Registration lapsed No litigation declared Residential / Group Housing project

GOKULAM

By GOVINDA GANESHA INFRASPACES

RG-MH-12980 · RERA P50300054287 · Last updated on MahaRERA portal: 13 Nov 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 12 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.
Oct 2025Possession promised12 months past this date
30 of 220Construction stages doneacross 20 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 155 documents Report an error

GOKULAM is a Residential / Group Housing project by GOVINDA GANESHA INFRASPACES in Amravati, Maharashtra, registered with MahaRERA as P50300054287 on 15 Jan 2024. Possession was promised by 31 Oct 2025 and is now 12 months past that date.

At a glance

Project

  • NameGOKULAM
  • TypeResidential / Group Housing
  • Location
    • HIRAPUR TO REWSA ROAD
    • HIRAPUR
    • Amravati
    • 444602
  • Pincode444602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50300054287
  • ReraGenie IDRG-MH-12980

Builder

  • NameGOVINDA GANESHA INFRASPACES
  • Entity typePartnership
  • PartnersDIPAK RAMESHLAL GODWANI, AMAN SUBHASH TALDA, AJINKYA MANOJ BHENDE, ARJUN MANOJ BHENDE
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

12 months past promisethis monthRegisteredJan 2024PromisedOct 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on15 Jan 2024
  • Promised completion31 Oct 2025
  • Revised completionNone
  • Buildings20 building records
  • Documents filed155 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROW HOUSE NO 145 TO 157/1NA20000
ROW HOUSE NO 145 TO 157/2NA20000
ROW HOUSE NO 145 TO 157/3NA20000
ROW HOUSE NO 145 TO 157/4NA20000
ROW HOUSE NO 145 TO 157/5NA20000
ROW HOUSE NO 145 TO 157/6NA20000
ROW HOUSE NO 130 TO 142/12NA20000
ROW HOUSE NO 130 TO 142/15NA20000
ROW HOUSE NO 130 TO 142/16NA20000
ROW HOUSE NO 130 TO 142/18NA20000
ROW HOUSE NO 130 TO 142/19NA20000
ROW HOUSE NO 130 TO 142/20NA20000
ROW HOUSE NO 130 TO 142/21NA20000
ROW HOUSE NO 130 TO 142/22NA20000
ROW HOUSE NO 158 TO 169/1NA20000
ROW HOUSE NO 158 TO 169/2NA20000
ROW HOUSE NO 158 TO 169/3NA20000
ROW HOUSE NO 158 TO 169/4NA20000
ROW HOUSE NO 158 TO 169/5NA20000
ROW HOUSE NO 158 TO 169/6NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 13 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 220 construction stages are filed complete across 20 buildings. The stage furthest along is Podiums (if any), at 0%.

ROW HOUSE NO 145 TO 157/182%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
ROW HOUSE NO 145 TO 157/264%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 145 TO 157/364%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 145 TO 157/40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 145 TO 157/50%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 145 TO 157/60%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 130 TO 142/120%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 130 TO 142/150%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 130 TO 142/1664%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 130 TO 142/180%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 130 TO 142/190%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 130 TO 142/200%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 130 TO 142/210%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 130 TO 142/220%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 158 TO 169/10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 158 TO 169/20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 158 TO 169/30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 158 TO 169/40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 158 TO 169/50%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ROW HOUSE NO 158 TO 169/60%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,823 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2065.58
Proposed, not sanctioned2,066 sq m
Buildings approved20
Buildings sanctioned20

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSME BRANCH OLD COTTON MARKKET AMRAVATI 444601

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHUBHAM MUNDHADA
EngineerPANKAJ BAJAJ
Chartered AccountantCA DEEPAK S ZAMBANI G A D AND ASSOCIATES
PartnerRole in project
GOVINDA GANESHA INFRASPACES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed155

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 155 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: GOKULAM 1 Form 1 Arc Cerf_Q2 25-26.pdf13 Nov 2025
Form 2File: GOKULAM 1 Form 2 Eng Cert_Q2 25-26.pdf13 Nov 2025
Form 3File: GOKULAM 1 Form 3 CA Cert_Q2 25-26.pdf13 Nov 2025
Disclosure of Sold and Booked InventoryFile: Gokulam 1_Sold unsold Inventory_Q2 25-26.pdf13 Nov 2025
Form 1File: GOKULAM 1 Form 1 Arc Cerf_Q1 25-26.pdf25 Aug 2025
Form 2File: GOKULAM 1 Form 2 Eng Cert_Q1 25-26.pdf25 Aug 2025
Form 3File: GOKULAM 1 Form 3 CA Cert_Q1 25-26.pdf25 Aug 2025
Disclosure of Sold and Booked InventoryFile: Gokulam 1_Sold unsold Inventory_Q1 25-26.pdf25 Aug 2025
Form 1File: Form 1_300624.pdf6 Aug 2025
Form 2File: Form 2_300624.pdf6 Aug 2025
Form 3File: Form 3_300624.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold_300624.pdf6 Aug 2025
Form 1File: Gokulam 1_Form 1_310324.pdf5 Aug 2025
Form 2File: Gokulam 1_Form 2_310324.pdf5 Aug 2025
Form 3File: Gokulam 1_Form 3_310324.pdf5 Aug 2025
Disclosure of Sold and Booked InventoryFile: Gokulam 1_Sold Unsold_310324.pdf5 Aug 2025
Form 1File: GOKULAM_FORM 1_Q2.pdf5 Aug 2025
Form 2File: GOKULAM_FORM 2_Q2.pdf5 Aug 2025
Form 3File: GOKULAM_FORM 3_Q2.pdf5 Aug 2025
Disclosure of Sold and Booked InventoryFile: GOKULAM_SOLD_Q2.pdf5 Aug 2025
Form 1File: Gokulam 1 Form 1 Arch Cert Q3 24-25.pdf5 Aug 2025
Form 2File: Gokulam 1 Form 2 Eng Cert Q3 24-25.pdf5 Aug 2025
Form 3File: Gokulam 1 Form 3 CA Cert Q3 24-25.pdf5 Aug 2025
Disclosure of Sold and Booked InventoryFile: Gokulam 1 Sold Unsold Q3 24-25.pdf5 Aug 2025
Form 1File: Gokulam 1_Arc Cert_Form1_Q4_24-25.pdf5 Aug 2025
Form 2File: Gokulam 1_Eng Cert_Form 2_Q4_24-25.pdf5 Aug 2025
Form 3File: Gokulam 1_CA Cert_Form 3_Q4_24-25.pdf5 Aug 2025
Disclosure of Sold and Booked InventoryFile: Gokulam 1_Sold Unsold Inventory_Q4_24-25.pdf5 Aug 2025
OthersFile: Gokulam 1_Quality Cert_Form 2A_Q4_24-25.pdf5 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gokulam 1_Arc Cert_Form1_Q4_24-25.pdf8 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gokulam 1_CA Cert_Form 3_Q4_24-25.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gokulam 1_Eng Cert_Form 2_Q4_24-25.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Gokulam 1_Sold Unsold Inventory_Q4_24-25.pdf8 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Gokulam 1_Quality Cert_Form 2A_Q4_24-25.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gokulam 1 Form 1 Arch Cert Q3 24-25.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gokulam 1 Form 3 CA Cert Q3 24-25.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gokulam 1 Form 2 Eng Cert Q3 24-25.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: Gokulam 1 Sold Unsold Q3 24-25.pdf18 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Gokulam 310324.pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GOKULAM_FORM 1_Q2.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GOKULAM_FORM 3_Q2.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GOKULAM_FORM 2_Q2.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: GOKULAM_SOLD_Q2.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gokulam Arc Cert_Q1_FY 24-25.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GOKULAM ENGINEER CERTIFICATE_Form 2 Q1 24-25.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: GOKULAM SOLD UNSOLD INVENTORY _Q1_24-25.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 3 gokulam.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gokulam 1_Form 1_310324.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gokulam 1_Form 2_310324.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Gokulam 1_Sold Unsold_310324.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gokulam 1_Form 3_310324.pdf20 Apr 2024
Layout approvalFile: Second Stamp Map.pdf10 Jan 2024
Copy of Layout Approval (in case of layout)File: Second Stamp Map.pdf10 Jan 2024
Other - TechnicalFile: Second Stamp Map.pdf10 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: NA_Part I.pdf8 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: NA_Part II.pdf8 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: NA_Part III.pdf8 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Gokulam_Format A Bank Revised.pdf2 Jan 2024
Other - FinanceFile: Gokulam_Declaration Area 020124.pdf2 Jan 2024
Other - TechnicalFile: Gokulam_Declaration Area 020124.pdf2 Jan 2024
Layout approvalFile: Gokulam_Layout Map Clear.pdf9 Dec 2023
Copy of Layout Approval (in case of layout)File: Gokulam_Layout Map Clear.pdf9 Dec 2023
Proforma of Agreement for saleFile: ATS_RERA Format_Gokulam_06122023.pdf9 Dec 2023
Other - LegalFile: Gokulam_Declaration.pdf9 Dec 2023
Other - LegalFile: Gokulam_Mail.pdf9 Dec 2023
Other - FinanceFile: Gokulam_Declaration.pdf9 Dec 2023
Other - FinanceFile: Gokulam_Mail.pdf9 Dec 2023
Other - TechnicalFile: Gokulam_Declaration.pdf9 Dec 2023
Other - TechnicalFile: Gokulam_Mail.pdf9 Dec 2023
Layout approvalFile: Hirapur 17 - Manoj Bhende _compressed.pdf16 Nov 2023
Copy of Layout Approval (in case of layout)File: Hirapur 17 - Manoj Bhende _compressed.pdf16 Nov 2023
Details of encumbrances concerned to FinanceFile: Gokulam_Encumberance.pdf15 Nov 2023
Details of encumbrances concerned to LegalFile: Gokulam_Encumberance.pdf15 Nov 2023
Declaration about Commencement CertificateFile: Gokulam_Format D Commencement.pdf15 Nov 2023
Declaration in FORM BFile: Gokulam_Form B.pdf15 Nov 2023
CERSAI detailsFile: Gokulam_Cersai.pdf15 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gokulam_Form 3.pdf15 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Gokulam_Annexure A Dipak.pdf15 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Gokulam_Annexure A Ajinkya.pdf15 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Gokulam_Annexure A Aman.pdf15 Nov 2023

How this compares with Amravati

8%of Amravati projects moved their completion datethis one has not
33%of Amravati registrations have lapsed or been cancelledthis one is among them

Computed across the 450+ Amravati projects on ReraGenie, from their own filings.

Keep GOKULAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HIRAPUR450+ in Amravati

2 kmGOKULAMLapsed / revoked 2Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: GOVINDA GANESHA INFRASPACES

GOVINDA GANESHA INFRASPACES has 2 registrations on MahaRERA, including GOKULAM and GOKULAM 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Amravati district page.

Frequently asked questions

What does it mean that GOKULAM shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if GOKULAM is delayed beyond 31 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOKULAM?

The registered promoter entity is GOVINDA GANESHA INFRASPACES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOKULAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOKULAM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOKULAM?

The professionals named in the filing: Architect: SHUBHAM MUNDHADA; Engineer: PANKAJ BAJAJ; Chartered Accountant: CA DEEPAK S ZAMBANI G A D AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOKULAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOKULAM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOKULAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.