Home / Browse projects / Amravati, Maharashtra / GOKULAM 2

Registered No litigation declared Residential / Group Housing project

GOKULAM 2

By GOVINDA GANESHA INFRASPACES

RG-MH-15185 · RERA P50300055634 · Last updated on MahaRERA portal: 13 Nov 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedno revision filed
9 of 429Construction stages doneacross 39 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 201 documents Report an error

GOKULAM 2 is a Residential / Group Housing project by GOVINDA GANESHA INFRASPACES in Amravati, Maharashtra, registered with MahaRERA as P50300055634 on 5 Apr 2024. Possession is promised by 31 Oct 2026.

At a glance

Project

  • NameGOKULAM 2
  • TypeResidential / Group Housing
  • Location
    • HIRAPUR TO REWSA ROAD
    • HIRAPUR
    • Amravati
    • 444602
  • Pincode444602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50300055634
  • ReraGenie IDRG-MH-15185

Builder

  • NameGOVINDA GANESHA INFRASPACES
  • Entity typePartnership
  • PartnersDIPAK RAMESHLAL GODWANI, AMAN SUBHASH TALDA, AJINKYA MANOJ BHENDE, ARJUN MANOJ BHENDE
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredApr 2024PromisedOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2024
  • Promised completion31 Oct 2026
  • Revised completionNone
  • Buildings39 building records
  • Documents filed201 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GOKULAM HOUSE 01 C22NA20000
GOKULAM HOUSE 02 C21NA20000
GOKULAM HOUSE 03 C20NA20000
GOKULAM HOUSE 04 C19NA20000
GOKULAM HOUSE 05 C18NA20000
GOKULAM HOUSE 06 C17NA20000
GOKULAM HOUSE 07 C16NA20000
GOKULAM HOUSE 08 C15NA20000
GOKULAM HOUSE 09 C14NA20000
GOKULAM HOUSE 10 C13NA20000
GOKULAM HOUSE 11 C12NA20000
GOKULAM HOUSE 13NA20000
GOKULAM HOUSE 14NA20000
GOKULAM HOUSE 17NA20000
GOKULAM HOUSE 07 A7NA20000
GOKULAM HOUSE 08 A8NA20000
GOKULAM HOUSE 09 A9NA20000
GOKULAM HOUSE 10 A10NA20000
GOKULAM HOUSE 11 A11NA20000
GOKULAM HOUSE 12 A12NA20000
GOKULAM HOUSE 13 A13NA20000
GOKULAM HOUSE 01 D1NA20000
GOKULAM HOUSE 02 D2NA20000
GOKULAM HOUSE 03 D3NA20000
GOKULAM HOUSE 04 D4NA20000
GOKULAM HOUSE 05 D5NA20000
GOKULAM HOUSE 06 D6NA20000
GOKULAM HOUSE 07 D7NA20000
GOKULAM HOUSE 08 D8NA20000
GOKULAM HOUSE 09 D9NA20000
GOKULAM HOUSE 10 D10NA20000
GOKULAM HOUSE 11 D11NA20000
GOKULAM HOUSE 12 D12NA20000
GOKULAM HOUSE 13 D13NA20000
GOKULAM HOUSE 14 D14NA20000
GOKULAM HOUSE 15 D15NA20000
GOKULAM HOUSE 16 D16NA20000
GOKULAM HOUSE 17 D17NA20000
GOKULAM HOUSE 18 D18NA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 13 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 39 buildings; the table lists the first 20.

9 of 429 construction stages are filed complete across 39 buildings. The stage furthest along is Podiums (if any), at 0%.

GOKULAM HOUSE 01 C2282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
GOKULAM HOUSE 02 C210%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOKULAM HOUSE 03 C200%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOKULAM HOUSE 04 C190%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOKULAM HOUSE 05 C180%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOKULAM HOUSE 06 C170%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOKULAM HOUSE 07 C160%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOKULAM HOUSE 08 C150%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOKULAM HOUSE 09 C140%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOKULAM HOUSE 10 C130%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOKULAM HOUSE 11 C120%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOKULAM HOUSE 130%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOKULAM HOUSE 140%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOKULAM HOUSE 170%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOKULAM HOUSE 07 A70%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOKULAM HOUSE 08 A80%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOKULAM HOUSE 09 A90%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOKULAM HOUSE 10 A100%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOKULAM HOUSE 11 A110%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
GOKULAM HOUSE 12 A120%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,047 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3841.17
Proposed, not sanctioned3,841 sq m
Buildings approved39
Buildings sanctioned39

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR HONADE BUILDING SHRI GAJANAN TOWNSHIP ROAD POTE ESTATE AMRAVATI 444602

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHUBHAM MUNDHADA
EngineerPANKAJ BAJAJ
Chartered AccountantCA DEEPAK ZAMBANI G A D & ASSOCIATES
PartnerRole in project
GOVINDA GANESHA INFRASPACES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed201

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 201 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: GOKULAM 2 Form 1 Arc Cerf_Q2 25-26.pdf13 Nov 2025
Form 2File: GOKULAM 2 Form 2 Eng Cert_Q2 25-26.pdf13 Nov 2025
Form 3File: GOKULAM 2 Form 3 CA Cert_Q2 25-26.pdf13 Nov 2025
Disclosure of Sold and Booked InventoryFile: Gokulam 2_Sold unsold Inventory_Q2 25-26.pdf13 Nov 2025
Form 1File: GOKULAM 2 Form 1 Arc Cerf_Q1 25-26.pdf25 Aug 2025
Form 2File: GOKULAM 2 Form 2 Eng Cert_Q1 25-26.pdf25 Aug 2025
Form 3File: GOKULAM 2 Form 3 CA Cert_Q1 25-26.pdf25 Aug 2025
Disclosure of Sold and Booked InventoryFile: GOKULAM 2 Form 3 CA Cert_Q1 25-26.pdf25 Aug 2025
Form 1File: Form 1_300624.pdf6 Aug 2025
Form 2File: Form 2_300624.pdf6 Aug 2025
Form 3File: Form 3_300624.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold_300624.pdf6 Aug 2025
Form 1File: GOKULAM 2_FORM 1_SEP 24.pdf5 Aug 2025
Form 2File: GOKULAM 2_FORM 2_SEP 24.pdf5 Aug 2025
Form 3File: GOKULAM 2_FORM 3_SEP 24.pdf5 Aug 2025
Disclosure of Sold and Booked InventoryFile: GOKULAM 2_SOLD_SEP 24.pdf5 Aug 2025
Form 1File: Gokulam 2 Form 1 Arch Cert Q3 24-25.pdf5 Aug 2025
Form 2File: Gokulam 2 Form 2 Eng Cert Q3 24-25.pdf5 Aug 2025
Form 3File: Gokulam 2 Form 3 CA Cert Q3 24-25.pdf5 Aug 2025
Disclosure of Sold and Booked InventoryFile: Gokulam 2 Sold Unsold Q3 24-25.pdf5 Aug 2025
Form 1File: Gokulam 2_Arc Cert_Form 2_Q4_24-25.pdf5 Aug 2025
Form 2File: Gokulam 2_Eng Cert_Form 2_Q4_24-25.pdf5 Aug 2025
Form 3File: Gokulam 2_CA Cert_Form 3_Q4_24-25.pdf5 Aug 2025
Disclosure of Sold and Booked InventoryFile: Gokulam 2_Sold Unsold Inventory_Q4_24-25.pdf5 Aug 2025
OthersFile: Gokulam 2_Quality Cert_Form 2A_Q4_24-25.pdf5 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gokulam 2_Arc Cert_Form 2_Q4_24-25.pdf8 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gokulam 2_CA Cert_Form 3_Q4_24-25.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gokulam 2_Eng Cert_Form 2_Q4_24-25.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Gokulam 2_Sold Unsold Inventory_Q4_24-25.pdf8 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Gokulam 2_Quality Cert_Form 2A_Q4_24-25.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gokulam 2 Form 1 Arch Cert Q3 24-25.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gokulam 2 Form 3 CA Cert Q3 24-25.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gokulam 2 Form 2 Eng Cert Q3 24-25.pdf18 Feb 2025
Disclosure of sold/ booked inventoryFile: Gokulam 2 Sold Unsold Q3 24-25.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GOKULAM 2_FORM 1_SEP 24.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GOKULAM 2_FORM 3_SEP 24.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GOKULAM 2_FORM 2_SEP 24.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: GOKULAM 2_SOLD_SEP 24.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 1 GOKULAM.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 2 GOKULAM.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: 2 SOLD - UNSOLD.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 3 GOKULAM.pdf20 Jul 2024
Declaration about Commencement CertificateFile: Gokulam 2_Format D CC.pdf27 Mar 2024
Declaration in FORM BFile: Gokulam 2_Format B.pdf27 Mar 2024
Proforma of Agreement for saleFile: ATS Gokulam 2 Final 270324.pdf27 Mar 2024
Copy of the legal title reportFile: Gokulam 2_Title Search_Govinda Ganesha Infraspace.pdf14 Feb 2024
Other - LegalFile: 118-123.pdf14 Feb 2024
Other - LegalFile: 124-129.pdf14 Feb 2024
Other - LegalFile: 130 to 157.pdf14 Feb 2024
Other - LegalFile: 131-136.pdf14 Feb 2024
Other - LegalFile: 137-142.pdf14 Feb 2024
Other - LegalFile: 158-163.pdf14 Feb 2024
Other - LegalFile: 164-169.pdf14 Feb 2024
Other - TechnicalFile: Gokulam 2_Annexure A OPOR.pdf14 Feb 2024
Layout approvalFile: Second Stamp Map (1).pdf2 Feb 2024
Layout approvalFile: A SERIES.pdf2 Feb 2024
Layout approvalFile: C SERIES.pdf2 Feb 2024
Layout approvalFile: D SERIES.pdf2 Feb 2024
Copy of Layout Approval (in case of layout)File: Second Stamp Map (1).pdf2 Feb 2024
Copy of Layout Approval (in case of layout)File: A SERIES.pdf2 Feb 2024
Copy of Layout Approval (in case of layout)File: C SERIES.pdf2 Feb 2024
Copy of Layout Approval (in case of layout)File: D SERIES.pdf2 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: NA Order 118 to 129.pdf2 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: NA_Part I.pdf2 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: NA_Part III.pdf2 Feb 2024
Other - TechnicalFile: Gokulam 2_Mail.pdf2 Feb 2024
Details of encumbrances concerned to FinanceFile: Gokulam 2_Encumberance.pdf31 Jan 2024
Details of encumbrances concerned to LegalFile: Gokulam 2_Encumberance.pdf31 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-1.pdf31 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-2.pdf31 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-3.pdf31 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-4.pdf31 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-5.pdf31 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-6.pdf31 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-7.pdf31 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-8.pdf31 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-9.pdf31 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-10.pdf31 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-11.pdf31 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-12.pdf31 Jan 2024

How this compares with Amravati

8%of Amravati projects moved their completion datethis one has not
33%of Amravati registrations have lapsed or been cancelledthis one is on the register

Computed across the 450+ Amravati projects on ReraGenie, from their own filings.

Keep GOKULAM 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HIRAPUR450+ in Amravati

2 kmGOKULAM 2Lapsed / revoked 3Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: GOVINDA GANESHA INFRASPACES

GOVINDA GANESHA INFRASPACES has 2 registrations on MahaRERA, including GOKULAM and GOKULAM 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Amravati district page.

Frequently asked questions

What are my rights if GOKULAM 2 is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GOKULAM 2?

The registered promoter entity is GOVINDA GANESHA INFRASPACES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GOKULAM 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GOKULAM 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GOKULAM 2?

The professionals named in the filing: Architect: SHUBHAM MUNDHADA; Engineer: PANKAJ BAJAJ; Chartered Accountant: CA DEEPAK ZAMBANI G A D & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GOKULAM 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GOKULAM 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GOKULAM 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.