ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Goodland Phase I

Registered No litigation declared Plotted project

Goodland Phase I

By Goodland Realty Private Limited

RG-MH-17811 · RERA P52100077050 · Last updated on MahaRERA portal: 29 Apr 2026

Source: official MahaRERA filing

Red flags

  • 5 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
184 of 184Units unsoldnot recorded sold or booked
5Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

Goodland Phase I is a Plotted project by Goodland Realty Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100077050 on 16 Jul 2024. Possession is promised by 31 Dec 2027. 0 of the 184 units on this registration are recorded sold or booked. 5 complaints are on record with the regulator.

At a glance

Project

  • NameGoodland Phase I
  • TypePlotted
  • Location
    • Mugavade
    • Mulshi
    • Pune
    • 412115
  • Pincode412115
  • RERA no.P52100077050
  • ReraGenie IDRG-MH-17811

Builder

  • NameGoodland Realty Private Limited
  • Entity typeCompany
  • CINU45209PN2011PTC138257
  • GSTIN27AAECG1018K1ZR
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsSATISH SUBHASH BOTAKE, BALASAHEB MANOHAR MHANDULE
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Jul 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed76 files

Current status

0%0 of 184 units booked
8.9%Work done, per cost certificate

Figures as on 29 Apr 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyNo5%
Sewerage (Chamber, Lines, Septic Tank , STP)No25%
Storm Water DrainsNo50%
Landscaping & Tree PlantingNo3%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area44,276 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jan 2026

Approvals and building plan

Sanctioning authorityPMRDA

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDinshaw House, 918, Synagouge Street, Pune-411001
Estimated costRs 10.72 cr
Cost incurredRs 95.51 lakh
Work done8.91%
BuildingWingEstimatedIncurred
-NARs 10.72 crRs 95.51 lakh

Certifying professionals and partners10

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR. Amruta Deshpande
ArchitectAmruta Deshpande
ArchitectVASTU NIRMAN
EngineerMr Prakash Patil
EngineerAmar Jadhav
Chartered AccountantANIRUDDHA SONAR & ASSOCIATES
Chartered AccountantLaukik Jain
Chartered AccountantM/s. K K KHIRAD & CO
Chartered AccountantS V MALPANI ASSOCIATES C A
Chartered AccountantDEVESH NAVSALKAR
PartnerRole in project
Goodland Realty Private Limited-

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC12502448Saurabh Shrinivas PansareGoodland Realty Private Limited17/07/2025
CC12601363Shankar BalasubramanianGoodland Realty Private Limited12/03/2026
CC12601364Anil YadavGoodland Realty Private Limited12/03/2026
CC12601367Shraddha YadavGoodland Realty Private Limited12/03/2026
CC12601368Rima ChavanGoodland Realty Private Limited12/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: FORM 2 A 31032025 ph1.pdf29 Apr 2026
Form 2A (FY 2025-2026)File: FORM 2 A 31032026 ph1.pdf29 Apr 2026
Form 5 (FY 2024-2025)File: FORM 5 ph1 20242025.pdf29 Apr 2026
Form 5 (FY 2025-2026)File: FORM 5 ph1 20252026.pdf29 Apr 2026
Withdrawal Update Form 1File: FORM1 GD PH 1 MAR26.pdf24 Apr 2026
Withdrawal Update Form 2File: FORM2 GD PH1 MAR26.pdf24 Apr 2026
Withdrawal Update Form 3File: FORM 3 GD PH 1 MAR26.pdf24 Apr 2026
Form 1File: FORM1 GR1 DEC25.pdf15 Jan 2026
Form 2File: FORM2 GR1 DEC25.pdf15 Jan 2026
Form 3File: FORM3 GR1 DEC25.pdf15 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE BOOKED GR1 DEC25.pdf15 Jan 2026
Form 1File: AR CERT FORM 1 GOODLAND 1 30092025.pdf15 Oct 2025
Form 2File: ENGG CERTI FORM 2 GOODLAND 1 30092025.pdf15 Oct 2025
Form 3File: FORM 3 GOODLAND 1 30092025.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY GOODLAND PHASE 1 30092025.pdf15 Oct 2025
Form 2File: FORM 2_31_03_2025.pdf4 Sep 2025
Form 3File: FORM 3_31_03_2025.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY 31_03_2025.pdf4 Sep 2025
Form 1File: FORM 1.pdf4 Sep 2025
Form 1File: FORM 1.pdf4 Sep 2025
Form 2File: FORM 2.pdf4 Sep 2025
Form 3File: FORM 3.pdf4 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOLD INVENTORY.pdf4 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Sep 24.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Dec 24.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-Goodland Phase I_Sept 24.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-Goodland Phase I_Sept 24.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-Goodland Phase I_Dec 24.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Sep 24.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Dec 24.pdf22 Feb 2025
Building plan approval or NA orderFile: Clarification Letter.pdf3 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Clarification Letter.pdf3 Jul 2024
Declaration about Commencement CertificateFile: Form-D.pdf3 Jul 2024
Layout approvalFile: Layoiut Plan-Sheet No-1.pdf27 Jun 2024
Layout approvalFile: Layoiut Plan-Sheet No-2.pdf27 Jun 2024
Layout approvalFile: Layoiut Plan-Sheet No-3.pdf27 Jun 2024
Layout approvalFile: Layoiut Plan-Sheet No-4.pdf27 Jun 2024
Building plan approval or NA orderFile: Layoiut Plan-Sheet No-1.pdf27 Jun 2024
Building plan approval or NA orderFile: Layoiut Plan-Sheet No-2.pdf27 Jun 2024
Building plan approval or NA orderFile: Layoiut Plan-Sheet No-3.pdf27 Jun 2024
Building plan approval or NA orderFile: Layoiut Plan-Sheet No-4.pdf27 Jun 2024
Copy of Layout Approval (in case of layout)File: Layoiut Plan-Sheet No-1.pdf27 Jun 2024
Copy of Layout Approval (in case of layout)File: Layoiut Plan-Sheet No-2.pdf27 Jun 2024
Copy of Layout Approval (in case of layout)File: Layoiut Plan-Sheet No-3.pdf27 Jun 2024
Copy of Layout Approval (in case of layout)File: Layoiut Plan-Sheet No-4.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Layoiut Plan-Sheet No-1.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Layoiut Plan-Sheet No-2.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Layoiut Plan-Sheet No-3.pdf27 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Layoiut Plan-Sheet No-4.pdf27 Jun 2024
Proforma of Agreement for saleFile: Draft Agreement For Sale-Plotting.pdf27 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement_Goodland.pdf27 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate - FORM 2.pdf8 Jun 2024
Other - LegalFile: 06 GPOA RRN to Goodland - converted.pdf8 Jun 2024
Building plan approval or NA orderFile: scan1405 - converted.pdf7 Jun 2024
PAN CardFile: GoodLand Realty Pan Card.pdf7 Jun 2024
Copy of the legal title reportFile: Title Search Report-1-16 - converted.pdf7 Jun 2024
Copy of the legal title reportFile: Title Search Report-17-32 - converted.pdf7 Jun 2024
Details of encumbrances concerned to FinanceFile: No encumbrances concenerd to Finance.pdf7 Jun 2024
Details of encumbrances concerned to FinanceFile: No encumbrances concerned to legal.pdf7 Jun 2024
Details of encumbrances concerned to LegalFile: No encumbrances concenerd to Finance.pdf7 Jun 2024
Details of encumbrances concerned to LegalFile: No encumbrances concerned to legal.pdf7 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: scan1405 - converted.pdf7 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf7 Jun 2024
Declaration in FORM BFile: Form B.pdf7 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf7 Jun 2024
CERSAI detailsFile: CERSAI Details.pdf7 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf7 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Both Director Disclosure of Interest.pdf7 Jun 2024
Proforma of Allotment letterFile: Allotment Letter.pdf7 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Formate A Bank Account.pdf7 Jun 2024
Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter.pdf7 Jun 2024
Other - LegalFile: 01 DEED OF CON RSVL TO GLREALTY-Sale Deed - converted.pdf7 Jun 2024
Other - LegalFile: 05 RRN TO GLAND - converted.pdf7 Jun 2024
Other - LegalFile: 3 Sale Deed-1-50 - converted.pdf7 Jun 2024
Other - LegalFile: 3 Sale Deed-51-95 - converted.pdf7 Jun 2024
Other - TechnicalFile: Annexure A Undertaking.pdf7 Jun 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Goodland Phase IIP52100080517Mugavade, Pune74Jun 2025OngoingDec 2028Not due yet

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Goodland Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mugavade13,700+ in Pune

Builder: Goodland Realty Private Limited

Goodland Realty Private Limited has 3 registrations on MahaRERA, including Goodland Phase I and Goodland Phase II. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Goodland Phase I is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Goodland Phase I?

The registered promoter entity is Goodland Realty Private Limited, a company as per the filing. Its CIN U45209PN2011PTC138257 and GSTIN 27AAECG1018K1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Goodland Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Goodland Phase I?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Goodland Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Goodland Phase I?

The professionals named in the filing: Architect: AR. Amruta Deshpande; Architect: Amruta Deshpande; Architect: VASTU NIRMAN; Engineer: Mr Prakash Patil; Engineer: Amar Jadhav; Chartered Accountant: ANIRUDDHA SONAR & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Goodland Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Goodland Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Goodland Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.