Home / Browse projects / Raigarh, Maharashtra / Godrej Woodside Estate Phase 2

Completed No litigation declared Plotted project

Godrej Woodside Estate Phase 2

By Godrej Projects Development Limited

RG-MH-18609 · RERA P52000077385 · Last updated on MahaRERA portal: 19 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedregistration recorded completed
27 of 27Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

Godrej Woodside Estate Phase 2 is a Plotted project by Godrej Projects Development Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000077385 on 13 Aug 2024. The registration is recorded completed; possession was promised by 31 Mar 2028. 0 of the 27 units on this registration are recorded sold or booked.

At a glance

Project

  • NameGodrej Woodside Estate Phase 2
  • TypePlotted
  • Location
    • Karjat - Khopoli Marg
    • Khalapur
    • Navandhe
    • Raigarh
    • 410202
  • Pincode410202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000077385
  • ReraGenie IDRG-MH-18609

Builder

  • NameGodrej Projects Development Limited
  • Entity typeCompany
  • DirectorPriyamvada Navet
  • Other registrations5 more →
  • Completed5 of 6
  • Declared earlier projects16 →

Key dates

this monthRegisteredAug 2024PromisedMar 2028Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on13 Aug 2024
  • Promised completion31 Mar 2028
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed64 files

Current status

0%0 of 27 units booked

Figures as on 19 Jun 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area20,380 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMSRDC
Permissible FSI19646.48

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch12-A, Mittal Tower , Nariman Point, Mumbai 400021

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR Design Architects
ArchitectAbhijit S Mohite
EngineerRajendra v Joshi
EngineerVINYASA CONSULTANTS
Chartered AccountantAKPJ & Associates Chartered Accountant
Chartered AccountantB S R & Co. LLP
PartnerRole in project
Godrej Projects Development Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 Mar 2026

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Godrej Woodside Estate Phase 2.pdf19 Jun 2026
Completion CertificateFile: Woodside Completion RERA.pdf9 Mar 2026
Form 1File: Form 1 - Woodside Estate Phase 2 31 Dec 25..pdf19 Jan 2026
Form 2File: FORM 2 - GODREJ WOODSIDE ESTATE_PHASE2_CERTIFICATE DEC 25 - Final.pdf19 Jan 2026
Form 3File: Form 3 - Phase 2 RERA December.pdf19 Jan 2026
Disclosure of Sold and Booked InventoryFile: Khalapur Ph2 sold unsold dec 2025.pdf19 Jan 2026
Form 1File: Form 1 Khalapur PH 2 Architects Certificate.pdf18 Oct 2025
Form 2File: Form 2 GODREJ WOODSIDE ESTATE_PHASE2_CERTIFICATE SEPT'25 - Final.pdf18 Oct 2025
Form 3File: Form 3 Khalapur Ph 2 Sept 2025.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: Khalapur Ph2 Sold Unsold.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: Khalapur Phase II Form 5.pdf28 Aug 2025
Form 1File: Form 1 Khalapur Ph2 Architect's Certificate.pdf19 Jul 2025
Form 2File: Form 2 Khalapur Ph2 Engineer's Certificate.pdf19 Jul 2025
Form 3File: Form 3 Khalapur Ph2 RERA CA Cert.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Woodside Ph2 Sold Unsold Final.pdf19 Jul 2025
Form 2A (FY 2024-2025)File: Woodside Estate Phase 2 _ Quality Assurance Certificate FY 25.pdf18 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Woodside Estate Phase 2 31 March 25.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 310325.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ WOODSIDE ESTATE_PHASE2_CERTIFICATE 31ST MAR'25.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - BOOKED INVENTORY PHASE 2- GWS.pdf16 Apr 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: ph2.pdf3 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold unsold Phase-2.pdf2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Woodside Estate Phase 2 Dec 24.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE PHASE 2_compressed.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: GODREJ WOODSIDE ESTATE_PHASE2_CERTIFICATE DEC'24 - Final.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Woodside 2 Sold unsold_Sept 2024.pdf21 Jan 2025
Details of encumbrances concerned to FinanceFile: NON ENCUMBRANCE DECLARATION FOR FINANCIAL ENCUMBRANCES PHASE 2.pdf13 Aug 2024
Details of encumbrances concerned to LegalFile: NON ENCUMBRANCE DECLARATION FOR FINANCIAL ENCUMBRANCES PHASE 2.pdf13 Aug 2024
Declaration about Commencement CertificateFile: CC.pdf13 Aug 2024
CERSAI detailsFile: CERSAI Declaration and Report.pdf13 Aug 2024
Other - TechnicalFile: Index 2.pdf13 Aug 2024
Other - TechnicalFile: Layout.pdf13 Aug 2024
Other - TechnicalFile: Index 2 copy.pdf13 Aug 2024
Layout approvalFile: Layout Plot B.pdf10 Aug 2024
Building plan approval or NA orderFile: Plot B Final layout Letter.pdf10 Aug 2024
PAN CardFile: GPDL PAN Card.pdf10 Aug 2024
Copy of the legal title reportFile: RERA Title Report - Phase II (with annexures)_compressed-1-90.pdf10 Aug 2024
Copy of the legal title reportFile: RERA Title Report - Phase II (with annexures)_compressed-91-265.pdf10 Aug 2024
Details of encumbrances concerned to FinanceFile: Non Encumbrance Legal Phase 2.pdf10 Aug 2024
Details of encumbrances concerned to LegalFile: Non Encumbrance Legal Phase 2.pdf10 Aug 2024
Copy of Layout Approval (in case of layout)File: Layout Plot B.pdf10 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Plot B Final layout Letter.pdf10 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Plot B Final layout Letter.pdf10 Aug 2024
Declaration in FORM BFile: Annexure 9 Form B- Phase 2.pdf10 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Woodside Estate Phase 2 Architect Certificate.pdf10 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure 11 Engineer Certificate Phase 2 Signed.pdf10 Aug 2024
Disclosure for secured/unsecured finance availed for the projectFile: Phase 2 Unsecure final with End use.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 2 Signed CA Certificate.pdf10 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Directors.pdf10 Aug 2024
Proforma of Allotment letterFile: Annexure 15 Proforma Allotment Letter Phase 2 2.pdf10 Aug 2024
Proforma of Agreement for saleFile: Annexure 16 Proforma Agreement for sale Phase 2.pdf10 Aug 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B- Opening of RERA Designated Bank Account Phase 2.pdf10 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Annexure 19 Format A - Declaration Bank Account Phase 2.pdf10 Aug 2024
Deviation Report with respect to Allotment letterFile: Deviation letter Allotment letter Phase 2.pdf10 Aug 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report Phase 2.pdf10 Aug 2024
Other - LegalFile: BR GPDL RERA Khalapur 9 8 2024.pdf10 Aug 2024
Other - LegalFile: Phase 2 Index 2 Declaration.pdf10 Aug 2024
Other - LegalFile: Annexure 31 Declaration-Cum-Undertaking (single layout) Phase 2 2.pdf10 Aug 2024
Other - FinanceFile: BR GPDL RERA Khalapur 9 8 2024.pdf10 Aug 2024
Other - FinanceFile: Phase 2 Index 2 Declaration.pdf10 Aug 2024
Other - FinanceFile: Annexure 31 Declaration-Cum-Undertaking (single layout) Phase 2 2.pdf10 Aug 2024
Other - TechnicalFile: BR GPDL RERA Khalapur 9 8 2024.pdf10 Aug 2024
Other - TechnicalFile: Phase 2 Index 2 Declaration.pdf10 Aug 2024
Other - TechnicalFile: Annexure 31 Declaration-Cum-Undertaking (single layout) Phase 2 2.pdf10 Aug 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Godrej Hillview EstateMDR 20 VILLAGE KHANAV TALUKA KHALAPUR VILLAGE RAIGAD-OngoingMar 2027Mar 2027
Godrej Country EstateMHASROLI KURNZE ROAD VILLAGE KURNZE TALUKA VIKRAMGAD DISTRICT PALGHAR-OngoingApr 2026Apr 2026
Godrej RKSSion Trombay Rd Dreamland Society Borla Union Park Chembur Mumbai Maharashtra 400071147CompletedDec 2024Mar 2023

How this compares with Raigarh

0%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Godrej Woodside Estate Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Khalapur5,900+ in Raigarh

Builder: Godrej Projects Development Limited

Godrej Projects Development Limited has 6 registrations on MahaRERA, including Godrej RKS and GODREJ COUNTRY ESTATE. Its filings disclose 16 earlier MahaRERA projects: declares 10 of 16 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Godrej Woodside Estate Phase 2 is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej Woodside Estate Phase 2?

The registered promoter entity is Godrej Projects Development Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej Woodside Estate Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Godrej Woodside Estate Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Godrej Woodside Estate Phase 2?

The professionals named in the filing: Architect: R Design Architects; Architect: Abhijit S Mohite; Engineer: Rajendra v Joshi; Engineer: VINYASA CONSULTANTS; Chartered Accountant: AKPJ & Associates Chartered Accountant; Chartered Accountant: B S R & Co. LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Godrej Woodside Estate Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej Woodside Estate Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej Woodside Estate Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.