Home / Browse projects / Pune, Maharashtra / Green Aura-1

Registered No litigation declared Plotted project

Green Aura-1

By Bhagyashree Yuvraj Kakade

RG-MH-19551 · RERA P52100078243 · Last updated on MahaRERA portal: 17 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 15 months from the original
7 of 19Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

Green Aura-1 is a Plotted project by Bhagyashree Yuvraj Kakade in Pune, Maharashtra, registered with MahaRERA as P52100078243 on 29 Nov 2024. Possession is promised by 31 Mar 2027. The completion date has moved by 15 months from the original filing. 12 of the 19 units on this registration are recorded sold or booked.

At a glance

Project

  • NameGreen Aura-1
  • TypePlotted
  • Location
    • Mauje Sangavi
    • Sangavi
    • Mawal
    • Pune
    • 410401
  • Pincode410401
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078243
  • ReraGenie IDRG-MH-19551

Builder

  • NameBhagyashree Yuvraj Kakade
  • Entity typeIndividual

Key dates

this monthRegisteredNov 2024First promiseDec 2025Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Nov 2024
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Dec 2025)
  • BuildingsNot stated in filing
  • Documents filed64 files

Current status

63%12 of 19 units booked
37.0%Work done, per cost certificate

Figures as on 17 May 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 17 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes30%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes35%
Aggregate area of recreational Open SpaceYes85%
Open ParkingYes0%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,900 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Oct 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional development Authority

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO. 1 & 2, SHRINATHJI BUILDING, CHAKAN ROAD, TALEGAON,PUNE-410 507
Estimated costRs 1.20 cr
Cost incurredRs 44.51 lakh
Work done36.96%
BuildingWingEstimatedIncurred
-NARs 1.20 crRs 44.51 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAjit Thakur Thakur
Architectkaustubh Babar
EngineerAkash Temgire Temgire
EngineerAnkit Gupta
Chartered AccountantCA Priyesh Jain jain
Chartered Accountantnilesh Raut
Chartered AccountantAnita Limaye
PartnerRole in project
Bhagyashree Yuvraj Kakade-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA16122518699Dec 2025 → Mar 2027

Reason as filed by the promoterWe are applying for Extension of our Project Completion Date with MahaRERA Authority under Section - 7(3) of the Act. We would like to inform the Authority that the development on site is under process and is expected to be completed in next 12 to 13 months and then will require another 2 months to fulfil Sanction Authorities formalities and receive the completion certificate for the project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Nov 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 Architect Certificate 31032026.pdf17 May 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 31032026.pdf17 May 2026
Withdrawal Update Form 3File: Form-3 CA Certificaes 31032026_compressed.pdf17 May 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 31122025.pdf2 May 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 31122025.pdf2 May 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 31122025.pdf2 May 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 31122025.pdf2 May 2026
Withdrawal Update Form 3File: Withdrawal Application Form3.pdf2 May 2026
Withdrawal Update Form 3File: Form-3 CA Certificaes 31122025_compressed.pdf2 May 2026
Form 2A (FY 2024-2025)File: Form-2A Quality Assurance Form FY 24-25.pdf24 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 FY24-25.pdf24 Dec 2025
Form 1File: Form-1 Architect Certificate 30062025.pdf15 Nov 2025
Form 2File: Form-2 Engineer Cetificate 30062025.pdf15 Nov 2025
Form 3File: Form-3 CA Certificaes 30062025.pdf15 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30062025.pdf15 Nov 2025
Form 1File: Form-1 Architect Certificate 30092025.pdf15 Nov 2025
Form 2File: Form-2 Engineer Cetificate 30092025.pdf15 Nov 2025
Form 3File: Form-3 CA Certificaes 30092025.pdf15 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30092025.pdf15 Nov 2025
Form 1File: Form-1 Architect Certificate 31122024.pdf26 Sep 2025
Form 2File: Form-2 Engineer Cetificate 31122024.pdf26 Sep 2025
Form 3File: Form-3 CA Certificaes 31122024.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked IInventory 31122024.pdf26 Sep 2025
Form 1File: Form-1 Architect Certificate 25032025.pdf26 Sep 2025
Form 2File: Form-2 Engineer Cetificate 25032025.pdf26 Sep 2025
Form 3File: Form-3 CA Certificaes 25032025.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked IInventory 25032025.pdf26 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 31122024.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 25032025.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Cetificate 31122024.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Cetificate 25032025.pdf27 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificaes 31122024.pdf26 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificaes 25032025.pdf26 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Booked IInventory 31122024.pdf26 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Booked IInventory 25032025.pdf26 Mar 2025
Copy of the legal title reportFile: Legal Title Report 06092024 (Revised) New.pdf18 Nov 2024
Proforma of Allotment letterFile: Proforma Allotment Letter.pdf26 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format-A Declaration abt Designated Bank Ac for the real estate project.pdf26 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation-Agreement for Sale 23102024.pdf26 Oct 2024
Proforma of Agreement for saleFile: Agreement For Sale-Draft Revised 28092024.pdf26 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format-B Letter from the bank regarding the opening of RERA Designated Bank Accounts .pdf26 Oct 2024
Building plan approval or NA orderFile: NA Order 30082024.pdf14 Oct 2024
Layout approvalFile: Sanctioned Plan 20062024.pdf14 Oct 2024
PAN CardFile: PAN Bhagyashri Kakade.pdf14 Oct 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate-Finance 18092024.pdf14 Oct 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance Certificate-Legal 01102024.pdf14 Oct 2024
Copy of Layout Approval (in case of layout)File: Sanctioned Plan 20062024.pdf14 Oct 2024
Declaration in FORM BFile: Form-B Affidavit 18092024.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 18092024.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 01102024.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 29092024.pdf14 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 20062024.pdf14 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: NA Order 30082024.pdf14 Oct 2024
Other - LegalFile: Purchase Deed Bhgyshreekakade and Mundada.pdf14 Oct 2024
Declaration about Commencement CertificateFile: Format-D Declaration about Commencement Certificate 01102024.pdf14 Oct 2024
Declaration about Commencement CertificateFile: CC Authentication Mail.pdf14 Oct 2024
CERSAI detailsFile: CERSAI Undertaking 01102024.pdf14 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter (Revised) 18092024.pdf14 Oct 2024
Details of encumbrances concerned to LegalFile: No Encumbrance Certificate-Finance 18092024.pdf14 Oct 2024
Details of encumbrances concerned to LegalFile: No Encumbrance Certificate-Legal 01102024.pdf14 Oct 2024
Other - TechnicalFile: Annexure-A Decalaration-Cum-Undertaking 18092024.pdf14 Oct 2024
Other - TechnicalFile: CC Authentication Mail.pdf14 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest-Bhagyashree Kakade 18092024.pdf14 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for Securedunsecured Finance availed for the project 12092024.pdf14 Oct 2024

How this compares with Pune

63%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 15 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Green Aura-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sangavi13,700+ in Pune

2 kmGreen Aura-1Completed 12Lapsed / revoked 31Other 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 86 registered projects within 2 km.

Builder: Bhagyashree Yuvraj Kakade

Bhagyashree Yuvraj Kakade has 1 registration on MahaRERA, including Green Aura-1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Green Aura-1 is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Green Aura-1?

The registered promoter entity is Bhagyashree Yuvraj Kakade, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Green Aura-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Green Aura-1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Green Aura-1?

The professionals named in the filing: Architect: Ajit Thakur Thakur; Architect: kaustubh Babar; Engineer: Akash Temgire Temgire; Engineer: Ankit Gupta; Chartered Accountant: CA Priyesh Jain jain; Chartered Accountant: nilesh Raut. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Green Aura-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Green Aura-1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Green Aura-1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.