Home / Browse projects / Thane, Maharashtra / Godrej Ascend Phase 1
Godrej Ascend Phase 1
RG-MH-35635 · RERA P51700034608 · Last updated on MahaRERA portal: 15 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 5 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Godrej Ascend Phase 1 is a Residential / Group Housing project by Godrej Properties Limited in Thane, Maharashtra, registered with MahaRERA as P51700034608 on 20 Apr 2022. Possession is promised by 30 Apr 2028. 606 of the 666 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete. 5 complaints are on record with the regulator.
At a glance
Project
- NameGodrej Ascend Phase 1
- TypeResidential / Group Housing
- Location
- Kolshet Road
- Dhokali Naka
- Thane (M Corp.)
- Thane
- 400607
- Pincode400607
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700034608
- ReraGenie IDRG-MH-35635
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on20 Apr 2022
- Promised completion30 Apr 2028
- Revised completionNone
- Buildings2 building records
- Documents filed177 files
Current status
Figures as on 15 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 2 | NA | 43 | 42 | 241 | 12 | 253 |
| Tower 4 | NA | 43 | 42 | 413 | 0 | 413 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 48%.
Tower 239%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 24% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower 441%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 48% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| Clubhouse | Yes | 0% |
Parking filed19
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | R Design Architects |
| Engineer | Rajendra Joshi |
| Engineer | VINYASA CONSULTANTS |
| Chartered Accountant | Piyush Jain |
| Chartered Accountant | Rupen Dilip Kumar Shah |
| Partner | Role in project |
|---|---|
| Godrej Properties Limited | - |
Complaints filed with MahaRERA5
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000303731 | Jai Nagpal | Godrej Properties | 27/12/2022 |
| CC006000000333897 | VIJAY KHAMBE | GODREJ PROPERTIES | 05/01/2023 |
| CC006000000344218 | BHASKAR SHAM SHETTY | GODREJ PROPERTIES LTD | 04/02/2023 |
| CC006000000480043 | Saathesh Kumar Edalath | Godrej Properties Limited | 12/04/2024 |
| CC12400126 | Rahul Naresh Bari | Godrej Properties Limited | 16/09/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 17 Apr 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Apr 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Apr 2028
Documents filed177
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 177 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 Architect certificate.pdf | 15 Jul 2026 |
| Form 2File: Form 2 Engineer certificate.pdf | 15 Jul 2026 |
| Form 3File: Form 3- CA certificate.pdf | 15 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory.pdf | 15 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A Ascend ph 1.pdf | 16 Jun 2026 |
| Form 1File: Arch Ph1.pdf | 20 Apr 2026 |
| Form 3File: CA Cer Ph1.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Ascend Inventory Declaration Ph1.pdf | 20 Apr 2026 |
| Form 2File: EC Ph 1.pdf | 20 Apr 2026 |
| Form 1File: Arch ph 1.pdf | 20 Jan 2026 |
| Form 2File: EC ph 1.pdf | 20 Jan 2026 |
| Form 3File: CA ph 1_compressed.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Inventory ph 1.pdf | 20 Jan 2026 |
| Form 1File: Ascend Ph 1 Arch Cer.pdf | 16 Oct 2025 |
| Form 2File: Ascend Ph 1 EC.pdf | 16 Oct 2025 |
| Form 3File: Ascend Ph 1 CA Cer.pdf | 16 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Ascend Ph 1 Inventory Disclosure.pdf | 16 Oct 2025 |
| Form 5 (FY 2024-2025)File: Ascend Phase I.pdf | 28 Aug 2025 |
| Form 1File: Ascend Arch certificate Phase 1 Jun 25.pdf | 18 Jul 2025 |
| Form 2File: Ascend Engineers certificate Phase 1 Jun 25.pdf | 18 Jul 2025 |
| Form 3File: Ascend Phase 1 CA Certificate Jun 25.pdf | 18 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Ascend Phase 1 Sold inventory.pdf | 18 Jul 2025 |
| Form 2A (FY 2024-2025)File: Ascend -Ph 1_ Quality Assurance Certificate FY 25 (2).pdf | 17 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ascend Phase 1 Arch certificate.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ascend Phase 1 CA Certificate Mar 25-compressed.pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ascend Phase 1 Engineers certificate Mar 25.pdf | 17 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Ascend Phase 1 Sold inventory Mar 25.pdf | 17 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Ascend Phase 1 Quality certificate Mar 25.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ascend RERA Ph 1 Arch cert Dec 24.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ascend RERA Ph 1 Engr cert Dec 24.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Phase 1 Sold inventory disclosure Dec 24.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ascend RERA Ph 1 CA cert Dec 24.pdf | 20 Jan 2025 |
| Proforma of Agreement for saleFile: Godrej Ascend AFS Phase 1.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ascend RERA Ph 1 Arch cert Dec 24.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ascend RERA Ph 1 Engr cert Dec 24.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Phase 1 Sold inventory disclosure Dec 24.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ascend RERA Ph 1 CA cert Dec 24.pdf | 20 Jan 2025 |
| Proforma of Agreement for saleFile: Godrej Ascend AFS Phase 1.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ascend RERA Ph 1 Arch cert Dec 24.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ascend RERA Ph 1 CA cert Dec 24.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ascend RERA Ph 1 Engr cert Dec 24.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Phase 1 Sold inventory disclosure Dec 24.pdf | 20 Jan 2025 |
| Proforma of Agreement for saleFile: Godrej Ascend AFS Phase 1.pdf | 20 Jan 2025 |
| OtherFile: Board Resolution Ascend RERA compliance 26 Sep 24.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 1 Arch cert Sep 24.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 1 CA cert Sep 24.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 1 Engr cert Sep 24.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Phase 1 Sold inventory disclosure Sep 24.pdf | 19 Oct 2024 |
| OtherFile: Board Resolution Ascend RERA compliance 26 Sep 24.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 1 Arch cert Sep 24.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 1 CA cert Sep 24.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 1 Engr cert Sep 24.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Phase 1 Sold inventory disclosure Sep 24.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase 1 Arch cert Sep 24.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 1 CA cert Sep 24.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase 1 Engr cert Sep 24.pdf | 19 Oct 2024 |
| OtherFile: Board Resolution Ascend RERA compliance 26 Sep 24.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Phase 1 Sold inventory disclosure Sep 24.pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Godrej Ascend Ph 1 - Signed Form 5.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Godrej Ascend Ph 1 - Signed Form 5.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Godrej Ascend Ph 1 - Signed Form 5.pdf | 6 Oct 2024 |
| Form 5 (FY 2023-2024) | 23 Sep 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ascend_Ph1_Jun24_signed.pdf | 18 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure_Ph1_signed.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cert_Ph1_Jun24_signed_compressed.pdf | 18 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ascend_Ph1_Jun24_signed.pdf | 17 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Ph1_FY24_signed.pdf | 17 Jun 2024 |
| Layout approvalFile: Sheet -1 Layout_upload.pdf | 22 Apr 2024 |
| Building plan approvalFile: Sheet -8_T2.pdf | 22 Apr 2024 |
| Building plan approvalFile: Sheet -9_T2.pdf | 22 Apr 2024 |
| Building plan approvalFile: Sheet -10_T2.pdf | 22 Apr 2024 |
| Building plan approvalFile: Sheet -11_T2.pdf | 22 Apr 2024 |
| Building plan approvalFile: Sheet -12_T2.pdf | 22 Apr 2024 |
| Building plan approvalFile: Sheet -13_T2.pdf | 22 Apr 2024 |
| Building plan approvalFile: Sheet -14_T2.pdf | 22 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: Sheet -1 Layout_upload.pdf | 22 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet -8_T2.pdf | 22 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet -9_T2.pdf | 22 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet -10_T2.pdf | 22 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet -11_T2.pdf | 22 Apr 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Godrej One | " Godrej One Pirojshanagar Off Eastern Express Highway Vikhroli East Mumbai 400079 Maharashtra India" | 39 | Completed | Jan 2014 | Late, Aug 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 27 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 177 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Godrej Ascend Phase 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dhokali Naka7,600+ in Thane
Filed coordinates, straight-line distance. 345 registered projects within 2 km.
Hiranandani Westgate Phase 1
SHODEN DEVELOPERS PRIVATE LIMITED
Forestville - Phase 1
Oberoi Realty Limited
DOSTI WEST COUNTY - PHASE 4- DOSTI PINE
DOSTI ENTERPRISES
Y SQUARE
SHREE MALLINATH ENTERPRISE LLP
Primera
Agile Real Estate Dev Private Limited
UNIQUE VISTAS MHADA BUILDINGNO. 4 5 6 7
MADHU HARSHAD DOSHI
See every Thane project, with the district possession charts
Builder: Godrej Properties Limited
Godrej Properties Limited has 28 registrations on MahaRERA, including The Trees, Residential Phase 1 and Godrej Anandam. Its filings disclose 35 earlier MahaRERA projects: declares 28 of 30 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Godrej Ascend Phase 1 is delayed beyond 30 Apr 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Godrej Ascend Phase 1?
The registered promoter entity is Godrej Properties Limited, a company as per the filing. Its CIN L74120MH1985PLC035308 and GSTIN 27AAACG3995M1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Godrej Ascend Phase 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Godrej Ascend Phase 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Godrej Ascend Phase 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Godrej Ascend Phase 1?
The professionals named in the filing: Architect: R Design Architects; Engineer: Rajendra Joshi; Engineer: VINYASA CONSULTANTS; Chartered Accountant: Piyush Jain; Chartered Accountant: Rupen Dilip Kumar Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Godrej Ascend Phase 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback