Home / Browse projects / Amravati, Maharashtra / GOKULAM 2
GOKULAM 2
By GOVINDA GANESHA INFRASPACES
RG-MH-15185 · RERA P50300055634 · Last updated on MahaRERA portal: 13 Nov 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GOKULAM 2 is a Residential / Group Housing project by GOVINDA GANESHA INFRASPACES in Amravati, Maharashtra, registered with MahaRERA as P50300055634 on 5 Apr 2024. Possession is promised by 31 Oct 2026.
At a glance
Project
- NameGOKULAM 2
- TypeResidential / Group Housing
- Location
- HIRAPUR TO REWSA ROAD
- HIRAPUR
- Amravati
- 444602
- Pincode444602
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50300055634
- ReraGenie IDRG-MH-15185
Builder
- NameGOVINDA GANESHA INFRASPACES
- Entity typePartnership
- PartnersDIPAK RAMESHLAL GODWANI, AMAN SUBHASH TALDA, AJINKYA MANOJ BHENDE, ARJUN MANOJ BHENDE
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Apr 2024
- Promised completion31 Oct 2026
- Revised completionNone
- Buildings39 building records
- Documents filed201 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GOKULAM HOUSE 01 C22 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 02 C21 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 03 C20 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 04 C19 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 05 C18 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 06 C17 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 07 C16 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 08 C15 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 09 C14 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 10 C13 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 11 C12 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 13 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 14 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 17 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 07 A7 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 08 A8 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 09 A9 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 10 A10 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 11 A11 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 12 A12 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 13 A13 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 01 D1 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 02 D2 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 03 D3 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 04 D4 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 05 D5 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 06 D6 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 07 D7 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 08 D8 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 09 D9 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 10 D10 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 11 D11 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 12 D12 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 13 D13 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 14 D14 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 15 D15 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 16 D16 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 17 D17 | NA | 2 | 0 | 0 | 0 | 0 |
| GOKULAM HOUSE 18 D18 | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building20
As on 13 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 39 buildings; the table lists the first 20.
9 of 429 construction stages are filed complete across 39 buildings. The stage furthest along is Podiums (if any), at 0%.
GOKULAM HOUSE 01 C2282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
GOKULAM HOUSE 02 C210%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GOKULAM HOUSE 03 C200%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GOKULAM HOUSE 04 C190%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GOKULAM HOUSE 05 C180%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GOKULAM HOUSE 06 C170%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GOKULAM HOUSE 07 C160%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GOKULAM HOUSE 08 C150%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GOKULAM HOUSE 09 C140%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GOKULAM HOUSE 10 C130%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GOKULAM HOUSE 11 C120%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GOKULAM HOUSE 130%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GOKULAM HOUSE 140%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GOKULAM HOUSE 170%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GOKULAM HOUSE 07 A70%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GOKULAM HOUSE 08 A80%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GOKULAM HOUSE 09 A90%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GOKULAM HOUSE 10 A100%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GOKULAM HOUSE 11 A110%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
GOKULAM HOUSE 12 A120%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 13 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHUBHAM MUNDHADA |
| Engineer | PANKAJ BAJAJ |
| Chartered Accountant | CA DEEPAK ZAMBANI G A D & ASSOCIATES |
| Partner | Role in project |
|---|---|
| GOVINDA GANESHA INFRASPACES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Feb 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Oct 2026
Documents filed201
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 201 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: GOKULAM 2 Form 1 Arc Cerf_Q2 25-26.pdf | 13 Nov 2025 |
| Form 2File: GOKULAM 2 Form 2 Eng Cert_Q2 25-26.pdf | 13 Nov 2025 |
| Form 3File: GOKULAM 2 Form 3 CA Cert_Q2 25-26.pdf | 13 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Gokulam 2_Sold unsold Inventory_Q2 25-26.pdf | 13 Nov 2025 |
| Form 1File: GOKULAM 2 Form 1 Arc Cerf_Q1 25-26.pdf | 25 Aug 2025 |
| Form 2File: GOKULAM 2 Form 2 Eng Cert_Q1 25-26.pdf | 25 Aug 2025 |
| Form 3File: GOKULAM 2 Form 3 CA Cert_Q1 25-26.pdf | 25 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: GOKULAM 2 Form 3 CA Cert_Q1 25-26.pdf | 25 Aug 2025 |
| Form 1File: Form 1_300624.pdf | 6 Aug 2025 |
| Form 2File: Form 2_300624.pdf | 6 Aug 2025 |
| Form 3File: Form 3_300624.pdf | 6 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold_300624.pdf | 6 Aug 2025 |
| Form 1File: GOKULAM 2_FORM 1_SEP 24.pdf | 5 Aug 2025 |
| Form 2File: GOKULAM 2_FORM 2_SEP 24.pdf | 5 Aug 2025 |
| Form 3File: GOKULAM 2_FORM 3_SEP 24.pdf | 5 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: GOKULAM 2_SOLD_SEP 24.pdf | 5 Aug 2025 |
| Form 1File: Gokulam 2 Form 1 Arch Cert Q3 24-25.pdf | 5 Aug 2025 |
| Form 2File: Gokulam 2 Form 2 Eng Cert Q3 24-25.pdf | 5 Aug 2025 |
| Form 3File: Gokulam 2 Form 3 CA Cert Q3 24-25.pdf | 5 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Gokulam 2 Sold Unsold Q3 24-25.pdf | 5 Aug 2025 |
| Form 1File: Gokulam 2_Arc Cert_Form 2_Q4_24-25.pdf | 5 Aug 2025 |
| Form 2File: Gokulam 2_Eng Cert_Form 2_Q4_24-25.pdf | 5 Aug 2025 |
| Form 3File: Gokulam 2_CA Cert_Form 3_Q4_24-25.pdf | 5 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Gokulam 2_Sold Unsold Inventory_Q4_24-25.pdf | 5 Aug 2025 |
| OthersFile: Gokulam 2_Quality Cert_Form 2A_Q4_24-25.pdf | 5 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gokulam 2_Arc Cert_Form 2_Q4_24-25.pdf | 8 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gokulam 2_CA Cert_Form 3_Q4_24-25.pdf | 8 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gokulam 2_Eng Cert_Form 2_Q4_24-25.pdf | 8 May 2025 |
| Disclosure of sold/ booked inventoryFile: Gokulam 2_Sold Unsold Inventory_Q4_24-25.pdf | 8 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Gokulam 2_Quality Cert_Form 2A_Q4_24-25.pdf | 8 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Gokulam 2 Form 1 Arch Cert Q3 24-25.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Gokulam 2 Form 3 CA Cert Q3 24-25.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Gokulam 2 Form 2 Eng Cert Q3 24-25.pdf | 18 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Gokulam 2 Sold Unsold Q3 24-25.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GOKULAM 2_FORM 1_SEP 24.pdf | 21 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GOKULAM 2_FORM 3_SEP 24.pdf | 21 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GOKULAM 2_FORM 2_SEP 24.pdf | 21 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: GOKULAM 2_SOLD_SEP 24.pdf | 21 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 1 GOKULAM.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 2 GOKULAM.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: 2 SOLD - UNSOLD.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 3 GOKULAM.pdf | 20 Jul 2024 |
| Declaration about Commencement CertificateFile: Gokulam 2_Format D CC.pdf | 27 Mar 2024 |
| Declaration in FORM BFile: Gokulam 2_Format B.pdf | 27 Mar 2024 |
| Proforma of Agreement for saleFile: ATS Gokulam 2 Final 270324.pdf | 27 Mar 2024 |
| Copy of the legal title reportFile: Gokulam 2_Title Search_Govinda Ganesha Infraspace.pdf | 14 Feb 2024 |
| Other - LegalFile: 118-123.pdf | 14 Feb 2024 |
| Other - LegalFile: 124-129.pdf | 14 Feb 2024 |
| Other - LegalFile: 130 to 157.pdf | 14 Feb 2024 |
| Other - LegalFile: 131-136.pdf | 14 Feb 2024 |
| Other - LegalFile: 137-142.pdf | 14 Feb 2024 |
| Other - LegalFile: 158-163.pdf | 14 Feb 2024 |
| Other - LegalFile: 164-169.pdf | 14 Feb 2024 |
| Other - TechnicalFile: Gokulam 2_Annexure A OPOR.pdf | 14 Feb 2024 |
| Layout approvalFile: Second Stamp Map (1).pdf | 2 Feb 2024 |
| Layout approvalFile: A SERIES.pdf | 2 Feb 2024 |
| Layout approvalFile: C SERIES.pdf | 2 Feb 2024 |
| Layout approvalFile: D SERIES.pdf | 2 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: Second Stamp Map (1).pdf | 2 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: A SERIES.pdf | 2 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: C SERIES.pdf | 2 Feb 2024 |
| Copy of Layout Approval (in case of layout)File: D SERIES.pdf | 2 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Order 118 to 129.pdf | 2 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: NA_Part I.pdf | 2 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: NA_Part III.pdf | 2 Feb 2024 |
| Other - TechnicalFile: Gokulam 2_Mail.pdf | 2 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: Gokulam 2_Encumberance.pdf | 31 Jan 2024 |
| Details of encumbrances concerned to LegalFile: Gokulam 2_Encumberance.pdf | 31 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-1.pdf | 31 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-2.pdf | 31 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-3.pdf | 31 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-4.pdf | 31 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-5.pdf | 31 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-6.pdf | 31 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-7.pdf | 31 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-8.pdf | 31 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-9.pdf | 31 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-10.pdf | 31 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-11.pdf | 31 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Cert 118 to 129-12.pdf | 31 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Amravati
Computed across the 450+ Amravati projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 201 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GOKULAM 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near HIRAPUR450+ in Amravati
Filed coordinates, straight-line distance. 6 registered projects within 2 km.
Jai Amba Palm City- Areca Palm Wing A,B,C
Grand Palm City LLP
Vivanta Infinity Private Limited
VIVANTA INFINITY PRIVATE LIMITED
SAHYADRI HEIGHTS
ANSHUMAN BUILDERS
SANKALP ICON
SANKALP DREAM SPACES LLP
RACHANA SRUSHTI PHASE II
SRUSHTI INFRA
Jai Amba Palm City- Queen Palm Wing A B
M/s Grand Palm City LLP
See every Amravati project, with the district possession charts
Builder: GOVINDA GANESHA INFRASPACES
GOVINDA GANESHA INFRASPACES has 2 registrations on MahaRERA, including GOKULAM and GOKULAM 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Amravati district page.
Frequently asked questions
What are my rights if GOKULAM 2 is delayed beyond 31 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GOKULAM 2?
The registered promoter entity is GOVINDA GANESHA INFRASPACES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GOKULAM 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GOKULAM 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GOKULAM 2?
The professionals named in the filing: Architect: SHUBHAM MUNDHADA; Engineer: PANKAJ BAJAJ; Chartered Accountant: CA DEEPAK ZAMBANI G A D & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GOKULAM 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback