Red flags
- Litigation declared, 1 case
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GRACE SQUARE TYPE D3 is a Residential / Group Housing project by SHREE SUMATINATH ENTERPRISES LLP in Thane, Maharashtra, registered with MahaRERA as P51700022357 on 16 Sep 2019. The registration is recorded completed; possession was promised by 30 Dec 2026. 128 of the 128 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameGRACE SQUARE TYPE D3
- TypeResidential / Group Housing
- Location
- TMC STADIUM ROAD
- KAUSA
- Thane (M Corp.)
- Thane
- 400612
- Pincode400612
- RERA no.P51700022357
- ReraGenie IDRG-MH-12702
Builder
- NameSHREE SUMATINATH ENTERPRISES LLP
- Entity typePartnership
- PartnersVIVEK MAHESHCHANDRA MANGLA, BIPIN RAMJI KATIRA, DEEPAK PARSMAL JAIN, GOPAL TAHALRAM LALWANI, MANOJ TAHALRAM LALWANI, MANSUKH VELJI SHAH, NAVINCHANDRA PANCHALAL SAVLA, RAJNI KANYALAL DHIRMALANI, RAMESH VELJI SHAH, SACHIN CHANDRU MIRANI, VINOD KUMAR JAIN, KIRORIMAL DARYANOMAL KUNDNANI and 6 more
- Other registrations2 more →
- Completed3 of 3
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on16 Sep 2019
- Promised completion30 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed59 files
Current status
Figures as on 2 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| D3 | NA | 54 | 22 | 128 | 0 | 128 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
D3: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 2 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed11
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| D3 | NA | Rs 20.20 cr | Rs 20.20 cr |
| - | NA | Rs 50.00 lakh | Rs 50.00 lakh |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | TEN FOLDS ARCHITECTS AND CONSULTANTS |
| Engineer | AJAY MAHALE AND ASSOCIATES |
| Chartered Accountant | NEHA AMIT & ASSOCIATES |
| Partner | Role in project |
|---|---|
| SHREE SUMATINATH ENTERPRISES LLP | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 676-2018/2018 | THANE | PENDING |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Sep 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Sep 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Sep 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Sep 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed59
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: 20250630 D3 -ARCHITECT RERA CERTIFICATE-D3.pdf | 2 May 2026 |
| Withdrawal Update Form 1File: 20250630 D3 -ARCHITECT RERA CERTIFICATE-D3.pdf | 2 May 2026 |
| Withdrawal Update Form 1File: 20250930 D3 -ARCHITECT RERA CERTIFICATE-D3.pdf | 2 May 2026 |
| Withdrawal Update Form 1File: 20251231 ARCHITECTS CERTIFICATE-D3.pdf | 2 May 2026 |
| Withdrawal Update Form 1File: 20260331 ARCHITECTS CERTIFICATE-D3.pdf | 2 May 2026 |
| Withdrawal Update Form 1File: 20260331 ARCHITECTS CERTIFICATE-D3.pdf | 2 May 2026 |
| Withdrawal Update Form 2File: 20250630 D3 -ENGINEERS CERTIFICATE-D3.pdf | 2 May 2026 |
| Withdrawal Update Form 2File: 20250630 D3 -ENGINEERS CERTIFICATE-D3.pdf | 2 May 2026 |
| Withdrawal Update Form 2File: 20250930 D3 -ENGINEERS CERTIFICATE-D3.pdf | 2 May 2026 |
| Withdrawal Update Form 2File: 20251231 ENGINEERS CERTIFICATE-D3.pdf | 2 May 2026 |
| Withdrawal Update Form 2File: 20251231 ENGINEERS CERTIFICATE-D3.pdf | 2 May 2026 |
| Withdrawal Update Form 2File: 20251231 ENGINEERS CERTIFICATE-D3.pdf | 2 May 2026 |
| Withdrawal Update Form 3File: 20250630 CA CERTIFICATE TOWER-D3.pdf | 2 May 2026 |
| Withdrawal Update Form 3File: 20250630 CA CERTIFICATE TOWER-D3.pdf | 2 May 2026 |
| Withdrawal Update Form 3File: 20250930 CA CERTIFICATE TOWER-D3.pdf | 2 May 2026 |
| Withdrawal Update Form 3File: 20251231 CA CERTIFICATE TOWER-D3.pdf | 2 May 2026 |
| Withdrawal Update Form 3File: 20260331 CA CERTIFICATE TOWER-D3.pdf | 2 May 2026 |
| Withdrawal Update Form 3File: 20260331 CA CERTIFICATE TOWER-D3.pdf | 2 May 2026 |
| Occupational CertificateFile: D3 OC.pdf | 2 May 2026 |
| Withdrawal Update Form 1File: CA CERTIFICATE ( 31-03-25 ).pdf | 27 Apr 2026 |
| Withdrawal Update Form 2File: Ajay Mahale-D3.pdf | 27 Apr 2026 |
| Withdrawal Update Form 3File: C.A Certificate (Tower D3)6.6.19.pdf | 27 Apr 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE OCT 2023.pdf | 25 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE JULY 2023.pdf | 25 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE JAN 2024.pdf | 25 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE APRIL 2023.pdf | 25 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE APRIL 2024.pdf | 25 Jan 2025 |
| Other - LegalFile: Marubai Highcourt Dismissal Order.pdf | 25 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD FLATS.pdf | 25 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer grace Square APRIL.pdf | 25 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer JULY.pdf | 25 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer grace Square OCT.pdf | 25 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: GRACE SQUARE ANNUAL REPORT APR-23 TO MAR-24.pdf | 25 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: D3 ANNUAL REPORT ON STATEMENT OF ACCOUNTS FORM -5 RERA AUDIT.pdf | 3 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: D3.pdf | 17 Mar 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 FOLDS-D3.pdf | 24 Jan 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ajay Mahale-D3.pdf | 24 Jan 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WORK COMP D3.pdf | 27 Jul 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_D3.pdf | 27 Jul 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3-D3.pdf | 27 Jul 2021 |
| Layout approvalFile: D3 Drawing.pdf | 11 Sep 2019 |
| Layout approvalFile: D3 Drawing.pdf | 11 Sep 2019 |
| Layout approvalFile: Master Plan.pdf | 11 Sep 2019 |
| Building plan approvalFile: D3 Drawing.pdf | 11 Sep 2019 |
| Copy of Layout Approval (in case of layout)File: D3 Drawing.pdf | 11 Sep 2019 |
| Copy of Layout Approval (in case of layout)File: D3 Drawing.pdf | 11 Sep 2019 |
| Copy of Layout Approval (in case of layout)File: Master Plan.pdf | 11 Sep 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: D3 Drawing.pdf | 11 Sep 2019 |
| PAN CardFile: PAN.pdf | 6 Sep 2019 |
| Copy of the legal title reportFile: title certificate.pdf | 6 Sep 2019 |
| Details of encumbrancesFile: details of encumbrance.pdf | 6 Sep 2019 |
| Details of encumbrancesFile: decribtion of encumbrance.pdf | 6 Sep 2019 |
| Details of encumbrancesFile: details of encumbrance 1.pdf | 6 Sep 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: commencement certificate.pdf | 6 Sep 2019 |
| Declaration in FORM BFile: declearation of form B.pdf | 6 Sep 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 6 Sep 2019 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 6 Sep 2019 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 6 Sep 2019 |
| Proforma of Allotment letterFile: performa allotment.pdf | 6 Sep 2019 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| GRACE SQUARE PHASE 2 C1,C2,C3,C4,C5 | GRACE SQUARE OPP TMC STADIUM BEHIND KAUSA TALAO KAUSA MUMBRA THANE 400612 | 175 | Completed | Jun 2017 | Late, Jul 2017 |
| GRACE SQUARE PHASE 1 A1,A2,B1,B2,B3,B4,B5 | GRACE SQUARE OPP TMC STADIUM BEHIND KAUSA TALAO KAUSA MUMBRA THANE 400612 | 266 | Completed | Jun 2015 | Late, Oct 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 59 filed documents as one ZIP, foldered, with a manifest
Keep GRACE SQUARE TYPE D3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KAUSA7,600+ in Thane
DOSTI PLANET NORTH - SECTOR 3
CHALAMA INFRAPROPERTIES PRIVATE LIMITED
NICE WORLD 1
NICE BUILDERS
CENTRAL PARK
HARMAIN ENTERPRISES
MUKTA GHARONDA
SKYLARK INFRASTRUCTURES
Palm Riveria
YES REALTY
Trinity Paradise Phase 1
Trinity Builders
See every Thane project, with the district possession charts
Builder: SHREE SUMATINATH ENTERPRISES LLP
SHREE SUMATINATH ENTERPRISES LLP has 3 registrations on MahaRERA, including GRACE SQUARE TYPE D5 and GRACE SQUARE TYPE D4. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if GRACE SQUARE TYPE D3 is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GRACE SQUARE TYPE D3?
The registered promoter entity is SHREE SUMATINATH ENTERPRISES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GRACE SQUARE TYPE D3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GRACE SQUARE TYPE D3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GRACE SQUARE TYPE D3?
The professionals named in the filing: Architect: TEN FOLDS ARCHITECTS AND CONSULTANTS; Engineer: AJAY MAHALE AND ASSOCIATES; Chartered Accountant: NEHA AMIT & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GRACE SQUARE TYPE D3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback