ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Godrej Hill Retreat 2

Registered Litigation declared Others project

Godrej Hill Retreat 2

By MAHALUNGE TOWNSHIP DEVELOPERS PRIVATE LIMITED

RG-MH-44687 · RERA P52100049435 · Last updated on MahaRERA portal: 6 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 5 cases
  • 4 complaints at MahaRERA
  • Rs 321.00 crore secured on the land, in favour of ICICI Bank Limited

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
7 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 53%
6 of 575Units unsoldnot recorded sold or booked
4Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

Godrej Hill Retreat 2 is a Others project by MAHALUNGE TOWNSHIP DEVELOPERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100049435 on 14 Feb 2023. Possession is promised by 28 Mar 2027. 569 of the 575 units on this registration are recorded sold or booked, and 7 of 22 construction stages are filed complete. 4 complaints are on record with the regulator.

At a glance

Project

  • NameGodrej Hill Retreat 2
  • TypeOthers
  • Location
    • MDR Road
    • Mahalunge
    • Mulshi
    • Pune
    • 411045
  • Pincode411045
  • RERA no.P52100049435
  • ReraGenie IDRG-MH-44687

Builder

  • NameMAHALUNGE TOWNSHIP DEVELOPERS PRIVATE LIMITED
  • Entity typeOthers
  • GSTIN27AAUCM0614K1Z5
  • PartnersMahalunge Land Developers Private Limited NA, Godrej Properties Limited NA
  • Other registrations7 more →
  • Completed1 of 8
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

this monthRegisteredFeb 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Feb 2023
  • Promised completion28 Mar 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed103 files

Current status

99%569 of 575 units booked
50.4%Work done, per cost certificate

Figures as on 6 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower B-04NA363330210312
Tower B-05NA36332558263

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 53%.

Tower B-0438%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure53%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks19%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.19%
Tower B-0545%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks32%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.26%

Progress on shared amenities15

As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes40%
Landscaping & Tree PlantingYes60%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes30%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,081 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofICICI Bank Limited
Secured amountRs 321.00 crore
CERSAI search filedYes
Declared on19 Jan 2026

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority (PMRDA)
Permissible FSI39273.56
Proposed, not sanctioned39,274 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchThe Address commercia, near hotel Sayaji, Wakad Pune
Estimated costRs 216
Cost incurredRs 109
Work done50.43%
BuildingWingEstimatedIncurred
Tower B-05NARs 111Rs 57
Tower B-04NARs 99Rs 48
-NARs 6Rs 4

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANA Consortium Pvt Ltd
EngineerSamarth Constro Consultants LLP
EngineerAshish Marathe
Chartered AccountantBSR & Co. LLP
Chartered AccountantMD Deshpande and CO
PartnerRole in project
MAHALUNGE TOWNSHIP DEVELOPERS PRIVATE LIMITED-

Litigation declared5

CaseCourtStatus
822/2008Civil Judge Junior DivisionClosed
1233/2014Civil Judge Junior DivisionOngoing
170/2021Civil Judge Junior DivisionOngoing
RCS - 170/2021/2021Pune District & Sessions CourtOngoing
RCA - 601/2014/2014Pune District & Sessions CourtOngoing

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC12501968Gaurav Kumar VermaMAHALUNGE TOWNSHIP DEVELOPERS LLP16/06/2025
CC12400984Dipali Ravindrakumar DhanwateMAHALUNGE TOWNSHIP DEVELOPERS LLP03/12/2024
CC12500492Adv Mahesh Dinanath PawarMAHALUNGE TOWNSHIP DEVELOPERS LLP14/02/2025
CC12603516Prashant Roy GhatakMAHALUNGE TOWNSHIP DEVELOPERS PRIVATE LIMITED07/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Mar 2027

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: R7 B2_RERA FORM-1_22-04-2026.pdf6 Jul 2026
Withdrawal Update Form 2File: Form 2 R7B2.pdf6 Jul 2026
Withdrawal Update Form 3File: R7B2.pdf6 Jul 2026
Form 2A (FY 2025-2026)File: R7B2.pdf15 May 2026
Withdrawal Update Form 1File: R7 B2_RERA FORM-1_22-04-2026.pdf22 Apr 2026
Withdrawal Update Form 2File: Form 2 R7B2.pdf22 Apr 2026
Withdrawal Update Form 3File: R7B2.pdf22 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A Hill Retreat 2.pdf23 Mar 2026
Withdrawal Update Form 1File: Form 1 - HR2.pdf26 Feb 2026
Withdrawal Update Form 2File: Form 2 - Hill Retreat 2.pdf26 Feb 2026
Withdrawal Update Form 3File: Form 3 - Hill Retreat 2 - Q3FY26.pdf26 Feb 2026
Withdrawal Update Form 1File: Form 1 - HR2.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2 - Hill Retreat 2.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3 - Hill Retreat 2 - Q3FY26.pdf19 Jan 2026
Form 1File: R-07 B2_Rera Form-1_14-10-2025.pdf17 Oct 2025
Form 2File: Form 2_Hill Retreat 2 Q2'26.pdf17 Oct 2025
Form 3File: Form 3_MDD_RERA Hill Retreat Phase-2_30th Sept__25_Signed.pdf17 Oct 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure_R7B2_Q2 FY 26.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: Retreat - 2.pdf26 Aug 2025
Form 1File: R-07 B2_Rera Form -1_21-07-2025.pdf22 Jul 2025
Form 2File: Form 2_Q1_FY 26_Hill Retreat 2.pdf22 Jul 2025
Form 3File: Signed_MDD_RERA Hill Retreat Phase-2_June_25.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure_Q1_FY26_Hill Retreat 2.pdf22 Jul 2025
Form 1File: R-07_B2_Rera Form-1.pdf27 Jun 2025
Form 2File: Form 2 - HR2.pdf27 Jun 2025
Form 3File: Signed_MDD_RERA Hill Retreat Phase 2 Mar_25.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure_Godrej Hill Retreat 2.pdf27 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: R-07_B2_Rera Form-1.pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Hill Retreat 2.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_MDD_RERA Hill Retreat Phase 2 Mar_25.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - HR2.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory Disclosure_Godrej Hill Retreat 2.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Hill Retreat 2 _ Form 1 _ Q3 FY25.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _ Hill Retreat 2 _ Q3 FY25.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Hill Retreat 2 _ Form 2 _ Q3 FY25.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: Godrej Hill Retreat 2 _ Inventory Data _ Q3 FY25.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Hill Retreat 2.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Hill Retreat 2.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: Godrej Hill Retreat 2.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Hill Retreat 2.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Hill Retreat 2.pdf14 Oct 2024
Form 5 (FY 2023-2024)File: Hill Retreat 2.pdf29 Sep 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Hill Retreat 2.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 240630 - RERA Certificate (Form 1) - R7B2.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA_Jun-24_R7B2.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: Godrej Hill Retreat 2.pdf13 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Hillretreat-2 R7B2 - Form 2A.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: Godrej Hill Retreat 2.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mahalunge _ Hill Retreat 2.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahalunge _ Hill Retreat 2.pdf17 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Mahalunge_Hill Retreat 2_Form 3.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 231231 - RERA Certificate - Hillretreat 2.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA engineer's certificate_R7B2 Hill Retreat 2_Dec-23.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: Inventory Data _ Godej Hill Retreat 2 _ Q3 FY24_11zon.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Godrej Hill Retreat 2.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 230930 RERA Certificate-R7B2_Hill Retreat 2.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Hill retreat 2.pdf17 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MDD_RERA Hill Retreat Phase 2_Signed.pdf17 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Godrej Hill Retreat II.pdf22 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Hill Retreat 2.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf13 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Certificate_Hillretreat_II_June23.pdf13 Jul 2023
Disclosure of sold/ booked inventoryFile: Godrej Hill Retreat 2_11zon.pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate.pdf17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Hillretreat02_RERA_ENGINEER_CERTIFICATE.pdf17 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Hillretreat_02_Quality_certificate_2023.pdf17 Apr 2023
Disclosure of sold/ booked inventoryFile: Godrej Hill Retreat 2_compressed.pdf17 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Hill Retreat II.pdf17 Apr 2023
Details of encumbrances concerned to FinanceFile: finance encumbrance.pdf16 Feb 2023
Details of encumbrances concerned to FinanceFile: Legal encumbrance.pdf16 Feb 2023
Details of encumbrances concerned to LegalFile: finance encumbrance.pdf16 Feb 2023
Details of encumbrances concerned to LegalFile: Legal encumbrance.pdf16 Feb 2023
Details of encumbrances concerned to FinanceFile: R03_ Details of Encumbrance Legal 8022023.pdf8 Feb 2023
Details of encumbrances concerned to LegalFile: R03_ Details of Encumbrance Legal 8022023.pdf8 Feb 2023
Other - LegalFile: Declaration - Rabi Kant Sharma_R01.pdf8 Feb 2023
Other - LegalFile: Form-4_M27652691 sd.pdf8 Feb 2023
Other - LegalFile: M27652691_Receipt.pdf8 Feb 2023
Copy of the legal title reportFile: RERA Title Report February 6 2023 issued.pdf6 Feb 2023
Proforma of Agreement for saleFile: Draft AFS_R7B2 06022023.pdf6 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report R7B2 06022023) FINAL_compressed.pdf6 Feb 2023

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Godrej Meadows Phase 2Pune488OngoingDec 2025Dec 2025
Godrej MeadowsPune876OngoingDec 2025Dec 2025
Godrej Hill RetreatPune747OngoingDec 2025Dec 2025
Godrej Green VistasPune743OngoingJun 2025Late, Jul 2025
Godrej Hillside 2Pune540OngoingOct 2024Oct 2024
Godrej Hillside 1Pune588OngoingOct 2024Oct 2024
Godrej Green CovePune712OngoingMar 2023Late, Mar 2025

How this compares with Pune

99%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Godrej Hill Retreat 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mahalunge13,700+ in Pune

Builder: MAHALUNGE TOWNSHIP DEVELOPERS PRIVATE LIMITED

Mahalunge Township Developers Private Limited has 8 registrations on MahaRERA, including Godrej Green Cove and Godrej Green Vistas. Its filings disclose 8 earlier MahaRERA projects: declares 5 of 7 past projects completed on time. Litigation is declared on 8 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Godrej Hill Retreat 2 is delayed beyond 28 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej Hill Retreat 2?

The registered promoter entity is MAHALUNGE TOWNSHIP DEVELOPERS PRIVATE LIMITED, an others as per the filing. Its GSTIN 27AAUCM0614K1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej Hill Retreat 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Godrej Hill Retreat 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Godrej Hill Retreat 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Godrej Hill Retreat 2?

The professionals named in the filing: Architect: ANA Consortium Pvt Ltd; Engineer: Samarth Constro Consultants LLP; Engineer: Ashish Marathe; Chartered Accountant: BSR & Co. LLP; Chartered Accountant: MD Deshpande and CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Godrej Hill Retreat 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej Hill Retreat 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej Hill Retreat 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.