Home / Browse projects / Thane, Maharashtra / GN FIRDOWS

Registration lapsed No litigation declared Residential / Group Housing project

GN FIRDOWS

By GNR Developers

RG-MH-12795 · RERA P51700022771 · Last updated on MahaRERA portal: 30 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
6 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 60%
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

GN FIRDOWS is a Residential / Group Housing project by GNR Developers in Thane, Maharashtra, registered with MahaRERA as P51700022771 on 17 Oct 2019. Possession was promised by 30 Dec 2024 and is now 22 months past that date.

At a glance

Project

  • NameGN FIRDOWS
  • TypeResidential / Group Housing
  • Location
    • WESTERN PARK
    • KASHI VILLAGE
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700022771
  • ReraGenie IDRG-MH-12795

Builder

  • NameGNR Developers
  • Entity typePartnership
  • PartnersRAMESH HASTIMAL JAIN, UDAY GHANSHYAM NAIK, SALIL RANJAN PATIL, SANDESH BALWANT PATIL

Key dates

22 months past promisethis monthRegisteredOct 2019PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Oct 2019
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings3 building records
  • Documents filed80 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA130000
BUILDING NO 2NA340000
BUNGALOWNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 30 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 60%.

BUILDING NO 151%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 29%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed46

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots46
Closed/Covered46
BuildingClosed/CoveredTotal
BUILDING NO 11313
BUILDING NO 23232
BUNGALOW11

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,548 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
GULSHAN MOHD. ARIF TASEMira-Bhayandar (M Corp.)Thane

Approvals and building plan

Permissible FSI8776.8
Proposed, not sanctioned4,096 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHITAL NAGAR, MIRA ROAD - EAST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANISH & ASSOC
EngineerANISH & ASSOCIATES
Chartered AccountantNIKHITA M SHAH & CO
PartnerRole in project
GNR Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Mar 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Mar 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf30 Apr 2025
Declaration in FORM BFile: FORM B -extension.pdf25 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 WORK COMPLETION-31-12-24.pdf25 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM-3 -31-12-24 reduced.pdf25 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: COST CERTIFICATE form 2 31-12-24.pdf25 Mar 2025
Declaration about Commencement CertificateFile: FORM D cc declaration.pdf25 Mar 2025
Declaration in FORM BFile: FORM B -extension.pdf24 Jan 2025
Declaration about Commencement CertificateFile: FORM D cc declaration.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD inventory 31-12-24.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM I.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM II.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf11 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A QUALITY ASSURANCE.pdf11 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5.pdf11 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY-2024-25.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER COST CERTIFICATE.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31-03-2023_compressed (2).pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf4 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf4 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: ADDITIONAL CC.pdf11 May 2023
Disclosure of sold/ booked inventoryFile: FLAT (2 files merged).pdf11 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: from 5 2021-22.pdf28 Jan 2023
Disclosure of sold/ booked inventoryFile: sale of inventory GNR 31-12-22.pdf7 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: from 5 2021-22.pdf7 Jan 2023
Disclosure of sold/ booked inventoryFile: FLAT SOLD ANDBOOKED.pdf15 Nov 2022
Disclosure of sold/ booked inventoryFile: SHOP SOLD AND BOOKED.pdf15 Nov 2022
Disclosure of sold/ booked inventoryFile: FLAT SALE 30-06-2022.pdf20 Jul 2022
Disclosure of sold/ booked inventoryFile: SHOP SALE 30-06-2022.pdf20 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1.pdf15 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Jun 2022
Disclosure of sold/ booked inventoryFile: SOLD FLAT.pdf15 Jun 2022
Disclosure of sold/ booked inventoryFile: SOLD SHOP.pdf15 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf15 Jun 2022
Disclosure of sold/ booked inventoryFile: DISCLOSER OF SOLD-BOOKED 31-12-2021.pdf2 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 CERTIFICATE OF COMPLETION 19-20.pdf25 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 CERTIFICATE OF COMPLETION 20-21.pdf25 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 CERTIFICATE OF COST 20-21.pdf25 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 2 CERTIFICATE OF COST19-20.pdf25 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 2019-20 converted.pdf25 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 2020-21 converted.pdf25 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM-5 2019-20 umang.pdf25 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM-5 2020-21 umang.pdf25 Feb 2022
Disclosure of sold/ booked inventoryFile: FLAT SOLD BOOKED QTR 2.pdf21 Oct 2021
Layout approvalFile: scan0075.pdf30 Mar 2021
Building plan approvalFile: scan0077.pdf30 Mar 2021
Building plan approvalFile: plan 2.pdf30 Mar 2021
Building plan approvalFile: plan 3.pdf30 Mar 2021
Building plan approvalFile: paln 4.pdf30 Mar 2021
Building plan approvalFile: plan 6.pdf30 Mar 2021
Copy of the legal title reportFile: title report_01 (20 files merged) (1) (1).pdf30 Mar 2021
Copy of the legal title reportFile: title report_21 (20 files merged).pdf30 Mar 2021
Copy of Layout Approval (in case of layout)File: scan0075.pdf30 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: scan0077.pdf30 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: plan 2.pdf30 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: plan 3.pdf30 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: paln 4.pdf30 Mar 2021
Building Plan Approval / NA Order for plotted developmentFile: plan 6.pdf30 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: GNR DEVELOPERS REVISED CC.pdf30 Mar 2021
Proforma of Allotment letterFile: Final_RERA AGR (2) (1).pdf30 Mar 2021
Declaration in FORM BFile: uday naik form b revised.pdf16 Oct 2019
Copy of the legal title reportFile: title certificate-pages-16-29 (2).pdf4 Oct 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_page 1 (5 files merged).pdf3 Oct 2019
Copy of the legal title reportFile: title certificate-pages-1-15 (2).pdf25 Sep 2019
Proforma of Allotment letterFile: Rera Allotment Letter_GN Firdows.pdf25 Sep 2019
Proforma of Allotment letterFile: RERA DRAFT AGREEMENT.pdf25 Sep 2019
Building plan approvalFile: building no 2.pdf19 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: building no 2.pdf19 Sep 2019
Commencement Certificates / NA Order for plotted developmentFile: N A Order (1).pdf19 Sep 2019
OtherFile: partnership deed original part 1.pdf19 Sep 2019
OtherFile: partnership deed original part 2.pdf19 Sep 2019
OtherFile: supplimentry partnership deed.pdf19 Sep 2019
Building plan approvalFile: building no 1.pdf17 Sep 2019
Layout approvalFile: layout plan final.pdf17 Sep 2019
PAN CardFile: GNR DEVELOPERS PAN COPY-1.pdf17 Sep 2019
Details of encumbrancesFile: declration of encumbrance.pdf17 Sep 2019
Copy of Layout Approval (in case of layout)File: layout plan final.pdf17 Sep 2019
Building Plan Approval / NA Order for plotted developmentFile: building no 1.pdf17 Sep 2019
Commencement Certificates / NA Order for plotted developmentFile: CC CERTIFICATE.pdf17 Sep 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 _07 (6 files merged).pdf17 Sep 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2_01 (6 files merged).pdf17 Sep 2019

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GN FIRDOWS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KASHI VILLAGE7,600+ in Thane

2 kmGN FIRDOWSCompleted 40Lapsed / revoked 19Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 107 registered projects within 2 km.

Builder: GNR Developers

GNR Developers has 1 registration on MahaRERA, including GN FIRDOWS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that GN FIRDOWS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if GN FIRDOWS is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GN FIRDOWS?

The registered promoter entity is GNR Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GN FIRDOWS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GN FIRDOWS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GN FIRDOWS?

The professionals named in the filing: Architect: ANISH & ASSOC; Engineer: ANISH & ASSOCIATES; Chartered Accountant: NIKHITA M SHAH & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GN FIRDOWS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GN FIRDOWS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GN FIRDOWS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.