan 2022
Proforma of Allotment letterFile: Final-GREEN OLIVE-AFS- 28-12-2021-compressed.pdf4 Jan 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 20211224 अंशत भोगवटा प्रमाणपत्र सी इमारत हिंजवडी.pdf4 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: GOV Signed form 5.pdf30 Sep 2021
Proforma of Allotment letterFile: Final-GREEN OLIVE-AFS- 29-06-2021.pdf30 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Signed Form 5 Green Olive.pdf30 Sep 2020
Certificates of CA (Form 5)File: SIGNED FORM 5-GREEN OLIVE.pdf29 Sep 2019
Proforma of Allotment letterFile: Revised Allotment Letter and Application Letter Green Olive.pdf11 Oct 2018
Certificates of CA (Form 5)File: Signed Form 5 - Green Olive.pdf30 Sep 2018
Proforma of Allotment letterFile: Proforma Agreement_Greeb Olive _Aug 2018.pdf21 Aug 2018
Proforma of Allotment letterFile: Proforma Agreement_Green Olive_July 2018.pdf19 Jul 2018
Proforma of Allotment letterFile: Proforma Agreement_Green Olive_March 2018.pdf23 Mar 2018
Proforma of Allotment letterFile: Proforma Agreement_Green Olive_2018.pdf9 Feb 2018
Layout approvalFile: Sanctioned Layout_Green Olive.pdf1 Feb 2018
Building plan approvalFile: Building Plan approval _Green Olive.pdf1 Feb 2018
Copy of Layout Approval (in case of layout)File: Sanctioned Layout_Green Olive.pdf1 Feb 2018
Building Plan Approval (IOD)File: Building Plan approval _Green Olive.pdf1 Feb 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_Green Olive.pdf1 Feb 2018
Proforma of Allotment letterFile: Draft Agreement GREEN OLIVE 09012018.pdf10 Jan 2018
Proforma of Allotment letterFile: Draft Agreement for sale_Green Olive.pdf30 Dec 2017
Declaration in FORM BFile: Affidavit cum declaration_green olive.pdf28 Sep 2017
Details of encumbrancesFile: Encumbrances.pdf22 Sep 2017
Building plan approvalFile: Building Approval Plan_Green Olive.pdf21 Sep 2017
Layout approvalFile: Layout_Green Olive.pdf21 Sep 2017
PAN CardFile: Green Olive_PAN.pdf21 Sep 2017
Copy of the legal title reportFile: Search and Title Report.pdf21 Sep 2017
Copy of Layout Approval (in case of layout)File: Layout_Green Olive.pdf21 Sep 2017
Building Plan Approval (IOD)File: Building Approval Plan_Green Olive.pdf21 Sep 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf21 Sep 2017
Certificates of CA (Form 3)File: CA Certificate_Form 3.pdf21 Sep 2017
Proforma of Allotment letterFile: Proforma Allotment letter and Agreement.pdf21 Sep 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Green OliveS. No. 138 1 Village Hinjewadi Tal. Mulshi Dist. Pune176CompletedJun 2014Late, Oct 2014

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Green Olive on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hinjewadi13,700+ in Pune

2 kmGreen OliveCompleted 49Lapsed / revoked 25Other 57Dot size: filed unitsN

Filed coordinates, straight-line distance. 131 registered projects within 2 km.

Builder: Green Olive Venture

Green Olive Venture has 1 registration on MahaRERA, including Green Olive. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Green Olive is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Green Olive?

The registered promoter entity is Green Olive Venture, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Green Olive?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Green Olive?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Green Olive?

The professionals named in the filing: Architect: Vikas Achalkar; Engineer: JW Consultant LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Green Olive?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Green Olive. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Green Olive to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.