Red flags

  • Litigation declared, 30 cases
  • 6 complaints at MahaRERA
  • Completion date moved by 72 months
  • 3 extensions taken
  • Rs 700.00 crore secured on the land, in favour of The Federal Bank Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: .
Dec 2029Possession promisedmoved 72 months from the original
4 of 11Construction stages donefurthest along: Podiums (if any), 94%
1 of 158Units unsoldnot recorded sold or booked
6Complaints at MahaRERAon this registration
Jump to the 252 documents Report an error

Godrej Avenue Eleven - Tower B is a Residential / Group Housing project by GODREJ RESIDENCY PRIVATE LIMITED in Mumbai, 400008, registered with MahaRERA as P51900006299 on 14 Aug 2017. Possession is promised by 31 Dec 2029. The completion date has moved by 72 months from the original filing. 157 of the 158 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 6 complaints are on record with the regulator.

At a glance

Project

  • NameGodrej Avenue Eleven - Tower B
  • TypeResidential / Group Housing
  • Location
    • Maulana Azad Road
    • Mumbai
    • 400008
  • Pincode400008
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900006299
  • ReraGenie IDRG-MH-26519

Builder

  • NameGODREJ RESIDENCY PRIVATE LIMITED
  • Entity typeCompany
  • CINU70109MH2017PTC292515
  • GSTIN27AAGCG7455G1ZD
  • Godrej Leadership Forum - Region Head Mumbai CityAmitesh Shah
  • Other registrations1 more →

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Aug 2017
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 30 Dec 2023)
  • Buildings1 building record
  • Documents filed252 files

Current status

99%157 of 158 units booked
12.1%Work done, per cost certificate

Figures as on 19 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower BNA67411580158

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 94%.

Tower B: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)94%
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed368

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots368
Closed/Covered368

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,802 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofThe Federal Bank Limited
Secured amountRs 700.00 crore
CERSAI search filedYes
Declared on30 Sep 2024
LandownerVillageDistrict
Indo Global Soft Solutions and Technologies Pvt LtAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI31314.65
Proposed, not sanctioned3,386 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCorporate Client Service Center, 32/34, Church gate House, Veer Nariman Road, Fort, Mumbai, 400001
Estimated costRs 575.12 cr
Cost incurredRs 69.43 cr
Work done12.07%
BuildingWingEstimatedIncurred
Tower BNARs 568.44 crRs 63.01 cr
-NARs 6.68 crRs 6.43 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRUPALI D MANDE
EngineerRajendra Joshi
EngineerVinyasa Consultants
Chartered AccountantBSR and Co. LLP
Chartered AccountantAKPJ & Associates
PartnerRole in project
GODREJ RESIDENCY PRIVATE LIMITED-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51900013221Dec 2023 → Dec 2024

Reason as filed by the promoterAllottees have granted consent for the Proposed Extended Date of Completion to be extended upto 31.12.2028, however in view of the restriction on the portal for populating the date in the portal by only one year, we have put the date as 29.12.2024

EXT51900024396Dec 2023 → Dec 2028

Reason as filed by the promoter1. Project approved by the Hon'ble Authority u/s 15 via email dated 27th March 2023. (Authority Order Attached in Other Tab Sr. no.43) 2. We have updated details in correction Application and for extension of date , we have applied under Extension u/s 7(3). 3. The new Project completion date post take over is 31st December 2028. 4. Consent of 56% Allottees (attached) as per latest books. 5. Tab Sr No. 01 - Resolution of the Association of Allottees in format 6. Tab Sr no.02 to Sr no.42 are 41 Consents attached as Annexures 7. All queries raised are resolved and uploaded in the main application

EA11022619796Dec 2023 → Dec 2029

Reason as filed by the promoter1. The consent of 81.88% of allottees has been uploaded in support of this extension application. 2. Form B uploaded. 3. PERT for the remaining completion work is uploaded in the Application. 4. The Project got delayed due to following reasons:- a. The project was delayed due to the late vacation and handover of the site, which prevented work from starting as scheduled. Consequently, mobilization, manpower deployment, machinery setup, and material procurement were impacted. 5. The revised date of completion is now 31/12/2029. 6. We hereby assure the Hon’ble Authority that the project shall be

Litigation declared30

CaseCourtStatus
RAD Suit No 2064 of 2007/2007Small Causes Court Trial MumbaiOngoing
RAD Suit No 323 of 2008/2008Small Causes Court Trial MumbaiOngoing
RAD Suit No 324 of 2008/2008Small Causes Court Trial MumbaiOngoing
LC Suit No 2501 of 2009/2009City Civil Court MumbaiOngoing
FA No 972 of 2010/2010Bombay High CourtOngoing
LC Suit No 1362 of 2011/2011City Civil Court MumbaiOngoing
LC Suit No 1035 of 2012/2012City Civil Court MumbaiOngoing
LC Suit No 1363 of 2011/2011City Civil Court MumbaiOngoing
RAD Suit No 98 of 2010/2010Small Causes Court Trial MumbaiOngoing
RAD Suit No 100 of 2011/2011Small Causes Court Trial MumbaiOngoing
RAD Suit No 104 of 2011/2011Small Causes Court Trial MumbaiOngoing
RAE Suit No 130/163 of 2011/2011Small Causes Court Trial MumbaiOngoing
WP L No 661 of 2015/2015Bombay High CourtOngoing
Suit No 2323 of 2015/2015City Civil Court MumbaiOngoing
CHS No 807 of 2007 in LC Suit 4562 of 2006/2006City Civil Court MumbaiOngoing
CHS No 805 of 2007 in LC Suit 479 of 2006/2006City Civil Court MumbaiOngoing
NM 3659 of 2015 in SC No 6888 of 2014/2014City Civil Court MumbaiOngoing
Appeal 53 of 2017/2017High Power Committee MHADAOngoing
Appeal 52 of 2017/2017High Power Committee MHADAOngoing
Suit No 996 of 2017/2017City Civil Court MumbaiOngoing
Appeal No 54 /2017High Power Committee MHADAOngoing
Civil WP No 779 of 2014/2014High Court BombayOngoing
Civil WP No 4458 of 2014/2014High Court BombayOngoing
WP No 760 of 2018/2018High Court BombayOngoing
Appeal No 7 of 2018/2018High Power Committee MHADAOngoing
WP L 2575 of 2018/2018High Court BombayOngoing
2018High Court BombayOngoing
2018High Court BombayOngoing
WP L No 62 of 2019/2019High Court BombayOngoing
RAD Suit No. 2064 of 2007/2007Small Causes Court (Trial), Mumbai.Ongoing

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC006000000012337Mr. Prateek KumarNeelkamal Realtors Towers Private Limited08/12/2017
CC006000000195203Ravi Ramesh RohiraNeelkamal Realtors Tower Pvt. Ltd.09/12/2020
CC006000000196769Prajesh Chandra Mohan and Micky Prajesh MohanNeelkamal Realtors Tower Private Limited and Indo Global Soft Solutions and Technologies Pvt. Ltd.20/04/2021
CC006000000196770Chandra Mohan and Naina Chandra MohanNeelkamal Realtors Tower Private Limited and Indo Global Soft Solutions and Technologies Pvt. Ltd.20/04/2021
CC006000000395508Synergyone Infrastructure And Projects PVT LTDNeelkamal Realtors Tower Pvt Ltd (DB Realty)09/05/2023
CC006000000375256PRATEEK KUMARNeelkamal Realtors Tower Pvt Ltd (DB Realty)09/05/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jan 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jul 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed252

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 252 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement certificateFile: TA Full CC Tower B FCC up to 28th floor.pdf19 Jul 2026
Withdrawal Update Form 1File: Tower B_Form 1_Signed.pdf19 Jul 2026
Withdrawal Update Form 2File: RERA-GODREJ AVENUE11- TOWER B-MAHALAKSHMI_CERTIFICATE JUN26-Signed.pdf19 Jul 2026
Withdrawal Update Form 3File: CA Certificate_Tower B_Jun26_Signed.pdf19 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A_Tower B.pdf13 Jun 2026
Commencement certificateFile: Avenue Eleven CC 2 Apr 2026.pdf17 Apr 2026
Withdrawal Update Form 1File: Godrej Avenue_Tower B_Signed.pdf17 Apr 2026
Withdrawal Update Form 2File: RERA-Withdrawal Application Form2 TB_Signed.pdf17 Apr 2026
Withdrawal Update Form 3File: CA Certificate_Tower B_Signed.pdf17 Apr 2026
Form 1File: Tower B _Dec 2025_Signed.pdf16 Jan 2026
Form 2File: GODREJ AVENUE11- TOWER B-MAHALAKSHMI_CERTIFICATE DEC25-Final_Signed.pdf16 Jan 2026
Form 3File: CA certificate Dec 25 - One M- Tower B_Final_Signed.pdf16 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Inventory Details - Circular 29 (Dec25) Tower B_Signed.pdf16 Jan 2026
Form 1File: Tower B _Sep 2025_Signed.pdf11 Oct 2025
Form 2File: GODREJ AVENUE11- TOWER B-MAHALAKSHMI_CERTIFICATE SEPT'25-Final_Signed.pdf11 Oct 2025
Form 3File: CA certificate Sep 25 - One M- Tower B_Final_Signed.pdf11 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Details - Circular 29 (Sep'25) Tower B.pdf11 Oct 2025
Form 5 (FY 2024-2025)File: Form 5_OneM Tower B_Mar'25_compressed.pdf28 Aug 2025
Form 1File: Tower B June 2025_Signed.pdf20 Jul 2025
Form 2File: GODREJ AVENUE11- TOWER B-MAHALAKSHMI_CERTIFICATE JUN'25-Final_Signed.pdf20 Jul 2025
Form 3File: CA certificate Jun 25 - One M- Tower B_Final.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Details - Circular 29 (Mar'25) Tower B.pdf20 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A_Tower B_Signed.pdf16 May 2025
Certificates of CA (Form 3)File: CA Certificate_Tower B_Comp.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory Details - Circular 29 (Mar'25) Tower B.pdf17 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower B _March 2025_Signed.pdf15 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GODREJ AVENUE11- TOWER B-MAHALAKSHMI_CERTIFICATE 31ST MAR'25-Final_Signed.pdf15 Apr 2025
Building plan approvalFile: Approval letter_signed.pdf11 Mar 2025
Building plan approvalFile: Drawing 1.pdf11 Mar 2025
Building Plan Approval (IOD)File: Approval letter_signed.pdf11 Mar 2025
Building Plan Approval (IOD)File: Drawing 1.pdf11 Mar 2025
Proforma of Agreement for saleFile: Draft Agreement For Sale_Tower B_Draft without prejudice_Avenue Eleven.pdf19 Feb 2025
Building plan approvalFile: Certificate.pdf21 Jan 2025
Building plan approvalFile: Certificate.pdf21 Jan 2025
Building plan approvalFile: Certificate.pdf21 Jan 2025
Building plan approvalFile: Certificate.pdf21 Jan 2025
Building plan approvalFile: Certificate.pdf21 Jan 2025
Building plan approvalFile: Certificate.pdf21 Jan 2025
Building Plan Approval (IOD)File: Certificate.pdf21 Jan 2025
Building Plan Approval (IOD)File: Certificate.pdf21 Jan 2025
Building Plan Approval (IOD)File: Certificate.pdf21 Jan 2025
Building Plan Approval (IOD)File: Certificate.pdf21 Jan 2025
Building Plan Approval (IOD)File: Certificate.pdf21 Jan 2025
Building Plan Approval (IOD)File: Certificate.pdf21 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower B _Dec 2024_Signed.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GODREJ AVENUE11- TOWER B-MAHALAKSHMI_CERTIFICATE DEC'24-Signed.pdf20 Jan 2025
CERSAI detailsFile: CERSAI_Search_Report_200335726623_For_Asset_Based_Search_17_01_2025_12_54_17_965.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Tower B_Inventory.pdf20 Jan 2025
Certificates of CA (Form 3)File: CA CERTIFICATE Tower B_Dec'24_Signed.pdf20 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower B _Dec 2024_Signed.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GODREJ AVENUE11- TOWER B-MAHALAKSHMI_CERTIFICATE DEC'24-Signed.pdf20 Jan 2025
CERSAI detailsFile: CERSAI_Search_Report_200335726623_For_Asset_Based_Search_17_01_2025_12_54_17_965.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Tower B_Inventory.pdf20 Jan 2025
Certificates of CA (Form 3)File: CA CERTIFICATE Tower B_Dec'24_Signed.pdf20 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower B _Dec 2024_Signed.pdf20 Jan 2025
Certificates of CA (Form 3)File: CA CERTIFICATE Tower B_Dec'24_Signed.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GODREJ AVENUE11- TOWER B-MAHALAKSHMI_CERTIFICATE DEC'24-Signed.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Tower B_Inventory.pdf20 Jan 2025
CERSAI detailsFile: CERSAI_Search_Report_200335726623_For_Asset_Based_Search_17_01_2025_12_54_17_965.pdf20 Jan 2025
Certificates of CA (Form 3)File: CA Certificate Tower B_compressed.pdf2 Dec 2024
Certificates of CA (Form 3)File: CA Certificate Tower B.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_TB_FY24-Q2.pdf13 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_TB_FY24-Q1.pdf13 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project) (1).pdf13 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate - Q2-Form 2A.pdf12 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Certificates of Engineer_Q3_FY 23-24.pdf30 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mahalaxmi Tower B_Sep 2024_Signed.pdf18 Oct 2024
Certificates of CA (Form 3)File: CA CERTIFICATE_Tower B_Sep'24_Signed.pdf18 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GODREJ AVENUE11- TOWER B-MAHALAKSHMI_CERTIFICATE SEPT'24_Signed.pdf18 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory Details - Circular 29 (Sep'24) Tower B_Signed.pdf18 Oct 2024
Declaration about Commencement CertificateFile: CC Declaration_TB_Signed.pdf18 Oct 2024
CERSAI detailsFile: Non Encumbrance Certificate Legal and Finance_Godrej Avenue Eleven_Signed.pdf18 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: 2438182_FurtherCC_signed.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Godrej Avenue Eleven Tower B Form 5 FY 2023 24.pdf7 Oct 2024
Form 5 (FY 2023-2024)File: Godrej Avenue Eleven Tower B Form 5 Signed Deliverables.pdf3 Oct 2024
Layout approvalFile: Sheet No 1 highlighted_compressed.pdf30 Jul 2024
Building plan approvalFile: Sheet No 1.pdf30 Jul 2024
Building plan approvalFile: Sheet No 2.pdf30 Jul 2024
Building plan approvalFile: Sheet No 3.pdf30 Jul 2024
Building plan approvalFile: Sheet No 4.pdf30 Jul 2024

Keep Godrej Avenue Eleven - Tower B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mumbai

2 kmGodrej Avenue Eleven - TCompleted 12Lapsed / revoked 19Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 59 registered projects within 2 km.

Builder: GODREJ RESIDENCY PRIVATE LIMITED

GODREJ RESIDENCY PRIVATE LIMITED has 2 registrations on MahaRERA, including Godrej Avenue Eleven - Tower A and Godrej Avenue Eleven - Tower B. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record.

Frequently asked questions

What are my rights if Godrej Avenue Eleven - Tower B is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Godrej Avenue Eleven - Tower B?

The registered promoter entity is GODREJ RESIDENCY PRIVATE LIMITED, a company as per the filing. Its CIN U70109MH2017PTC292515 and GSTIN 27AAGCG7455G1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Godrej Avenue Eleven - Tower B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Godrej Avenue Eleven - Tower B?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Godrej Avenue Eleven - Tower B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Godrej Avenue Eleven - Tower B?

The professionals named in the filing: Architect: RUPALI D MANDE; Engineer: Rajendra Joshi; Engineer: Vinyasa Consultants; Chartered Accountant: BSR and Co. LLP; Chartered Accountant: AKPJ & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Godrej Avenue Eleven - Tower B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Godrej Avenue Eleven - Tower B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Godrej Avenue Eleven - Tower B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.