Home / Browse projects / Pune, Maharashtra / Gokhale Business Bay

Completed No litigation declared Commercial project

Gokhale Business Bay

By Gokhale Landmarks LLP

RG-MH-04768 · RERA P52100020518 · Last updated on MahaRERA portal: 27 Jun 2025

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
3Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

Gokhale Business Bay is a Commercial project by Gokhale Landmarks LLP in Pune, Maharashtra, registered with MahaRERA as P52100020518 on 18 Apr 2019. The registration is recorded completed; possession was promised by 30 Mar 2025. 3 complaints are on record with the regulator.

At a glance

Project

  • NameGokhale Business Bay
  • TypeCommercial
  • Location
    • Off Karve Road
    • Opp City Pride Kothrud
    • Kothrud
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100020518
  • ReraGenie IDRG-MH-04768

Builder

  • NameGokhale Landmarks LLP
  • Entity typePartnership
  • GSTIN27AASFG7681F1ZT
  • PartnersPoonam Vishal Gokhale, Vishal Vasant Gokhale
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredApr 2019PromisedMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Apr 2019
  • Promised completion30 Mar 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed109 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Gokhale Business BayNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Gokhale Business Bay: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed200

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots200
Closed/Covered200

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,491 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI11136.0
Proposed, not sanctioned11,136 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchINFOTECH House Plot No 57, Mayur Colony, Kothrud, Pune

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSiddharth Harishchandrakar
ArchitectMangesh Gotal
EngineerPrashant Kulkarni
EngineerMahesh Mate
Chartered AccountantCA SIDDHARTH SATCHIDANAND SMART
PartnerRole in project
Gokhale Landmarks LLP-

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
SM12500197Ram GawaliGokhale Landmarks LLP26/11/2025
SM12500211Ram GawaliGokhale Landmarks LLP27/11/2025
SM12500225Ram GawaliGokhale Landmarks LLP27/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Mar 2025

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form 1 - GBB A6 - 30 06 2024.pdf27 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - GBB A6 - 30 09 2024.pdf27 Jun 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 GBB A6 30062024.pdf25 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_GBB A6_30092024.pdf25 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_GBB A6_30092024.pdf25 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_GBB A6_31122024.pdf25 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 GBB A6 21032025 completion.pdf25 Mar 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: GBB Tower A Full 21032025.pdf25 Mar 2025
Disclosure of sold/ booked inventoryFile: GBB A6 Sold Unsold 30092024.pdf11 Jan 2025
Certificates of CA (Form 3)File: Form 3_ Nayana 31032023.PDF3 Jan 2025
Disclosure of sold/ booked inventoryFile: GBB Sold Unsold 300624 Signed ok.pdf3 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 6 GBB Showroom Part 130423.pdf17 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: GBB Tower A Part 23102024.pdf17 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 6 GBB Showroom Part 130423.pdf17 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: GBB Tower A Part 23102024.pdf17 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: GBB A6.pdf30 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - GBB A6 30 06 2024.PDF19 Jul 2024
Layout approvalFile: layout - GBB.pdf4 Jul 2024
Copy of Layout Approval (in case of layout)File: layout - GBB.pdf4 Jul 2024
Declaration in FORM BFile: form b GBB.pdf18 May 2024
Certificates of CA (Form 3)File: GBB A6 Form 3 - Signed.pdf18 May 2024
Details of encumbrances concerned to FinanceFile: Index II (1).pdf10 May 2024
Details of encumbrances concerned to FinanceFile: ABFL 42 Index.pdf10 May 2024
Details of encumbrances concerned to LegalFile: Index II (1).pdf10 May 2024
Details of encumbrances concerned to LegalFile: ABFL 42 Index.pdf10 May 2024
CERSAI detailsFile: CERCAI Declaration - GBB.pdf10 May 2024
CERSAI detailsFile: CERSAI_Search_Report_200306073920_For_Asset_Based_Search_08_05_2024_13_31_47_476.pdf10 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GBB 2A 21-22 - Signed.pdf3 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GBB 2A 23-24 Signed.pdf3 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GBB 2A 22-23 - Signed.pdf3 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 GBB A6 31 03 2024.PDF30 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 GBB A6 31 03 2024.pdf26 Apr 2024
Certificates of CA (Form 3)File: Form 3 GBB A6 30 06 2023.pdf1 Apr 2024
Certificates of CA (Form 3)File: Form 3 GBB A6 30 09 2023.pdf1 Apr 2024
Certificates of CA (Form 3)File: Form 3 GBB A6 31 12 2023.pdf1 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: GBB - 2A - 20-21.PDF7 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: GBB - 2A - 21-22.PDF7 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GBB - 2A - 22-23.PDF7 Mar 2024
Certificates of CA (Form 3)File: Form 3 - GBB A6 - Mar 23 - Signed.pdf5 Mar 2024
Certificates of CA (Form 3)File: Form 3 - GBB A6 - Mar 23 - Signed.pdf4 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - GBB A6 31 03 2020.pdf20 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - GBB A6 31 12 2021.pdf20 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - GBB A6 31 03 2022.pdf20 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - GBB A6 30 06 2022.pdf20 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - GBB A6 30 09 2022.pdf20 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - GBB A6 31 12 2022.pdf20 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - GBB A6 31 03 2023.pdf20 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - GBB A6 30 06 2023.pdf20 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - GBB A6 30 09 2023.pdf20 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - GBB A6 31 12 2023.pdf20 Feb 2024
Disclosure of sold/ booked inventoryFile: Tower A Sold Unsold 30 06 23 - Signed.pdf19 Feb 2024
Disclosure of sold/ booked inventoryFile: Tower A Sold Unsold 30 09 23 - Signed.pdf19 Feb 2024
Disclosure of sold/ booked inventoryFile: Tower A Sold Unsold 31 12 23 - Signed.pdf19 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - GBB A6 - 31 03 2020.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - GBB A6 - 31 03 2021.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - GBB A6 - 31 12 2021.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - GBB A6 - 31 03 2022.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - GBB A6 - 30 06 2022.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - GBB A6 - 30 09 2022.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - GBB A6 - 31 12 2022.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - GBB A6 - 30 06 2023.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - GBB A6 - 30 09 2023.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - GBB A6 - 31 12 2023.pdf12 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 Architect Certificate A6 GBB 31-03-2023.pdf27 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate GBB A6 31-03-2023.pdf27 Jun 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrance - STCI-GBB A6.pdf15 Jun 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrance - STCI-GBB A6.pdf15 Jun 2023
Details of encumbrancesFile: Encumbrance Letter_GBB.pdf3 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GBB 6 SIGNED.pdf30 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate 2020.PDF13 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate 2021.PDF13 Sep 2022
Building plan approvalFile: Scan_2223-01_compressed.pdf12 Feb 2022
Building Plan Approval (IOD)File: Scan_2223-01_compressed.pdf12 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: GBB CC revised amalgamation_compressed.pdf8 Feb 2022
Building plan approvalFile: Scan_0161-01_compressed (1).pdf30 Sep 2021
Building Plan Approval (IOD)File: Scan_0161-01_compressed (1).pdf30 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: Revised CC_compressed (1).pdf30 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: GBB.pdf30 Sep 2021
Building plan approvalFile: Scan_0161-01_compressed.pdf7 Sep 2021
Building Plan Approval (IOD)File: Scan_0161-01_compressed.pdf7 Sep 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Gokhale Business Bay on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Opp City Pride Kothrud13,700+ in Pune

2 kmGokhale Business BayCompleted 115Lapsed / revoked 117Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: Gokhale Landmarks LLP

Gokhale Landmarks LLP has 3 registrations on MahaRERA, including Gokhale Business Bay and Gokhale Business Bay Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Gokhale Business Bay is delayed beyond 30 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Gokhale Business Bay?

The registered promoter entity is Gokhale Landmarks LLP, a partnership as per the filing. Its GSTIN 27AASFG7681F1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Gokhale Business Bay?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Gokhale Business Bay?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Gokhale Business Bay?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Gokhale Business Bay?

The professionals named in the filing: Architect: Siddharth Harishchandrakar; Architect: Mangesh Gotal; Engineer: Prashant Kulkarni; Engineer: Mahesh Mate; Chartered Accountant: CA SIDDHARTH SATCHIDANAND SMART. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Gokhale Business Bay?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Gokhale Business Bay. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Gokhale Business Bay to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.