Home / Browse projects / Pune, Maharashtra / Green County Phase II Wing-B

Completed No litigation declared Residential / Group Housing project

Green County Phase II Wing-B

By Anand Developers

RG-MH-16381 · RERA P52100026716 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
62 of 222Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

Green County Phase II Wing-B is a Residential / Group Housing project by Anand Developers in Pune, Maharashtra, registered with MahaRERA as P52100026716 on 21 Oct 2020. The registration is recorded completed; possession was promised by 30 Jun 2025. 160 of the 222 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.

At a glance

Project

  • NameGreen County Phase II Wing-B
  • TypeResidential / Group Housing
  • Location
    • Saswad Road
    • Fursungi
    • Haveli
    • Pune
    • 412307
  • Pincode412307
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100026716
  • ReraGenie IDRG-MH-16381

Builder

  • NameAnand Developers
  • Entity typePartnership
  • PartnersDevendra Bankatlal Rathi, Nitin Suresh Malpani, Devendra Bankatlal Rathi, Niraj Vithaldas Mantri, Manoj Ramdayal Asava, Kamlesh Shriniwas Khatod, Kalpesh Rameshchandra Bhutada, Manohar Gopikisan Baheti, Rishikesh Suresh Baheti, Sanjay Vasudev Maheshwari, Chandanmal Ramlal Oswal
  • Other registrations10 more →
  • Completed6 of 11
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredOct 2020PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Oct 2020
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed101 files

Current status

72%160 of 222 units booked
96.5%Work done, per cost certificate

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Mhada on 1st Floor and Flat 2 to 13 from 2nd to 11st floorNA14111350135
Flat 1 to 16 from 12th to 14th Floor and Flat 1, 14, 15, 16 from 2nd to 11th FloorNA171487087

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

Mhada on 1st Floor and Flat 2 to 13 from 2nd to 11st floor82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Flat 1 to 16 from 12th to 14th Floor and Flat 1, 14, 15, 16 from 2nd to 11th Floor90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes95%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes95%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes85%
Open ParkingYes100%

Parking filed145

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots145
Closed/Covered145
BuildingClosed/CoveredTotal
Mhada on 1st Floor and Flat 2 to 13 from 2nd to 11st floor144144
Flat 1 to 16 from 12th to 14th Floor and Flat 1, 14, 15, 16 from 2nd to 11th Floor11

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,400 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Nov 2025
LandownerVillageDistrict
Sudha Sanjay HarpalePune (M Corp.)Pune
Sanjay Harpale, Sanjay Deshmukh & Sachin HarpalePune (M Corp.)Pune

Approvals and building plan

Permissible FSI19000.0
Proposed, not sanctioned11,898 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 3 and 4, Phuge Prima, Sr No 228, Bhosari, Pune - 411039
Estimated costRs 45.00 cr
Cost incurredRs 43.41 cr
Work done96.47%
BuildingWingEstimatedIncurred
Mhada on 1st Floor and Flat 2 to 13 from 2nd to 11st floorNARs 20.00 crRs 19.30 cr
Flat 1 to 16 from 12th to 14th Floor and Flat 1, 14, 15, 16 from 2nd to 11th FloorNARs 20.00 crRs 19.30 cr
-NARs 5.00 crRs 4.80 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA Design Studio
EngineerSandeep Rathod
Chartered AccountantPushpak B Mundada & Associates
Chartered AccountantSunil Shamrao Nimbalkar
PartnerRole in project
Anand Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Jul 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Feb 2025

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: FULL OCCUPANCY CERTIFICATE 7-02-2025.pdf30 Apr 2026
Occupational CertificateFile: ARCHITECT CERTIFICATE (FORM-4).pdf30 Apr 2026
Occupational CertificateFile: 1-5.PDF30 Apr 2026
Occupational CertificateFile: 2-5.PDF30 Apr 2026
Occupational CertificateFile: 3-5.PDF30 Apr 2026
Occupational CertificateFile: 4-5.pdf30 Apr 2026
Occupational CertificateFile: 5-5.PDF30 Apr 2026
Occupational CertificateFile: OC Verification Email Screenshot.pdf30 Apr 2026
Form 1File: Anand Developers Arch Certificate.pdf16 Mar 2026
Form 2File: Anand Developers Engg Certificate.pdf16 Mar 2026
Form 3File: CA Certificate-GCII.pdf16 Mar 2026
Disclosure of Sold and Booked InventoryFile: Discloser Of Sold Inventry Anand Developers phase 2.pdf16 Mar 2026
Form 1File: Anand Developers Arch Certificate JAN 2025.pdf16 Feb 2026
Form 2File: Anand Developers Engg Certificate JAN 2025.pdf16 Feb 2026
Form 3File: CA certificate JAN 2025.pdf16 Feb 2026
Disclosure of Sold and Booked InventoryFile: Green County Sold Unsold Inventry JAN 2025.pdf16 Feb 2026
Withdrawal Update Form 1File: Anand Developers Arch Certificate Dec 2024.pdf16 Feb 2026
Withdrawal Update Form 2File: Anand Developers Engg Certificate Dec 2024.pdf16 Feb 2026
Withdrawal Update Form 3File: Green County CA Certificate Dec 2024.pdf16 Feb 2026
Form 1File: GC Ph-ll Arch Certificate.pdf13 Feb 2026
Form 2File: GC 2 Engg Certificate.pdf13 Feb 2026
Form 3File: CA Certificate_GC Ph-ll.pdf13 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY GC II.pdf13 Feb 2026
Form 1File: Architect Certificate GCII 30 September.pdf13 Feb 2026
Form 2File: Engg Certificate GC II September 30.pdf13 Feb 2026
Form 3File: CA Certificate Green County Phase ll B Building.pdf13 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventry Green County Phase ll B.pdf13 Feb 2026
Form 1File: Anand Developers Arch Certificate Dec 2024.pdf13 Feb 2026
Form 2File: Anand Developers Engg Certificate Dec 2024.pdf13 Feb 2026
Form 3File: Green County CA Certificate Dec 2024.pdf13 Feb 2026
Disclosure of Sold and Booked InventoryFile: Green County Sold Unsold Inventry Dec 2024.pdf13 Feb 2026
Form 5 (FY 2024-2025)File: Grren County Audit Report 2024-25.pdf19 Nov 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FULL OCCUPANCY CERTIFICATE 7-02-2025.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Anand Developers Arch Certificate Dec 2024 (1).pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Green County CA Certificate Dec 2024.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anand Developers Engg Certificate Dec 2024.pdf28 Jan 2025
Disclosure of sold/ booked inventoryFile: Green County Sold Unsold Inventry Dec 2024.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate GCII 30 September.pdf8 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Green County Phase ll B Building.pdf8 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate GC II September 30.pdf8 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventry Green County Phase ll B.pdf8 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: A Developers Form 5 2023-24.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GC Ph-ll Arch Certificate.pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GC 2 Engg Certificate.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY GC II.pdf24 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_GC Ph-ll.pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Anand Developers Arch Certificate.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anand Developers Engg Certificate.pdf7 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Anand Developers ENGG Certificate form 2A.pdf7 May 2024
Disclosure of sold/ booked inventoryFile: Discloser Of Sold Inventry Anand Developers phase 2.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-GCII.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate GC II.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate GC II.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory GC II.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_GC II final-Compressed.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecture Certificate.pdf6 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GC II Engg Certificate.pdf6 Nov 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf6 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_GC Ph-2 Wing B.pdf6 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 GC II B wing 2022-23.pdf29 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate GC OK.pdf10 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate GC OK.pdf10 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory GC II.pdf10 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Green County Ph-2 Wing B OK.pdf10 Aug 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory A Developers.pdf9 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate A Developers B Wing.pdf8 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginner Certificate Anand Developers B Wing.pdf8 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Anand Developers B Wing.pdf8 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate A Developers B Wing.pdf8 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 GC II B wing 2021-22.pdf14 Apr 2023
Building plan approvalFile: Revised Plan 1.pdf11 Feb 2022
Building plan approvalFile: Revised Plan 2.pdf11 Feb 2022
Building plan approvalFile: Revised Plan 3.pdf11 Feb 2022
Building plan approvalFile: Revised Plan 4.pdf11 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 1.pdf11 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 2.pdf11 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 3.pdf11 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 4.pdf11 Feb 2022
Layout approvalFile: Revised Layout.pdf7 Feb 2022
Copy of Layout Approval (in case of layout)File: Revised Layout.pdf7 Feb 2022

How this compares with Pune

72%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Green County Phase II Wing-B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Fursungi13,700+ in Pune

2 kmGreen County Phase II WiCompleted 44Lapsed / revoked 15Other 31Dot size: filed unitsN

Filed coordinates, straight-line distance. 90 registered projects within 2 km.

Builder: Anand Developers

ANAND DEVELOPERS has 11 registrations on MahaRERA, including AADITYA HEIGHTS and GREEN COUNTY. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Green County Phase II Wing-B is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Green County Phase II Wing-B?

The registered promoter entity is Anand Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Green County Phase II Wing-B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Green County Phase II Wing-B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Green County Phase II Wing-B?

The professionals named in the filing: Architect: A Design Studio; Engineer: Sandeep Rathod; Chartered Accountant: Pushpak B Mundada & Associates; Chartered Accountant: Sunil Shamrao Nimbalkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Green County Phase II Wing-B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Green County Phase II Wing-B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Green County Phase II Wing-B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.