Registered No litigation declared Others project

Grand Exotica

By Grand Realty

RG-MH-59982 · RERA P52100052285 · Last updated on MahaRERA portal: 25 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
2 of 22Construction stages doneacross 3 buildings; furthest along: Basement (if any), 25%
262 of 483Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 200 documents Report an error

Grand Exotica is a Others project by Grand Realty in Pune, Maharashtra, registered with MahaRERA as P52100052285 on 9 Aug 2023. Possession is promised by 31 Dec 2026. 221 of the 483 units on this registration are recorded sold or booked, and 2 of 22 construction stages are filed complete.

At a glance

Project

  • NameGrand Exotica
  • TypeOthers
  • Location
    • 139P
    • Tathwade
    • Tathwade
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • RERA no.P52100052285
  • ReraGenie IDRG-MH-59982

Builder

  • NameGrand Realty
  • Entity typePartnership
  • PartnersAvinash Pralhad Dighe, Sarika Manoj Sanas, Kaustubh Yuvraj Ahirrao, Akash Bhimarao Deokar, Sachin Dilip Lad, Tejas Dilip Sonigara, Kailash Ankush Pawar, Vijay Bhagwanta Gaikwad, Athrav Santosh Pawar, Nikhil Khandu Pawar, Pandurang Jayawant Gaikwad

Key dates

this monthRegisteredAug 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed200 files

Current status

46%221 of 483 units booked
64.5%Work done, per cost certificate

Figures as on 25 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Grand Exotica A wingNA901780178
Grand Exotica B wingNA17161890189
Grand Exotica C WingNA903581116

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 25%.

Grand Exotica A wingNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Grand Exotica B wing10%
ActivityProgress
Excavation100%
Basement (if any)5%
Podiums (if any)0%
Plinth5%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Grand Exotica C Wing14%
ActivityProgress
Excavation100%
Basement (if any)25%
Podiums (if any)0%
Plinth25%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes5%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes3%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed862

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots862
Closed/Covered131
Open Space731
BuildingClosed/CoveredOpen SpaceTotal
Grand Exotica A wing0316316
Grand Exotica B wing100316416
Grand Exotica C Wing3199130

Land and ownership33

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area10,155 sq m
Land owned byThe promoter, with other names on the file
Named landowners33
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Aug 2025
LandownerVillageDistrict
Shrinkant Hanumant PawarTathwadePune
Mr. Khandu Damu PawarTathwadePune
Mr Tanaji Ramu alias Rambhau PawarTathwadePune
Vimal Hanumant PawarTathwadePune
Mrs Dipali Ravindra SakhareTathwadePune
Mrs. Shilpa Suraj KadTathwadePune
Mrs Jyotsana Sachin MalgheTathwadePune
Kailas Ankush PawarTathwadePune
Gauri Shrikant PawarTathwadePune
Prinsika Shrikant PawarTathwadePune
Saraswati Ankush PawarTathwadePune
Manisha Kailas PawarTathwadePune
Shrusti Kailas PawarTathwadePune
Sunita Nitin GawadeTathwadePune
Rekha Satish TahwareTathwadePune
Surekha Rohidas VargeTathwadePune
Sarika Sahaji BhosaleTathwadePune
Dwarka Khandu PawarTathwadePune
Nikhil Khandu PawarTathwadePune
Pratiksha nikhil PawarTathwadePune
Akshara Nikhil PawarTathwadePune
Komal Tushar ShelarTathwadePune
Samrudhi Kailash PawarTathwadePune
Sawarali Kailas PawarTathwadePune
Surekha Tanaji PawarTathwadePune
Sagar Tanaji PawarTathwadePune
Reshma Rahul RaksheTathwadePune
Swapna Mahendra PadaleTathwadePune
Manasi Kiran JadhavTathwadePune
Ankush Damu PawarTathwadePune
Khandu Damu PawarTathwadePune
Tanaji Ramu alias Rambhau PawarTathwadePune
Mr. Kailas Ankush PawarTathwadePune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI38370.1
Proposed, not sanctioned17,584 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRavet, Pune
Estimated costRs 149.38 cr
Cost incurredRs 96.38 cr
Work done64.52%
BuildingWingEstimatedIncurred
Grand Exotica A wingNARs 72.34 crRs 42.30 cr
Grand Exotica B wingNARs 65.57 crRs 51.37 cr
Grand Exotica C WingNARs 8.75 crRs 2.42 cr
-NARs 2.72 crRs 28.70 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPatil and Bugade Associates
EngineerRohinee Engineers
EngineerUmesh Arun Jadhav
Chartered AccountantN V Ghadge & Company
Chartered AccountantGanesh Devkar And Associates
PartnerRole in project
Grand Realty-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed200

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 200 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2026-2027)File: Form 2 A 26-27.pdf25 May 2026
Form 2A (FY 2025-2026)File: Form 2A 25-26.pdf1 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf16 Feb 2026
Withdrawal Update Form 2File: Form 2 Grand.pdf16 Feb 2026
Withdrawal Update Form 3File: FORM 3_compressed (2).pdf16 Feb 2026
Form 5 (FY 2024-2025)File: form 5 24-25 (2).pdf14 Feb 2026
Withdrawal Update Form 1File: Form 1 Jun 2025 (2).pdf12 Nov 2025
Withdrawal Update Form 1File: Form 1 Sep 2025 s.pdf12 Nov 2025
Withdrawal Update Form 1File: Form 1 Sep 2025 s.pdf12 Nov 2025
Withdrawal Update Form 2File: Form 2 Jun 2025.pdf12 Nov 2025
Withdrawal Update Form 2File: Form 2 Sep 2025.pdf12 Nov 2025
Withdrawal Update Form 2File: Form 2 Sep 2025.pdf12 Nov 2025
Withdrawal Update Form 3File: Form 3 Jun 2025 (2)_compressed (1).pdf12 Nov 2025
Withdrawal Update Form 3File: Form 3 Sep 2025_compressed.pdf12 Nov 2025
Withdrawal Update Form 3File: Form 3 Sep 2025_compressed.pdf12 Nov 2025
Form 1File: Sep 2023 Form 1.pdf21 Jun 2025
Form 2File: Sep 2023 Form 2.pdf21 Jun 2025
Form 3File: Sep 2023 Form 3.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sep 2023 Sold Unsold.pdf21 Jun 2025
Self-declaration of Quarterly ProgressFile: Sep 2023 Q D.pdf21 Jun 2025
Form 1File: Dec 2023 Form 1.pdf21 Jun 2025
Form 2File: Dec 2023 Form 2.pdf21 Jun 2025
Form 3File: Dec 2023 Form 3.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: Dec 2023 Sold Unsold.pdf21 Jun 2025
Self-declaration of Quarterly ProgressFile: Dec 2023 Q D.pdf21 Jun 2025
Form 1File: March 2024 Form 1.pdf21 Jun 2025
Form 2File: March 2024 Form 2.pdf21 Jun 2025
Form 3File: March 2024 Form 3.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: March 2024 Sold Unsold.pdf21 Jun 2025
Self-declaration of Quarterly ProgressFile: Mar 2024 Q D.pdf21 Jun 2025
Form 1File: Jun 2024 Form 1.pdf21 Jun 2025
Form 2File: Jun 2025 Form 2.pdf21 Jun 2025
Form 3File: Jun 2024 Form 3.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: Jun 2024 Sold Unsold.pdf21 Jun 2025
Self-declaration of Quarterly ProgressFile: Jun 2024 Q D.pdf21 Jun 2025
Form 1File: Sep 2024 Form 1.pdf21 Jun 2025
Form 2File: Sep 2024 Form 2.pdf21 Jun 2025
Form 3File: Sep 2024 Form 3_compressed.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sep 2024 Sold Unsold.pdf21 Jun 2025
Self-declaration of Quarterly ProgressFile: Sep 2024 Q D.pdf21 Jun 2025
Form 1File: dec 2024 Form 1.pdf21 Jun 2025
Form 2File: Dec 2024 Form 2.pdf21 Jun 2025
Form 3File: DEC 24 Form 3_compressed.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: Dec 2024 Sold Unsold_compressed.pdf21 Jun 2025
Self-declaration of Quarterly ProgressFile: Dec 2024 Q D.pdf21 Jun 2025
Form 1File: March 2025 Form 1.pdf21 Jun 2025
Form 2File: March 2025 Form 2.pdf21 Jun 2025
Form 3File: March 2025 Form 3.pdf21 Jun 2025
Disclosure of Sold and Booked InventoryFile: March 2025 Sold Unsold_compressed.pdf21 Jun 2025
Self-declaration of Quarterly ProgressFile: Mar 2025 Q D.pdf21 Jun 2025
Form 2A (FY 2023-2024)File: 2A 2023-24.pdf21 Jun 2025
Form 2A (FY 2024-2025)File: 2A 2024- 25.pdf21 Jun 2025
Form 5 (FY 2023-2024)File: Form 5 2023-24.pdf21 Jun 2025
5 (8) (1)29 Apr 2025
5 (5) (1)29 Apr 2025
5 (7) (1) (1)29 Apr 2025
5 (9) (1)29 Apr 2025
5 (9) (2)29 Apr 2025
Layout approvalFile: scan 703.pdf25 Apr 2025
Layout approvalFile: scan 702.pdf25 Apr 2025
Layout approvalFile: scan 701.pdf25 Apr 2025
Layout approvalFile: scan 700.pdf25 Apr 2025
Layout approvalFile: scan 699.pdf25 Apr 2025
Layout approvalFile: scan 698.pdf25 Apr 2025
Layout approvalFile: scan 697.pdf25 Apr 2025
Layout approvalFile: scan 696.pdf25 Apr 2025
Layout approvalFile: scan 695_compressed.pdf25 Apr 2025
Layout approvalFile: scan 694.pdf25 Apr 2025
Layout approvalFile: scan 693.pdf25 Apr 2025
Layout approvalFile: scan 693.pdf25 Apr 2025
Layout approvalFile: scan 692.pdf25 Apr 2025
Building plan approvalFile: scan 692.pdf25 Apr 2025
Building plan approvalFile: scan 703.pdf25 Apr 2025
Building plan approvalFile: scan 702.pdf25 Apr 2025
Building plan approvalFile: scan 701.pdf25 Apr 2025
Building plan approvalFile: scan 700.pdf25 Apr 2025
Building plan approvalFile: scan 699.pdf25 Apr 2025
Building plan approvalFile: scan 696.pdf25 Apr 2025
Building plan approvalFile: scan 694.pdf25 Apr 2025
Building plan approvalFile: scan 693.pdf25 Apr 2025

How this compares with Pune

46%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Grand Exotica on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Tathwade13,700+ in Pune

Builder: Grand Realty

Grand Realty has 1 registration on MahaRERA, including Grand Exotica. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Grand Exotica is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Grand Exotica?

The registered promoter entity is Grand Realty, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Grand Exotica?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Grand Exotica?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Grand Exotica?

The professionals named in the filing: Architect: Patil and Bugade Associates; Engineer: Rohinee Engineers; Engineer: Umesh Arun Jadhav; Chartered Accountant: N V Ghadge & Company; Chartered Accountant: Ganesh Devkar And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Grand Exotica?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Grand Exotica. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Grand Exotica to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.