Home / Browse projects / Mumbai Suburban, Maharashtra / Godrej Sky Terraces

Registered No litigation declared Residential / Group Housing project

Godrej Sky Terraces

By Godrej Properties Limited

RG-MH-07148 · RERA P51800053882 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 7 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 27 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 95%
7 of 76Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 165 documents Report an error

Godrej Sky Terraces is a Residential / Group Housing project by Godrej Properties Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800053882 on 8 Dec 2023. Possession is promised by 25 Mar 2029. 69 of the 76 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameGodrej Sky Terraces
  • TypeResidential / Group Housing
  • Location
    • Deonar Farm Road
    • Chembur Deonar
    • Deonar
    • Kurla
    • Mumbai Suburban
    • 400088
  • Pincode400088
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800053882
  • ReraGenie IDRG-MH-07148

Builder

  • NameGodrej Properties Limited
  • Entity typeCompany
  • Managing DirectorGaurav Pandey
  • Other registrations27 more →
  • Completed5 of 28
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects35 →

Key dates

this monthRegisteredDec 2023PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Dec 2023
  • Promised completion25 Mar 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed165 files

Current status

91%69 of 76 units booked
38.8%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Godrej Sky TerracesNA232176076

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.

Godrej Sky Terraces: 50% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks5%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed199

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots199
Closed/Covered199

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,266 sq m
Land owned byThe promoter
Named landownersNone
Declared on30 Sep 2024

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI12996.15
Proposed, not sanctioned8,788 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAXIS BANK LTD MUMBAI FORT MH UNIVERSAL INSURANCE BL SIR P M ROAD FORT 400001, MUMBAI MAHARASHTRA IN
Estimated costRs 164.78 cr
Cost incurredRs 64.01 cr
Work done38.84%
BuildingWingEstimatedIncurred
Godrej Sky TerracesNARs 156.05 crRs 63.30 cr
-NARs 8.73 crRs 71.00 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR Design Architects
EngineerSamartha Constro Consultants LLP
EngineerRajendra Joshi
EngineerVinyasa Consultants
Chartered AccountantB S R & Co. LLP
Chartered AccountantBSR and Co. LLP ( 101248W/W-100022)
Chartered AccountantAKPJ & Associates
PartnerRole in project
Godrej Properties Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jul 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 25 Mar 2029

Documents filed165

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 165 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement certificateFile: 2515887_FurtherCC_signed.pdf16 Jul 2026
Withdrawal Update Form 1File: Form 1 - Q1 FY27 - Godrej Sky Terraces - signed.pdf16 Jul 2026
Withdrawal Update Form 2File: Form 2 Q1 FY27 Signed.pdf16 Jul 2026
Withdrawal Update Form 3File: Form 3 - Q1 FY27 - Godrej Sky Terraces - Signed.pdf16 Jul 2026
Form 2A (FY 2025-2026)File: Godrej_Sky_Terraces_Form 2A_FY26_Signed.pdf18 Jun 2026
Commencement certificateFile: 2515887_FurtherCC_signed.pdf15 Apr 2026
Withdrawal Update Form 1File: Form 1 Q4 FY26 Signed.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2 Q4 FY26 Signed.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3 Q4 FY26 Signed.pdf15 Apr 2026
Withdrawal Update Form 1File: Form 1 Q3 FY26 Signed.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 Q3 FY26 Signed.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 Q3 FY26 Signed.pdf20 Jan 2026
Withdrawal Update Form 1File: Q2 FY26 Form 1 Arch Cert Signed.pdf17 Oct 2025
Withdrawal Update Form 2File: Q2 FY26 - Form 2 - Godrej ST Signed - Engineers Cert..pdf17 Oct 2025
Withdrawal Update Form 3File: Q2 FY26 - Form 3 - Godrej ST - CA Cert signed.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: RKB Final -Form 5 -FY25_compressed.pdf29 Aug 2025
Form 1File: Q1 FY26 Form 1 Arch Cert Signed.pdf20 Jul 2025
Form 2File: Q1 FY26 - Form 2 - Godrej ST Signed - Engineers Cert.pdf20 Jul 2025
Form 3File: Q1 FY26 - Form 3 - Godrej ST - CA Cert signed.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Q1 FY26 - Sold Unsold Disclosure Signed.pdf20 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A - Godrej Sky Terraces- Signed FY24-25.pdf4 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Q4 FY25 Signed.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cert Q4 FY25 _signed_.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Cert Q4 FY25 Signed.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Signed - Q3 FY25.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Signed - Q3 FY25.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Signed - Q3 FY25.pdf22 Jan 2025
Building plan approvalFile: IOD Page 1.pdf11 Nov 2024
Building plan approvalFile: IOD Page 2.pdf11 Nov 2024
Building plan approvalFile: IOD Page 3.pdf11 Nov 2024
Building plan approvalFile: IOD Page 4.pdf11 Nov 2024
Building plan approvalFile: IOD Page 5.pdf11 Nov 2024
Building plan approvalFile: IOD Page 6.pdf11 Nov 2024
Building plan approvalFile: IOD Page 7.pdf11 Nov 2024
Building plan approvalFile: IOD Page 8.pdf11 Nov 2024
Building plan approvalFile: IOD Page 9.pdf11 Nov 2024
Building plan approvalFile: IOD Page 10.pdf11 Nov 2024
Building plan approvalFile: IOD Page 11.pdf11 Nov 2024
Building plan approvalFile: IOD Page 1.pdf11 Nov 2024
Building plan approvalFile: IOD Page 2.pdf11 Nov 2024
Building plan approvalFile: IOD Page 3.pdf11 Nov 2024
Building plan approvalFile: IOD Page 4.pdf11 Nov 2024
Building plan approvalFile: IOD Page 5.pdf11 Nov 2024
Building plan approvalFile: IOD Page 6.pdf11 Nov 2024
Building plan approvalFile: IOD Page 7.pdf11 Nov 2024
Building plan approvalFile: IOD Page 8.pdf11 Nov 2024
Building plan approvalFile: IOD Page 9.pdf11 Nov 2024
Building plan approvalFile: IOD Page 10.pdf11 Nov 2024
Building plan approvalFile: IOD Page 11.pdf11 Nov 2024
Building plan approvalFile: IOD Page 1.pdf11 Nov 2024
Building plan approvalFile: IOD Page 2.pdf11 Nov 2024
Building plan approvalFile: IOD Page 3.pdf11 Nov 2024
Building plan approvalFile: IOD Page 4.pdf11 Nov 2024
Building plan approvalFile: IOD Page 5.pdf11 Nov 2024
Building plan approvalFile: IOD Page 6.pdf11 Nov 2024
Building plan approvalFile: IOD Page 7.pdf11 Nov 2024
Building plan approvalFile: IOD Page 8.pdf11 Nov 2024
Building plan approvalFile: IOD Page 9.pdf11 Nov 2024
Building plan approvalFile: IOD Page 10.pdf11 Nov 2024
Building plan approvalFile: IOD Page 11.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 1.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 2.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 3.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 4.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 5.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 6.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 7.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 8.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 9.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 10.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 11.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 1.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 2.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 3.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 4.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 5.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 6.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 7.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 8.pdf11 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD Page 9.pdf11 Nov 2024

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

7 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Godrej Ascend Phase 3Village Thane M Crop Taluka Thane Dist Thane497OngoingOct 2029Oct 2029
Godrej Ascend Phase 2Village Thane M Crop Taluka Thane Dist Thane198OngoingDec 2028Dec 2028
Godrej Ascend Phase 1Village Thane M Crop Taluka Thane Dist Thane654OngoingApr 2028Apr 2028
Godrej Emerald WatersVillage Pimpri Chinchwad M Crop Taluka Haveli District Pune139OngoingMar 2028Mar 2028
Godrej Riviera Phase 1Taluka Kalyan Dist Thane942OngoingDec 2026Dec 2026
Godrej Urban ParkVillage Kurla Taluka Kurla Dist Mumbai Suburban579OngoingSep 2026Sep 2026
Godrej Orchard EstateVillage Besa Ghogli Road District Nagpur PIN 440034 Maharashtra-OngoingDec 2024Dec 2024

How this compares with Mumbai Suburban

91%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Godrej Sky Terraces on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chembur Deonar6,700+ in Mumbai Suburban

Builder: Godrej Properties Limited

Godrej Properties Limited has 28 registrations on MahaRERA, including The Trees, Residential Phase 1 and Godrej Anandam. Its filings disclose 35 earlier MahaRERA projects: declares 28 of 30 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Godrej Sky Terraces is delayed beyond 25 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej Sky Terraces?

The registered promoter entity is Godrej Properties Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej Sky Terraces?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Godrej Sky Terraces?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Godrej Sky Terraces?

The professionals named in the filing: Architect: R Design Architects; Engineer: Samartha Constro Consultants LLP; Engineer: Rajendra Joshi; Engineer: Vinyasa Consultants; Chartered Accountant: B S R & Co. LLP; Chartered Accountant: BSR and Co. LLP ( 101248W/W-100022). Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Godrej Sky Terraces?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej Sky Terraces. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej Sky Terraces to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.