Home / Browse projects / Pune, Maharashtra / Green Life

Registration lapsed No litigation declared Residential / Group Housing project

Green Life

By Wakadkar Vinode Associates

RG-MH-12924 · RERA P52100022404 · Last updated on MahaRERA portal: 8 Mar 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 3 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2026Possession promised3 months past this date
19 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 98%
120 of 330Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Green Life is a Residential / Group Housing project by Wakadkar Vinode Associates in Pune, Maharashtra, registered with MahaRERA as P52100022404 on 20 Sep 2019. Possession was promised by 1 Jul 2026 and is now 3 months past that date. 210 of the 330 units on this registration are recorded sold or booked, and 19 of 33 construction stages are filed complete.

At a glance

Project

  • NameGreen Life
  • TypeResidential / Group Housing
  • Location
    • Hinjewadi Marunji Road
    • Hinjewadi
    • Hinjavadi (CT)
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100022404
  • ReraGenie IDRG-MH-12924

Builder

  • NameWakadkar Vinode Associates
  • Entity typePartnership
  • PartnersVishal Yashwant Wakadkar, Amol Bapu Wakadkar, Gangadhar Sadashiv Vinode, Pradeep Maruti Sathe, Yogesh Raghunath Shitole

Key dates

3 months past promisethis monthRegisteredSep 2019PromisedJul 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on20 Sep 2019
  • Promised completion1 Jul 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed71 files

Current status

64%210 of 330 units booked

Figures as on 8 Mar 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA18141100110
BNA18141100110
CNA18141100110

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 8 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 98%.

A99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
B96%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
C59%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor56%
Slabs of Super Structure55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 8 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes65%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes85%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes95%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes85%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Parking filed160

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots160
Closed/Covered160
BuildingClosed/CoveredTotal
A9292
B6868

Land and ownership8

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area19,055 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Feb 2026
LandownerVillageDistrict
Chetan Shivaji SakhareHinjavadi (CT)Pune
Shubham Dnyaneshwar SakhareHinjavadi (CT)Pune
Ganesh Dnyaneshwar SakhareHinjavadi (CT)Pune
Kaluram Maruti SakhareHinjavadi (CT)Pune
Laxman Maruti SakhareHinjavadi (CT)Pune
Pandurang Maruti SakhareHinjavadi (CT)Pune
Shrirang Maruti SakhareHinjavadi (CT)Pune
Kaluram SakhareHinjavadi (CT)Pune

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGION DEVELOPMENT AUTHORITY
Permissible FSI18240.06
Proposed, not sanctioned18,240 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHinjewadi IT Park Main Road, Phase 1, MIDC, Hinjawadi, Pune, Maharashtra - 411057

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA Design Studio
EngineerNITIN JAIN
Chartered AccountantCA Kunal Jhamvar
Chartered AccountantPGMJ & ASSOCIATES
Chartered AccountantNITISH VAIDYA & ASSOCIATES
PartnerRole in project
Wakadkar Vinode Associates-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Aug 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Mar 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Mar 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Mar 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Final 21-22.pdf8 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Final Form 5.pdf8 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.PDF21 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA Certified_compressed.pdf21 Mar 2023
Details of encumbrancesFile: Encumbrance letter.PDF14 Oct 2022
Details of encumbrancesFile: Encumbrance letter0001.PDF14 Oct 2022
Details of encumbrancesFile: Encumbrance letter0002.PDF14 Oct 2022
CERSAI detailsFile: ASSET BASED CERSAI.pdf12 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_200225834344_For_Debtor_Based_Search_14_12_2021_11_22_49_481.pdf14 Dec 2021
OtherFile: WAKADKAR_compressed.pdf14 Dec 2021
Declaration about Commencement CertificateFile: Declaration for commencement cer.PDF3 Dec 2021
OtherFile: B0001_compressed.pdf25 Nov 2021
OtherFile: concent_compressed.pdf29 Oct 2021
OtherFile: Declaration for commencement cer.PDF29 Oct 2021
OtherFile: Application For Correction.PDF29 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 3 20-21.pdf14 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Wakadkar Vinode Asso (1).pdf14 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 19-20.pdf14 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 20.pdf14 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 21.pdf14 Oct 2021
Declaration about Commencement CertificateFile: commicement.pdf8 Oct 2021
Disclosure of sold/ booked inventoryFile: A wing Disclosure of Sold booked Inventory.pdf8 Oct 2021
Disclosure of sold/ booked inventoryFile: B wing Mhada Disclosure of Sold booked Inventory.pdf8 Oct 2021
Disclosure of sold/ booked inventoryFile: B wing mhada page 2 Disclosure of Sold booked Inventory.pdf8 Oct 2021
Layout approvalFile: 1.pdf16 Mar 2020
Layout approvalFile: 2.pdf16 Mar 2020
Building plan approvalFile: 3.pdf16 Mar 2020
Building plan approvalFile: 4.pdf16 Mar 2020
Building plan approvalFile: 5.pdf16 Mar 2020
Building plan approvalFile: 8.pdf16 Mar 2020
Building plan approvalFile: 7.pdf16 Mar 2020
Building plan approvalFile: 6.pdf16 Mar 2020
Copy of Layout Approval (in case of layout)File: 1.pdf16 Mar 2020
Copy of Layout Approval (in case of layout)File: 2.pdf16 Mar 2020
Building Plan Approval (IOD)File: 3.pdf16 Mar 2020
Building Plan Approval (IOD)File: 4.pdf16 Mar 2020
Building Plan Approval (IOD)File: 5.pdf16 Mar 2020
Building Plan Approval (IOD)File: 8.pdf16 Mar 2020
Building Plan Approval (IOD)File: 7.pdf16 Mar 2020
Building Plan Approval (IOD)File: 6.pdf16 Mar 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Letter.pdf16 Mar 2020
Declaration in FORM BFile: Form B - Earnest.pdf18 Sep 2019
Declaration in FORM BFile: Form B Owners.pdf18 Sep 2019
Proforma of Allotment letterFile: Allotment Letter.pdf18 Sep 2019
OtherFile: Authority Letter - Unit Agreement.pdf16 Sep 2019
Copy of the legal title reportFile: Title Report.pdf16 Aug 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf16 Aug 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Form 3.pdf16 Aug 2019
Proforma of Allotment letterFile: Unit Agreement.pdf16 Aug 2019
OtherFile: Authority Letter - RERA Registration.pdf16 Aug 2019
Details of encumbrancesFile: Declaration for No Encumbrance - Owners.pdf3 Aug 2019
Layout approvalFile: 1_Ist Sanction Layout.pdf29 Jul 2019
Layout approvalFile: 2_Full Potential Layout.pdf29 Jul 2019
Building plan approvalFile: 3_A Bldg_Floor Plans.pdf29 Jul 2019
Building plan approvalFile: 4_A Bldg_section Elevations.pdf29 Jul 2019
Building plan approvalFile: 5_B Bldg_Floor Plans.pdf29 Jul 2019
Building plan approvalFile: 6_B Bldg_section elevations.pdf29 Jul 2019
Building plan approvalFile: 7_C Bldg_Plan Section Elevations.pdf29 Jul 2019
Building plan approvalFile: 8_Club House 1 , 2.pdf29 Jul 2019
PAN CardFile: PAN Card.pdf29 Jul 2019
Details of encumbrancesFile: Declaration for No Encumbrance - Earnest.pdf29 Jul 2019
Copy of Layout Approval (in case of layout)File: 1_Ist Sanction Layout.pdf29 Jul 2019
Copy of Layout Approval (in case of layout)File: 2_Full Potential Layout.pdf29 Jul 2019
Building Plan Approval (IOD)File: 3_A Bldg_Floor Plans.pdf29 Jul 2019
Building Plan Approval (IOD)File: 4_A Bldg_section Elevations.pdf29 Jul 2019
Building Plan Approval (IOD)File: 5_B Bldg_Floor Plans.pdf29 Jul 2019
Building Plan Approval (IOD)File: 6_B Bldg_section elevations.pdf29 Jul 2019
Building Plan Approval (IOD)File: 7_C Bldg_Plan Section Elevations.pdf29 Jul 2019
Building Plan Approval (IOD)File: 8_Club House 1 , 2.pdf29 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Letter.pdf29 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf29 Jul 2019

How this compares with Pune

64%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Green Life on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hinjewadi13,700+ in Pune

2 kmGreen LifeCompleted 12Lapsed / revoked 9Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 43 registered projects within 2 km.

Builder: Wakadkar Vinode Associates

Wakadkar Vinode Associates has 1 registration on MahaRERA, including Green Life. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Green Life shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Green Life is delayed beyond 1 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Green Life?

The registered promoter entity is Wakadkar Vinode Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Green Life?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Green Life?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Green Life?

The professionals named in the filing: Architect: A Design Studio; Engineer: NITIN JAIN; Chartered Accountant: CA Kunal Jhamvar; Chartered Accountant: PGMJ & ASSOCIATES; Chartered Accountant: NITISH VAIDYA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Green Life?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Green Life. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Green Life to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.