Home / Browse projects / Pune, Maharashtra / Gokhale Business Bay Phase II

Registered No litigation declared Commercial project

Gokhale Business Bay Phase II

By Gokhale Landmarks LLP

RG-MH-27676 · RERA P52100034976 · Last updated on MahaRERA portal: 28 Jul 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jan 2028Possession promisedmoved 24 months from the original
6 of 11Construction stages donefurthest along: Internal walls, 80%
82 of 82Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 158 documents Report an error

Gokhale Business Bay Phase II is a Commercial project by Gokhale Landmarks LLP in Pune, Maharashtra, registered with MahaRERA as P52100034976 on 28 Apr 2022. Possession is promised by 31 Jan 2028. The completion date has moved by 24 months from the original filing. 0 of the 82 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameGokhale Business Bay Phase II
  • TypeCommercial
  • Location
    • Plot A7 CTS No-667
    • Kothrud
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • RERA no.P52100034976
  • ReraGenie IDRG-MH-27676

Builder

  • NameGokhale Landmarks LLP
  • Entity typeOthers
  • PartnersVishal Vasant Gokhale Gokhale, Poonam Vishal Gokhale Gokhale
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredApr 2022First promiseJan 2026Revised toJan 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Apr 2022
  • Promised completion31 Jan 2028
  • Revised completionRevised to 31 Jan 2028 (originally 31 Jan 2026)
  • Buildings1 building record
  • Documents filed158 files

Current status

0%0 of 82 units booked
74.5%Work done, per cost certificate

Figures as on 28 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Gokhale Business Bay Phase IINA251108282

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

Gokhale Business Bay Phase II: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 28 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes45%
Storm Water DrainsYes55%
Landscaping & Tree PlantingYes60%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes45%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes45%
Energy managemcntYes70%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1018

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,018
Closed/Covered1,018

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,933 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Jul 2026

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI22315.59
Proposed, not sanctioned22,316 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchABASAHEB GARWARE COLLEGE COMPOUND KARVE ROAD PUNE
Estimated costRs 145.09 cr
Cost incurredRs 108.09 cr
Work done74.5%
BuildingWingEstimatedIncurred
Gokhale Business Bay Phase IINARs 130.58 crRs 104.46 cr
-NARs 14.51 crRs 3.63 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Siddarth Harischandrakar
ArchitectMangesh Gotal
EngineerVijendra Gaikwad
EngineerMahesh Mate
EngineerCHINMAY KARAMBELKAR
Chartered AccountantShantanu G & Associate
Chartered AccountantSIDDHARTH SMART
Chartered AccountantGD APTE & ASSOCIATES
PartnerRole in project
Gokhale Landmarks LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA09022619772Jan 2026 → Jan 2028

Reason as filed by the promoterWe would like to submit that the construction schedule of the project has been significantly impacted due to various genuine and unavoidable circumstances beyond the control of the promoter. These factors have cumulatively led to delays in the timely execution of the project as originally planned. The key reasons are detailed below: Disruption in Supply Chain and Delay in Procurement of Construction Materials: One of the primary causes of delay has been the disruption in the supply chain of essential construction materials such as cement, steel, sand, aggregates, plumbing components, electrica

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
SM12500203Ram GawaliGokhale Landmarks LLP27/11/2025
SM12500216Ram GawaliGokhale Landmarks LLP27/11/2025
SM12500227Ram GawaliGokhale Landmarks LLP27/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jan 2028

Documents filed158

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 158 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: SIGNED GBB PH II -Form1-31-3-26.pdf28 Jul 2026
Withdrawal Update Form 1File: GBB PH II - Form 1 - 30-6-26.pdf28 Jul 2026
Withdrawal Update Form 2File: GBB PH2 -FORM 2- 31-3-26 (1).pdf28 Jul 2026
Withdrawal Update Form 2File: GBB PH 2 - Form 2- 30-06-26.pdf28 Jul 2026
Withdrawal Update Form 3File: GBB 7 Form 3 31032026.pdf28 Jul 2026
Withdrawal Update Form 3File: GBB 7 Form 3 30062026.pdf28 Jul 2026
Layout approvalFile: 1-14 Compressed_20-11-25.pdf4 Mar 2026
Building plan approvalFile: 2-14 20-11-25.pdf4 Mar 2026
Building plan approvalFile: 3-14 20-11-25.pdf4 Mar 2026
Layout approvalFile: 4-14 20-11-25.pdf4 Mar 2026
Building plan approvalFile: 5-14 20-11-25.pdf4 Mar 2026
Building plan approvalFile: 6-14 20-11-25.pdf4 Mar 2026
Building plan approvalFile: 7-14 20-11-25.pdf4 Mar 2026
Building plan approvalFile: 8-14 20-11-25.pdf4 Mar 2026
Building plan approvalFile: 9-14 20-11-25.pdf4 Mar 2026
Building plan approvalFile: 10-14 20-11-25.pdf4 Mar 2026
Building plan approvalFile: 11-14 20-11-25.pdf4 Mar 2026
Building plan approvalFile: 12-14 20-11-25.pdf4 Mar 2026
Building plan approvalFile: 13-14 20-11-25.pdf4 Mar 2026
Building plan approvalFile: 14-14 20-11-25.pdf4 Mar 2026
Layout approvalFile: 1 Layout_Highlighted 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 2 Elevation 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 3 First Basement Floor Plan 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 4 Second Basement floor Plan 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 5 Third basement floor plan 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 6 Stilt Floor Plan 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 7 2nd 3rd and fourth floor plan 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 8 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 9 First Floor 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 10 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 11 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 12 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 13 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 14 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 15 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 16 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 17 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 18 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 19 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 20 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 21 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 22 4-2-26.pdf4 Mar 2026
Building plan approvalFile: 23 4-2-26.pdf4 Mar 2026
Withdrawal Update Form 1File: GBB PH2- Form1 - 31-12-25.pdf9 Feb 2026
Withdrawal Update Form 1File: GBB PH2- Form1 - 31-12-25.pdf9 Feb 2026
Withdrawal Update Form 1File: GBB PH2- Form1 - 31-12-25.pdf9 Feb 2026
Withdrawal Update Form 2File: GBB PH2- Form 2- 31-12-25.pdf9 Feb 2026
Withdrawal Update Form 2File: GBB PH2- Form 2- 31-12-25.pdf9 Feb 2026
Withdrawal Update Form 2File: GBB PH2- Form 2- 31-12-25.pdf9 Feb 2026
Withdrawal Update Form 3File: GBB 7 Form 31122025.pdf9 Feb 2026
Withdrawal Update Form 3File: GBB 7 Form 31122025.pdf9 Feb 2026
Withdrawal Update Form 3File: GBB 7 Form 31122025.pdf9 Feb 2026
Form 1File: Sep 2025.pdf29 Oct 2025
Form 2File: Sep 2025.pdf29 Oct 2025
Form 3File: Sep 2025.pdf29 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sep 2025.pdf29 Oct 2025
Form 2A (FY 2022-2023)File: FY 22-23.pdf29 Oct 2025
Form 2A (FY 2023-2024)File: FY 23-24.pdf29 Oct 2025
Form 2A (FY 2024-2025)File: FY 24-25.pdf29 Oct 2025
Form 5 (FY 2022-2023)File: FY 22-23.pdf29 Oct 2025
Form 5 (FY 2023-2024)File: FY 23-24.pdf29 Oct 2025
Form 5 (FY 2024-2025)File: FY 24-25.pdf29 Oct 2025
Form 1File: Form 1 - 30062022.PDF23 Aug 2025
Form 2File: Form 2 - GBB A7 - 30062022.PDF23 Aug 2025
Form 3File: SIGNED GBB 7 - Form 3 - 30-06-2022.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Signed Inventory Sold Unsold 30-06-2022.pdf23 Aug 2025
Form 1File: Form 1 - 30092022.PDF23 Aug 2025
Form 2File: Form 2 - GBB A7 - 30092022.PDF23 Aug 2025
Form 3File: SIGNED GBB 7 - Form 3 - 30-09-2022.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Singed Inventory Sold Unsold 30092022.pdf23 Aug 2025
Form 1File: Form 1 - 31122022.PDF23 Aug 2025
Form 2File: Form 2 - GBB A7 - 31-12-2022.PDF23 Aug 2025
Form 3File: SIGNED GBB 7 - Form 3 - 31-12-2022.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Signed Inventory Sold Unsold 31-12-2022.pdf23 Aug 2025
Form 1File: Form 1_GBB A7_30062024.pdf23 Aug 2025
Form 2File: Form 2 - GBB A7 - 30062024.PDF23 Aug 2025
Form 3File: SIGNED GBB 7 - Form 3 - 30062024.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Signed Inventory Sold Unsold 30062024.pdf23 Aug 2025
Form 1File: Form 1_GBB A7_30092024.pdf23 Aug 2025
Form 2File: Form 2 - GBB A7 - 30092024.pdf23 Aug 2025

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Gokhale Business Bay Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kothrud13,700+ in Pune

Builder: Gokhale Landmarks LLP

Gokhale Landmarks LLP has 3 registrations on MahaRERA, including Gokhale Business Bay and Gokhale Business Bay Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Gokhale Business Bay Phase II is delayed beyond 31 Jan 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gokhale Business Bay Phase II?

The registered promoter entity is Gokhale Landmarks LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gokhale Business Bay Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Gokhale Business Bay Phase II?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Gokhale Business Bay Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gokhale Business Bay Phase II?

The professionals named in the filing: Architect: Ar Siddarth Harischandrakar; Architect: Mangesh Gotal; Engineer: Vijendra Gaikwad; Engineer: Mahesh Mate; Engineer: CHINMAY KARAMBELKAR; Chartered Accountant: Shantanu G & Associate. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gokhale Business Bay Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gokhale Business Bay Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gokhale Business Bay Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.