Home / Browse projects / Pune, Maharashtra / Godrej Elements

Completed No litigation declared Residential / Group Housing project

Godrej Elements

By Pearlite Real Properties Private Limited

RG-MH-47524 · RERA P52100016626 · Last updated on MahaRERA portal: 5 Apr 2023

Source: official MahaRERA filing

Red flags

  • 5 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
70 of 77Construction stages doneacross 7 buildings; furthest along: Stilt Floor, 0%
5Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

Godrej Elements is a Residential / Group Housing project by Pearlite Real Properties Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100016626 on 25 May 2018. The registration is recorded completed; possession was promised by 30 Dec 2022. 5 complaints are on record with the regulator.

At a glance

Project

  • NameGodrej Elements
  • TypeResidential / Group Housing
  • Location
    • Godrej Elements
    • Hinjavadi (CT)
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100016626
  • ReraGenie IDRG-MH-47524

Builder

  • NamePearlite Real Properties Private Limited
  • Entity typeCompany
  • DirectorKrishna Bagaria
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2018PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 May 2018
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings7 building records
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
H2NA190000
I3NA190000
K1NA210000
K2NA210000
J1NA210000
I4NA190000
I2NA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 5 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

70 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Stilt Floor, at 0%.

H291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
I391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
K191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
K291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
J191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
I491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
I291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 5 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%
Others UGWTYes100%

Parking filed2391

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2,391
Closed/Covered2,243
Open Space148
BuildingClosed/CoveredOpen SpaceTotal
H225021271
I325221273
K142822450
K252321544
J133821359
I423921260
I221321234

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area27,165 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
RR Megacity Builders LtdMumbai CityMumbai City
Godrej Properties Limited (as Development Manager)KurlaMumbai Suburban
Pearlite Real Properties Private LimitedMumbai CityMumbai City

Approvals and building plan

Permissible FSI41555.78
Proposed, not sanctioned41,556 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchManekji Wadia Building, Ground floor, Nanik Motwani Marg, Fort Mumbai 400001, Maharashtra

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKapadia Associates Design LLP
EngineerCBRE South Asia Pvt Ltd,
Chartered AccountantM D Deshpande & Co.
PartnerRole in project
Pearlite Real Properties Private Limited-

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC005000000022083Hiten Suryakant TalatiGodrej properties ltd through Pearlite real properties pvt.ltd29/09/2018
CC005000000064775Manish JoshiPearlite Real Properties Limited10/11/2020
CC005000000085314Ashish Manohar Bhuskute and Prachi Ashish BhuskuteGodrej Properties Limited through Pearlite Real Properties Pvt. Ltd.08/03/2021
CC005000000106474Sunil SalunkheRabikant Sharma11/01/2022
CC005000000106485Pravin GhulePearlite Real Properties Pvt. LTD.23/01/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 May 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 May 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 May 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 May 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Apr 2023

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 220310 FINAL COMPLETION WITH RECORD PLAN.pdf5 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4_Godrej Elements.pdf5 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: ELEMENTS.pdf30 Sep 2022
Disclosure of sold/ booked inventoryFile: Disclosure of inventory (1).pdf21 Jul 2022
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory.pdf14 Apr 2022
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ARCHITECT CERTIFICATE.pdf14 Apr 2022
Certificates of CA (Form 3)File: MDD_ Elements Rera Form 3 Q3 21-22 SignedD.pdf15 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Elements ARCHITECT CERTIFICATE 311221C.pdf15 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Elements Engineer Certificate 311221J.pdf15 Feb 2022
Disclosure of sold/ booked inventoryFile: Godrej Elements All Towers 100222I.pdf15 Feb 2022
Disclosure of sold/ booked inventoryFile: Elements Sep 21.pdf26 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SEPTEMBER 2021 - FORM 1 ARCHITECT CERTIFICATE GODREJ ELEMENTS.PDF8 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Elements Engg Certificate -September'21.pdf8 Oct 2021
Certificates of CA (Form 3)File: MDD_Pearlite Elements -Sep 21 Signed.pdf8 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Godrej Elements_RERA certificate FY 20-21-1-8.pdf30 Sep 2021
Disclosure of sold/ booked inventoryFile: Godrej Elements compressed.pdf15 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JUNE2021 FORM 1 ARCHITECT CERTIFICATE GODREJ ELEMENTS.PDF10 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Elements Engg Certificate June21.pdf10 Jul 2021
Certificates of CA (Form 3)File: MDD Pearlite Elements June 21 signed.pdf10 Jul 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: ORIGINAL SOCIETY CERTIFICATE - Elements.pdf22 Jun 2021
Disclosure of sold/ booked inventoryFile: Elements All Towers Final 220521 compressed opt.pdf25 May 2021
Certificates of CA (Form 3)File: Pearlite Elements -Mar 21.pdf25 May 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 200320 OC Copy Page 1 to 4.pdf25 May 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 210420 Elemetns OC Certificate I2J1K1K2 compressed.pdf25 May 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20210521 FORM 1 ARCHITECT CERTIFICATE MAR 2021 GODREJ ELEMENTS.pdf23 May 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20210521FORM 1 ARCHITECT CERTIFICATE DEC 2020 GODREJ ELEMENTS.pdf23 May 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Elements Engg Certificate Monthly Certificate Dec20.pdf12 May 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Elements Engg Certificate Mar21.pdf12 May 2021
Certificates of CA (Form 3)File: Pearlite Elements -Dec 2020 signed.pdf12 May 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Godrej Elements RERA Architect certificate_Sept 20.pdf12 Apr 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Elements Engg Certificate Monthly Certificate Sep20 compressed.pdf12 Apr 2021
Certificates of CA (Form 3)File: Pearlite Elements -Sep 2020 signed.pdf12 Apr 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Godrej Elements Form revised uploaded.pdf1 Oct 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Godrej Elements Architect March20 uploaded.pdf9 Sep 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Godrej Elements Architect June20 uploaded.pdf9 Sep 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Elements Engineer June20 uploaded compressed.pdf9 Sep 2020
Certificates of CA (Form 3)File: Elements June 20 CA signed uploaded.pdf9 Sep 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Elements Engg Certificate Mar20 upload.pdf7 Aug 2020
Certificates of CA (Form 3)File: CA Certificate Mar20 Elements Upload.pdf7 Aug 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Godrej Elements Engg Certificate DEC 2019.pdf3 Apr 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Elements Arch Certificate September 30 2019 compressed.pdf24 Mar 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Elements Engg Certificate Sept 30 2019 compressed.pdf24 Mar 2020
Certificates of CA (Form 3)File: Godrej Elements CA Sept 30 2019 1 to 3.pdf24 Mar 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ELEMENTS Engineer monthly certificate 31Dec2019.pdf23 Mar 2020
Annual Audit Report of Statutory CA (Form 5)File: Godrej Elements Form 5.pdf30 Sep 2019
Proforma of Allotment letterFile: Elements RERA doc- Copy.pdf20 Jun 2018
Proforma of Allotment letterFile: Docs Elements.pdf7 Jun 2018
OtherFile: Special Features of Godrej Elements.pdf26 May 2018
Building plan approvalFile: CC 09 05 18.pdf18 May 2018
Building Plan Approval (IOD)File: CC 09 05 18.pdf18 May 2018
Certificates of CA (Form 3)File: CA Certificate 17518.pdf18 May 2018
OtherFile: amenities.pdf17 May 2018
Proforma of Allotment letterFile: AFS Godrej elements.pdf16 May 2018
Layout approvalFile: Layout Com.pdf11 May 2018
Copy of the legal title reportFile: Title Certificate.pdf11 May 2018
Details of encumbrancesFile: No Encumbrance Certificate.pdf11 May 2018
Copy of Layout Approval (in case of layout)File: Layout Com.pdf11 May 2018
Commencement Certificates / NA Order for plotted developmentFile: CC 09 05 18.pdf11 May 2018
Declaration in FORM BFile: doc35391920180511175923.pdf11 May 2018
Declaration in FORM BFile: Form B new Pearlite.pdf11 May 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Godrej 24Hinjewadi Taluka Mulshi District Pune816CompletedSep 2021Sep 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Godrej Elements on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Godrej Elements13,700+ in Pune

2 kmGodrej ElementsCompleted 35Lapsed / revoked 16Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 93 registered projects within 2 km.

Builder: Pearlite Real Properties Private Limited

Pearlite Real Properties Private Limited has 2 registrations on MahaRERA, including Godrej 24 and Godrej Elements. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Godrej Elements is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej Elements?

The registered promoter entity is Pearlite Real Properties Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej Elements?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Godrej Elements?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Godrej Elements?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Godrej Elements?

The professionals named in the filing: Architect: Kapadia Associates Design LLP; Engineer: CBRE South Asia Pvt Ltd,; Chartered Accountant: M D Deshpande & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Godrej Elements?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej Elements. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej Elements to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.