Home / Browse projects / Mumbai Suburban, Maharashtra / GLORY APARTMENTS

Registration lapsed No litigation declared Others project

GLORY APARTMENTS

By Adnani Constructions

RG-MH-93151 · RERA P51800048855 · Last updated on MahaRERA portal: 9 Apr 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
8 of 11Construction stages donefurthest along: Basement (if any), 0%
25 of 29Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

GLORY APARTMENTS is a Others project by Adnani Constructions in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800048855 on 24 Jan 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing. 4 of the 29 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameGLORY APARTMENTS
  • TypeOthers
  • Location
    • I C COLONY ROAD
    • BORIVALI WEST
    • Eksar
    • Borivali
    • Mumbai Suburban
    • 400103
  • Pincode400103
  • RERA no.P51800048855
  • ReraGenie IDRG-MH-93151

Builder

  • NameAdnani Constructions
  • Entity typeOthers
  • Named personBALDEV ADNANI

Key dates

10 months past promisethis monthRegisteredJan 2023First promiseDec 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on24 Jan 2023
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed70 files

Current status

14%4 of 29 units booked
57.3%Work done, per cost certificate

Figures as on 9 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GLORY APARTMENTSNA10025429

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

GLORY APARTMENTS: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed15

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots15
Closed/Covered15

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area710 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jun 2025
LandownerVillageDistrict
GLORY CO OP HSG SOC LTDEksarMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1249.4
Proposed, not sanctioned1,249 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCRAWFORD MARKET
Estimated costRs 7.00 cr
Cost incurredRs 4.01 cr
Work done57.26%
BuildingWingEstimatedIncurred
GLORY APARTMENTSNARs 7.00 crRs 4.01 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIJAY GORADIA
EngineerPRASAD THUMAR
EngineerNEXUS
EngineerPATEL PRASAD ARVIND CHAMPA
Chartered AccountantNEHALI & CO DOSHI
PartnerRole in project
Adnani Constructions-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800025816Dec 2024 → Dec 2025

Reason as filed by the promoterDue to Delay in N.O.C. from National Monuments Authority, Delhi for project falling in Mandapeshwar caves within 200 meters Date of Application filed on 12th June 2022 and we received N.O.C. on 18th April 2023 nearly 11 months and One shop owner Mr. Querishi has filed case in High court for which time taken March, April, May 2022 so in total we have lost 11 month and 3 month (To 14 month) for Developing our project,. the project was not able to get completed in time. We would lil- to request you to further grant us extension for One Year.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf9 Apr 2026
Withdrawal Update Form 2File: Nexus form 2.pdf9 Apr 2026
Withdrawal Update Form 3File: CA FORM 3.pdf9 Apr 2026
Withdrawal Update Form 1File: form 1.pdf25 Mar 2026
Withdrawal Update Form 1File: form 1.pdf25 Mar 2026
Withdrawal Update Form 2File: Nexus form 2.pdf25 Mar 2026
Withdrawal Update Form 2File: Nexus form 2.pdf25 Mar 2026
Withdrawal Update Form 3File: CA FORM 3.pdf25 Mar 2026
Withdrawal Update Form 3File: CA FORM 3.pdf25 Mar 2026
Withdrawal Update Form 1File: form 1.pdf14 Oct 2025
Withdrawal Update Form 2File: Nexus form 2.pdf14 Oct 2025
Withdrawal Update Form 3File: CA FORM 3.pdf14 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf14 Apr 2025
Declaration in FORM BFile: Form B 500 Stamp Paper.pdf10 Mar 2025
Disclosure of sold/ booked inventoryFile: inventory disclosure dec 24.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf22 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24.pdf22 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf26 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 23-24.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf15 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Nehali Certificate.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate DEC 23.pdf15 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate DEC 23.pdf15 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Certificate DEC 23.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: Inventory.pdf23 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf25 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 2.pdf25 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3.pdf25 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf24 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer form 2A 22-23.pdf17 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf10 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 2.pdf10 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3.pdf10 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 01.pdf18 Jan 2023
Building plan approvalFile: Approved IOD.pdf11 Jan 2023
Layout approvalFile: Drawings_00001.pdf11 Jan 2023
Layout approvalFile: Drawings_00002.pdf11 Jan 2023
Layout approvalFile: Drawings_00003.pdf11 Jan 2023
Layout approvalFile: Drawings_00004.pdf11 Jan 2023
PAN CardFile: PAN CARD PROPRITORSHIP.pdf11 Jan 2023
Copy of the legal title reportFile: Title report final.pdf11 Jan 2023
Details of encumbrances concerned to FinanceFile: No encumbrance.pdf11 Jan 2023
Details of encumbrances concerned to LegalFile: No encumbrance.pdf11 Jan 2023
Copy of Layout Approval (in case of layout)File: Drawings_00001.pdf11 Jan 2023
Copy of Layout Approval (in case of layout)File: Drawings_00002.pdf11 Jan 2023
Copy of Layout Approval (in case of layout)File: Drawings_00003.pdf11 Jan 2023
Copy of Layout Approval (in case of layout)File: Drawings_00004.pdf11 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: Approved IOD.pdf11 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: 2358457_FirstCC_signed-1.pdf11 Jan 2023
Declaration about Commencement CertificateFile: CC declaration.pdf11 Jan 2023
Declaration in FORM BFile: Form B promoter.pdf11 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1.pdf11 Jan 2023
CERSAI detailsFile: Cersai declaration.pdf11 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure A disclosure of intrust.pdf11 Jan 2023
Proforma of Agreement for saleFile: Glory - AFS.pdf11 Jan 2023
Proforma of Allotment letterFile: Glory AL.pdf11 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank details letter.pdf11 Jan 2023
Deviation Report with respect to Allotment letterFile: deviation allotment.pdf11 Jan 2023
Deviation Report with respect to model copy of AgreementFile: deviation afs compressed.pdf11 Jan 2023

How this compares with Mumbai Suburban

14%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GLORY APARTMENTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI WEST6,700+ in Mumbai Suburban

Builder: Adnani Constructions

Adnani Constructions has 1 registration on MahaRERA, including GLORY APARTMENTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that GLORY APARTMENTS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if GLORY APARTMENTS is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GLORY APARTMENTS?

The registered promoter entity is Adnani Constructions, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GLORY APARTMENTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GLORY APARTMENTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GLORY APARTMENTS?

The professionals named in the filing: Architect: VIJAY GORADIA; Engineer: PRASAD THUMAR; Engineer: NEXUS; Engineer: PATEL PRASAD ARVIND CHAMPA; Chartered Accountant: NEHALI & CO DOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GLORY APARTMENTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GLORY APARTMENTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GLORY APARTMENTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.