Home / Browse projects / Pune, Maharashtra / Godrej Elements
Godrej Elements
By Pearlite Real Properties Private Limited
RG-MH-47524 · RERA P52100016626 · Last updated on MahaRERA portal: 5 Apr 2023
Source: official MahaRERA filing
Red flags
- 5 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Godrej Elements is a Residential / Group Housing project by Pearlite Real Properties Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100016626 on 25 May 2018. The registration is recorded completed; possession was promised by 30 Dec 2022. 5 complaints are on record with the regulator.
At a glance
Project
- NameGodrej Elements
- TypeResidential / Group Housing
- Location
- Godrej Elements
- Hinjavadi (CT)
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100016626
- ReraGenie IDRG-MH-47524
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on25 May 2018
- Promised completion30 Dec 2022
- Revised completionNone
- Buildings7 building records
- Documents filed60 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| H2 | NA | 19 | 0 | 0 | 0 | 0 |
| I3 | NA | 19 | 0 | 0 | 0 | 0 |
| K1 | NA | 21 | 0 | 0 | 0 | 0 |
| K2 | NA | 21 | 0 | 0 | 0 | 0 |
| J1 | NA | 21 | 0 | 0 | 0 | 0 |
| I4 | NA | 19 | 0 | 0 | 0 | 0 |
| I2 | NA | 19 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 5 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
70 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Stilt Floor, at 0%.
H291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
I391%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
K191%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
K291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
J191%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
I491%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
I291%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 5 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 0% |
| Others UGWT | Yes | 100% |
Parking filed2391
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| H2 | 250 | 21 | 271 |
| I3 | 252 | 21 | 273 |
| K1 | 428 | 22 | 450 |
| K2 | 523 | 21 | 544 |
| J1 | 338 | 21 | 359 |
| I4 | 239 | 21 | 260 |
| I2 | 213 | 21 | 234 |
Land and ownership3
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RR Megacity Builders Ltd | Mumbai City | Mumbai City |
| Godrej Properties Limited (as Development Manager) | Kurla | Mumbai Suburban |
| Pearlite Real Properties Private Limited | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Kapadia Associates Design LLP |
| Engineer | CBRE South Asia Pvt Ltd, |
| Chartered Accountant | M D Deshpande & Co. |
| Partner | Role in project |
|---|---|
| Pearlite Real Properties Private Limited | - |
Complaints filed with MahaRERA5
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000022083 | Hiten Suryakant Talati | Godrej properties ltd through Pearlite real properties pvt.ltd | 29/09/2018 |
| CC005000000064775 | Manish Joshi | Pearlite Real Properties Limited | 10/11/2020 |
| CC005000000085314 | Ashish Manohar Bhuskute and Prachi Ashish Bhuskute | Godrej Properties Limited through Pearlite Real Properties Pvt. Ltd. | 08/03/2021 |
| CC005000000106474 | Sunil Salunkhe | Rabikant Sharma | 11/01/2022 |
| CC005000000106485 | Pravin Ghule | Pearlite Real Properties Pvt. LTD. | 23/01/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 May 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 May 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 May 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 May 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 5 Apr 2023
Documents filed60
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 220310 FINAL COMPLETION WITH RECORD PLAN.pdf | 5 Apr 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4_Godrej Elements.pdf | 5 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ELEMENTS.pdf | 30 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of inventory (1).pdf | 21 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf | 14 Apr 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ARCHITECT CERTIFICATE.pdf | 14 Apr 2022 |
| Certificates of CA (Form 3)File: MDD_ Elements Rera Form 3 Q3 21-22 SignedD.pdf | 15 Mar 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Elements ARCHITECT CERTIFICATE 311221C.pdf | 15 Feb 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Elements Engineer Certificate 311221J.pdf | 15 Feb 2022 |
| Disclosure of sold/ booked inventoryFile: Godrej Elements All Towers 100222I.pdf | 15 Feb 2022 |
| Disclosure of sold/ booked inventoryFile: Elements Sep 21.pdf | 26 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SEPTEMBER 2021 - FORM 1 ARCHITECT CERTIFICATE GODREJ ELEMENTS.PDF | 8 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Elements Engg Certificate -September'21.pdf | 8 Oct 2021 |
| Certificates of CA (Form 3)File: MDD_Pearlite Elements -Sep 21 Signed.pdf | 8 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Godrej Elements_RERA certificate FY 20-21-1-8.pdf | 30 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Godrej Elements compressed.pdf | 15 Jul 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JUNE2021 FORM 1 ARCHITECT CERTIFICATE GODREJ ELEMENTS.PDF | 10 Jul 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Elements Engg Certificate June21.pdf | 10 Jul 2021 |
| Certificates of CA (Form 3)File: MDD Pearlite Elements June 21 signed.pdf | 10 Jul 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: ORIGINAL SOCIETY CERTIFICATE - Elements.pdf | 22 Jun 2021 |
| Disclosure of sold/ booked inventoryFile: Elements All Towers Final 220521 compressed opt.pdf | 25 May 2021 |
| Certificates of CA (Form 3)File: Pearlite Elements -Mar 21.pdf | 25 May 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 200320 OC Copy Page 1 to 4.pdf | 25 May 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 210420 Elemetns OC Certificate I2J1K1K2 compressed.pdf | 25 May 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20210521 FORM 1 ARCHITECT CERTIFICATE MAR 2021 GODREJ ELEMENTS.pdf | 23 May 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20210521FORM 1 ARCHITECT CERTIFICATE DEC 2020 GODREJ ELEMENTS.pdf | 23 May 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Elements Engg Certificate Monthly Certificate Dec20.pdf | 12 May 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Elements Engg Certificate Mar21.pdf | 12 May 2021 |
| Certificates of CA (Form 3)File: Pearlite Elements -Dec 2020 signed.pdf | 12 May 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Godrej Elements RERA Architect certificate_Sept 20.pdf | 12 Apr 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Elements Engg Certificate Monthly Certificate Sep20 compressed.pdf | 12 Apr 2021 |
| Certificates of CA (Form 3)File: Pearlite Elements -Sep 2020 signed.pdf | 12 Apr 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Godrej Elements Form revised uploaded.pdf | 1 Oct 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Godrej Elements Architect March20 uploaded.pdf | 9 Sep 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Godrej Elements Architect June20 uploaded.pdf | 9 Sep 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Elements Engineer June20 uploaded compressed.pdf | 9 Sep 2020 |
| Certificates of CA (Form 3)File: Elements June 20 CA signed uploaded.pdf | 9 Sep 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Elements Engg Certificate Mar20 upload.pdf | 7 Aug 2020 |
| Certificates of CA (Form 3)File: CA Certificate Mar20 Elements Upload.pdf | 7 Aug 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Elements Engg Certificate DEC 2019.pdf | 3 Apr 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Elements Arch Certificate September 30 2019 compressed.pdf | 24 Mar 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Elements Engg Certificate Sept 30 2019 compressed.pdf | 24 Mar 2020 |
| Certificates of CA (Form 3)File: Godrej Elements CA Sept 30 2019 1 to 3.pdf | 24 Mar 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ELEMENTS Engineer monthly certificate 31Dec2019.pdf | 23 Mar 2020 |
| Annual Audit Report of Statutory CA (Form 5)File: Godrej Elements Form 5.pdf | 30 Sep 2019 |
| Proforma of Allotment letterFile: Elements RERA doc- Copy.pdf | 20 Jun 2018 |
| Proforma of Allotment letterFile: Docs Elements.pdf | 7 Jun 2018 |
| OtherFile: Special Features of Godrej Elements.pdf | 26 May 2018 |
| Building plan approvalFile: CC 09 05 18.pdf | 18 May 2018 |
| Building Plan Approval (IOD)File: CC 09 05 18.pdf | 18 May 2018 |
| Certificates of CA (Form 3)File: CA Certificate 17518.pdf | 18 May 2018 |
| OtherFile: amenities.pdf | 17 May 2018 |
| Proforma of Allotment letterFile: AFS Godrej elements.pdf | 16 May 2018 |
| Layout approvalFile: Layout Com.pdf | 11 May 2018 |
| Copy of the legal title reportFile: Title Certificate.pdf | 11 May 2018 |
| Details of encumbrancesFile: No Encumbrance Certificate.pdf | 11 May 2018 |
| Copy of Layout Approval (in case of layout)File: Layout Com.pdf | 11 May 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 09 05 18.pdf | 11 May 2018 |
| Declaration in FORM BFile: doc35391920180511175923.pdf | 11 May 2018 |
| Declaration in FORM BFile: Form B new Pearlite.pdf | 11 May 2018 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Godrej 24 | Hinjewadi Taluka Mulshi District Pune | 816 | Completed | Sep 2021 | Sep 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 60 filed documents as one ZIP, foldered, with a manifest
Keep Godrej Elements on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Godrej Elements13,700+ in Pune
Filed coordinates, straight-line distance. 93 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: Pearlite Real Properties Private Limited
Pearlite Real Properties Private Limited has 2 registrations on MahaRERA, including Godrej 24 and Godrej Elements. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Godrej Elements is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Godrej Elements?
The registered promoter entity is Pearlite Real Properties Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Godrej Elements?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Godrej Elements?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Godrej Elements?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Godrej Elements?
The professionals named in the filing: Architect: Kapadia Associates Design LLP; Engineer: CBRE South Asia Pvt Ltd,; Chartered Accountant: M D Deshpande & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Godrej Elements?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback