Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Green County Phase II Wing-B is a Residential / Group Housing project by Anand Developers in Pune, Maharashtra, registered with MahaRERA as P52100026716 on 21 Oct 2020. The registration is recorded completed; possession was promised by 30 Jun 2025. 160 of the 222 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.
At a glance
Project
- NameGreen County Phase II Wing-B
- TypeResidential / Group Housing
- Location
- Saswad Road
- Fursungi
- Haveli
- Pune
- 412307
- Pincode412307
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100026716
- ReraGenie IDRG-MH-16381
Builder
- NameAnand Developers
- Entity typePartnership
- PartnersDevendra Bankatlal Rathi, Nitin Suresh Malpani, Devendra Bankatlal Rathi, Niraj Vithaldas Mantri, Manoj Ramdayal Asava, Kamlesh Shriniwas Khatod, Kalpesh Rameshchandra Bhutada, Manohar Gopikisan Baheti, Rishikesh Suresh Baheti, Sanjay Vasudev Maheshwari, Chandanmal Ramlal Oswal
- Other registrations10 more →
- Completed6 of 11
- No longer live3 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on21 Oct 2020
- Promised completion30 Jun 2025
- Revised completionNone
- Buildings2 building records
- Documents filed101 files
Current status
Figures as on 30 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Mhada on 1st Floor and Flat 2 to 13 from 2nd to 11st floor | NA | 14 | 11 | 135 | 0 | 135 |
| Flat 1 to 16 from 12th to 14th Floor and Flat 1, 14, 15, 16 from 2nd to 11th Floor | NA | 17 | 14 | 87 | 0 | 87 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.
Mhada on 1st Floor and Flat 2 to 13 from 2nd to 11st floor82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Flat 1 to 16 from 12th to 14th Floor and Flat 1, 14, 15, 16 from 2nd to 11th Floor90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 95% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 95% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | Yes | 85% |
| Open Parking | Yes | 100% |
Parking filed145
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Mhada on 1st Floor and Flat 2 to 13 from 2nd to 11st floor | 144 | 144 |
| Flat 1 to 16 from 12th to 14th Floor and Flat 1, 14, 15, 16 from 2nd to 11th Floor | 1 | 1 |
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Sudha Sanjay Harpale | Pune (M Corp.) | Pune |
| Sanjay Harpale, Sanjay Deshmukh & Sachin Harpale | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Mhada on 1st Floor and Flat 2 to 13 from 2nd to 11st floor | NA | Rs 20.00 cr | Rs 19.30 cr |
| Flat 1 to 16 from 12th to 14th Floor and Flat 1, 14, 15, 16 from 2nd to 11th Floor | NA | Rs 20.00 cr | Rs 19.30 cr |
| - | NA | Rs 5.00 cr | Rs 4.80 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | A Design Studio |
| Engineer | Sandeep Rathod |
| Chartered Accountant | Pushpak B Mundada & Associates |
| Chartered Accountant | Sunil Shamrao Nimbalkar |
| Partner | Role in project |
|---|---|
| Anand Developers | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Jul 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Feb 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Feb 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 7 Feb 2025
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: FULL OCCUPANCY CERTIFICATE 7-02-2025.pdf | 30 Apr 2026 |
| Occupational CertificateFile: ARCHITECT CERTIFICATE (FORM-4).pdf | 30 Apr 2026 |
| Occupational CertificateFile: 1-5.PDF | 30 Apr 2026 |
| Occupational CertificateFile: 2-5.PDF | 30 Apr 2026 |
| Occupational CertificateFile: 3-5.PDF | 30 Apr 2026 |
| Occupational CertificateFile: 4-5.pdf | 30 Apr 2026 |
| Occupational CertificateFile: 5-5.PDF | 30 Apr 2026 |
| Occupational CertificateFile: OC Verification Email Screenshot.pdf | 30 Apr 2026 |
| Form 1File: Anand Developers Arch Certificate.pdf | 16 Mar 2026 |
| Form 2File: Anand Developers Engg Certificate.pdf | 16 Mar 2026 |
| Form 3File: CA Certificate-GCII.pdf | 16 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Discloser Of Sold Inventry Anand Developers phase 2.pdf | 16 Mar 2026 |
| Form 1File: Anand Developers Arch Certificate JAN 2025.pdf | 16 Feb 2026 |
| Form 2File: Anand Developers Engg Certificate JAN 2025.pdf | 16 Feb 2026 |
| Form 3File: CA certificate JAN 2025.pdf | 16 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Green County Sold Unsold Inventry JAN 2025.pdf | 16 Feb 2026 |
| Withdrawal Update Form 1File: Anand Developers Arch Certificate Dec 2024.pdf | 16 Feb 2026 |
| Withdrawal Update Form 2File: Anand Developers Engg Certificate Dec 2024.pdf | 16 Feb 2026 |
| Withdrawal Update Form 3File: Green County CA Certificate Dec 2024.pdf | 16 Feb 2026 |
| Form 1File: GC Ph-ll Arch Certificate.pdf | 13 Feb 2026 |
| Form 2File: GC 2 Engg Certificate.pdf | 13 Feb 2026 |
| Form 3File: CA Certificate_GC Ph-ll.pdf | 13 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD INVENTORY GC II.pdf | 13 Feb 2026 |
| Form 1File: Architect Certificate GCII 30 September.pdf | 13 Feb 2026 |
| Form 2File: Engg Certificate GC II September 30.pdf | 13 Feb 2026 |
| Form 3File: CA Certificate Green County Phase ll B Building.pdf | 13 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventry Green County Phase ll B.pdf | 13 Feb 2026 |
| Form 1File: Anand Developers Arch Certificate Dec 2024.pdf | 13 Feb 2026 |
| Form 2File: Anand Developers Engg Certificate Dec 2024.pdf | 13 Feb 2026 |
| Form 3File: Green County CA Certificate Dec 2024.pdf | 13 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Green County Sold Unsold Inventry Dec 2024.pdf | 13 Feb 2026 |
| Form 5 (FY 2024-2025)File: Grren County Audit Report 2024-25.pdf | 19 Nov 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FULL OCCUPANCY CERTIFICATE 7-02-2025.pdf | 7 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Anand Developers Arch Certificate Dec 2024 (1).pdf | 28 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Green County CA Certificate Dec 2024.pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anand Developers Engg Certificate Dec 2024.pdf | 28 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Green County Sold Unsold Inventry Dec 2024.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate GCII 30 September.pdf | 8 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Green County Phase ll B Building.pdf | 8 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate GC II September 30.pdf | 8 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventry Green County Phase ll B.pdf | 8 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: A Developers Form 5 2023-24.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GC Ph-ll Arch Certificate.pdf | 24 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GC 2 Engg Certificate.pdf | 24 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY GC II.pdf | 24 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_GC Ph-ll.pdf | 24 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Anand Developers Arch Certificate.pdf | 7 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anand Developers Engg Certificate.pdf | 7 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Anand Developers ENGG Certificate form 2A.pdf | 7 May 2024 |
| Disclosure of sold/ booked inventoryFile: Discloser Of Sold Inventry Anand Developers phase 2.pdf | 7 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-GCII.pdf | 7 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate GC II.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate GC II.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory GC II.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_GC II final-Compressed.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecture Certificate.pdf | 6 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GC II Engg Certificate.pdf | 6 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY.pdf | 6 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_GC Ph-2 Wing B.pdf | 6 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 GC II B wing 2022-23.pdf | 29 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate GC OK.pdf | 10 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate GC OK.pdf | 10 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory GC II.pdf | 10 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Green County Ph-2 Wing B OK.pdf | 10 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory A Developers.pdf | 9 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate A Developers B Wing.pdf | 8 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginner Certificate Anand Developers B Wing.pdf | 8 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Anand Developers B Wing.pdf | 8 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate A Developers B Wing.pdf | 8 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 GC II B wing 2021-22.pdf | 14 Apr 2023 |
| Building plan approvalFile: Revised Plan 1.pdf | 11 Feb 2022 |
| Building plan approvalFile: Revised Plan 2.pdf | 11 Feb 2022 |
| Building plan approvalFile: Revised Plan 3.pdf | 11 Feb 2022 |
| Building plan approvalFile: Revised Plan 4.pdf | 11 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 1.pdf | 11 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 2.pdf | 11 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 3.pdf | 11 Feb 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Plan 4.pdf | 11 Feb 2022 |
| Layout approvalFile: Revised Layout.pdf | 7 Feb 2022 |
| Copy of Layout Approval (in case of layout)File: Revised Layout.pdf | 7 Feb 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 10 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
Keep Green County Phase II Wing-B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Fursungi13,700+ in Pune
Filed coordinates, straight-line distance. 90 registered projects within 2 km.
MAGNACITY - Tower A2
Malnad Project (I) Pvt Ltd
Birla Evam Phase 1
Vypak Properties Private Limited
VTP AURELIA PHASE 1
ASOJ REALTY LLP
GODREJ BOULEVARD
Manjari Housing Projects LLP
Godrej Park Springs
Manjari Housing Projects LLP
VTP DOLCE VITA Phase 1
Ashdan Developers Private Limited
Builder: Anand Developers
ANAND DEVELOPERS has 11 registrations on MahaRERA, including AADITYA HEIGHTS and GREEN COUNTY. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Green County Phase II Wing-B is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Green County Phase II Wing-B?
The registered promoter entity is Anand Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Green County Phase II Wing-B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Green County Phase II Wing-B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Green County Phase II Wing-B?
The professionals named in the filing: Architect: A Design Studio; Engineer: Sandeep Rathod; Chartered Accountant: Pushpak B Mundada & Associates; Chartered Accountant: Sunil Shamrao Nimbalkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Green County Phase II Wing-B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback