Golden Leaf Lonavala
RG-MH-24559 · RERA P52100004231 · Last updated on MahaRERA portal: 2 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 40 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 51 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Golden Leaf Lonavala is a Residential / Group Housing project by Landmark Developers in Pune, Maharashtra, registered with MahaRERA as P52100004231 on 9 Aug 2017. Possession was promised by 30 Jun 2023 and is now 40 months past that date. The completion date has moved by 51 months from the original filing. 22 of the 23 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameGolden Leaf Lonavala
- TypeResidential / Group Housing
- Location
- Lonavala
- Lonavala (M Cl)
- Mawal
- Pune
- 410401
- Pincode410401
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100004231
- ReraGenie IDRG-MH-24559
Builder
- NameLandmark Developers
- Entity typePartnership
- PartnersSandip Balkrishna Banger, Deepa Deepesh Bhurat, Jyoti Sushil Sanghvi, Urvi Shailesh Mistry, Shailesh Mistry, Vinod Harshkumar Bhansali
- Other registrations3 more →
- Completed1 of 4
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on9 Aug 2017
- Promised completion30 Jun 2023
- Revised completionRevised to 30 Jun 2023 (originally 30 Mar 2019)
- Buildings1 building record
- Documents filed124 files
Current status
Figures as on 2 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Golden LeafLonavala | NA | 46 | 2 | 23 | 0 | 23 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 40%.
Golden LeafLonavala: 35% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 40% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 5% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 2 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 10% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 65% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed23
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | landmark planners |
| Engineer | Ravi Karnawat |
| Chartered Accountant | Priyesh Jain |
| Chartered Accountant | Nilesh Raut |
| Chartered Accountant | JRT Associates |
| Partner | Role in project |
|---|---|
| Landmark Developers | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTHERE WAS NO ACCESS BECAUSE OF COVID, THERE WAS NO LABOUR, NO SALE.
Reason as filed by the promoterReason beyond control.
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12504617 | Ashwin K Gajara | Landmark Developers | 24/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed124
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 124 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form-1 Architect Certiifcate 31032023.pdf | 2 Sep 2026 |
| Form 2File: Form-2 Engineer Certiifcate 30062023.pdf | 2 Sep 2026 |
| Form 3File: Form-3 CA Certificate 30062023.pdf | 2 Sep 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 30062023.pdf | 2 Sep 2026 |
| Form 1File: Form-1 Architect Certiifcate 31032022.pdf | 2 Sep 2026 |
| Form 2File: Form-2 Engineer Certiifcate 30062022.pdf | 2 Sep 2026 |
| Form 3File: Form-3 CA Certificate 30062022.pdf | 2 Sep 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 30062022.pdf | 2 Sep 2026 |
| Form 1File: Form-1 Architect Certiifcate 31032021.pdf | 2 Sep 2026 |
| Form 2File: Form-2 Engineer Certiifcate 30062021.pdf | 2 Sep 2026 |
| Form 3File: Form-3 CA Certificate 30062021.pdf | 2 Sep 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 30062021.pdf | 2 Sep 2026 |
| Form 1File: Form-1 Architect Certiifcate 31032020.pdf | 2 Sep 2026 |
| Form 2File: Form-2 Engineer Certiifcate 30062020.pdf | 2 Sep 2026 |
| Form 3File: Form-3 CA Certificate 30062020.pdf | 2 Sep 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 30062020.pdf | 2 Sep 2026 |
| Form 1File: Form-1 Architect Certiifcate 31032019.pdf | 2 Sep 2026 |
| Form 2File: Form-2 Engineer Certiifcate 30062019.pdf | 2 Sep 2026 |
| Form 3File: Form-3 CA Certificate 30062019.pdf | 2 Sep 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 30062019.pdf | 2 Sep 2026 |
| Form 1File: Form-1 Architect Certiifcate 31032018.pdf | 2 Sep 2026 |
| Form 2File: Form-2 Engineer Certiifcate 30062018.pdf | 2 Sep 2026 |
| Form 3File: Form-3 CA Certificate 30062018.pdf | 2 Sep 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 30062018.pdf | 2 Sep 2026 |
| Form 2A (FY 2020-2021)File: Form-2A Quality Assurance FY 2020-21.pdf | 2 Sep 2026 |
| Form 2A (FY 2019-2020)File: Form-2A Quality Assurance FY 2019-20.pdf | 2 Sep 2026 |
| Form 2A (FY 2018-2019)File: Form-2A Quality Assurance FY 2018-19.pdf | 2 Sep 2026 |
| Form 2A (FY 2017-2018)File: Form-2A Quality Assurance FY 2017-18.pdf | 2 Sep 2026 |
| Form 5 (FY 2022-2023)File: Form-5 2022-23.pdf | 2 Sep 2026 |
| Form 5 (FY 2021-2022)File: Form-5 2020-21.pdf | 2 Sep 2026 |
| Form 5 (FY 2020-2021)File: Form-5 2020-21.pdf | 2 Sep 2026 |
| Form 5 (FY 2019-2020)File: Form-5 2019-20.pdf | 2 Sep 2026 |
| Form 5 (FY 2018-2019)File: Form-5 2018-19.pdf | 2 Sep 2026 |
| Form 2A (FY 2023-2024)File: Form-2A Quality Assurance FY 2023-24.pdf | 1 Sep 2026 |
| Form 2A (FY 2022-2023)File: Form-2A Quality Assurance FY 2022-23.pdf | 1 Sep 2026 |
| Form 2A (FY 2021-2022)File: Form-2A Quality Assurance FY 2021-22.pdf | 1 Sep 2026 |
| Form 5 (FY 2023-2024)File: Form-5 2023-24.pdf | 1 Sep 2026 |
| Form 1File: Form-1 Architect Certiifcate 31092019.pdf | 28 Aug 2026 |
| Form 2File: Form-2 Engineer Certiifcate 30092019.pdf | 28 Aug 2026 |
| Form 3File: Form-3 CA Certificate 30092019.pdf | 28 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 30062019.pdf | 28 Aug 2026 |
| Form 1File: Form-1 Architect Certiifcate 31122019.pdf | 28 Aug 2026 |
| Form 2File: Form-2 Engineer Certiifcate 30122019.pdf | 28 Aug 2026 |
| Form 3File: Form-3 CA Certificate 31122019.pdf | 28 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 31122019.pdf | 28 Aug 2026 |
| Form 1File: Form-1 Architect Certiifcate 31032020.pdf | 28 Aug 2026 |
| Form 2File: Form-2 Engineer Certiifcate 30032020.pdf | 28 Aug 2026 |
| Form 3File: Form-3 CA Certificate 31032020.pdf | 28 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 31032020.pdf | 28 Aug 2026 |
| Form 1File: Form-1 Architect Certiifcate 31092020.pdf | 28 Aug 2026 |
| Form 2File: Form-2 Engineer Certiifcate 30092020.pdf | 28 Aug 2026 |
| Form 3File: Form-3 CA Certificate 30092020.pdf | 28 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 30092020.pdf | 28 Aug 2026 |
| Form 1File: Form-1 Architect Certiifcate 31122020.pdf | 28 Aug 2026 |
| Form 2File: Form-2 Engineer Certiifcate 30122020.pdf | 28 Aug 2026 |
| Form 3File: Form-3 CA Certificate 31122020.pdf | 28 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 31122020.pdf | 28 Aug 2026 |
| Form 1File: Form-1 Architect Certiifcate 31032021.pdf | 28 Aug 2026 |
| Form 2File: Form-2 Engineer Certiifcate 30032021.pdf | 28 Aug 2026 |
| Form 3File: Form-3 CA Certificate 31032021.pdf | 28 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 31032021.pdf | 28 Aug 2026 |
| Form 1File: Form-1 Architect Certiifcate 31092021.pdf | 28 Aug 2026 |
| Form 2File: Form-2 Engineer Certiifcate 30092021.pdf | 28 Aug 2026 |
| Form 3File: Form-3 CA Certificate 30092021.pdf | 28 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 30092021.pdf | 28 Aug 2026 |
| Form 1File: Form-1 Architect Certiifcate 31122021.pdf | 28 Aug 2026 |
| Form 2File: Form-2 Engineer Certiifcate 30122021.pdf | 28 Aug 2026 |
| Form 3File: Form-3 CA Certificate 31122021.pdf | 28 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 31122021.pdf | 28 Aug 2026 |
| Form 1File: Form-1 Architect Certiifcate 31032022.pdf | 28 Aug 2026 |
| Form 2File: Form-2 Engineer Certiifcate 30032022.pdf | 28 Aug 2026 |
| Form 3File: Form-3 CA Certificate 31032022.pdf | 28 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 31032022.pdf | 28 Aug 2026 |
| Form 1File: Form-1 Architect Certiifcate 31092022.pdf | 28 Aug 2026 |
| Form 2File: Form-2 Engineer Certiifcate 30092022.pdf | 28 Aug 2026 |
| Form 3File: Form-3 CA Certificate 30092020.pdf | 28 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory 30092022.pdf | 28 Aug 2026 |
| Form 1File: Architect Certiifcate 31032023.pdf | 27 Aug 2026 |
| Form 2File: Engineer Certiifcate 30032023.pdf | 27 Aug 2026 |
| Form 3File: Form-3 CA Certificate 31-Mar-2023.pdf | 27 Aug 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 124 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Golden Leaf Lonavala on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Lonavala13,700+ in Pune
Filed coordinates, straight-line distance. 27 registered projects within 2 km.
CANARY FARMS
CANARY FARMS
HRIDAAN HEIGHTS
R SQUARE BUILDERS AND DEVELOPERS
Amoda Reserve - South Park
Kalpataru Properties (Thane) Private Limit
Nakshatra Valley
Hariom Sai Developers
MANTRA DIVINE PHASE 2
MANTRA UNIVERSE PRIVATE LIMITED
EMERALD VILLAS
ASHWIN ARVIND SANGHVI
Builder: Landmark Developers
Landmark Developers has 4 registrations on MahaRERA, including Golden Leaf Lonavala and SAMRUDDHI PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Golden Leaf Lonavala shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Golden Leaf Lonavala is delayed beyond 30 Jun 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Golden Leaf Lonavala?
The registered promoter entity is Landmark Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Golden Leaf Lonavala?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Golden Leaf Lonavala?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Golden Leaf Lonavala?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Golden Leaf Lonavala?
The professionals named in the filing: Architect: landmark planners; Engineer: Ravi Karnawat; Chartered Accountant: Priyesh Jain; Chartered Accountant: Nilesh Raut; Chartered Accountant: JRT Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Golden Leaf Lonavala?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback