Registered No litigation declared Commercial project

GLOCAL SQUARE LG AND 2ND FLOOR

By GOEL GANGA INFRASTRUCTURE AND REAL ESTATE PVT LTD

RG-MH-01420 · RERA P50500003695 · Last updated on MahaRERA portal: 7 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
15 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 49%
0Complaints at MahaRERAon this registration
Jump to the 106 documents Report an error

GLOCAL SQUARE LG AND 2ND FLOOR is a Commercial project by GOEL GANGA INFRASTRUCTURE AND REAL ESTATE PVT LTD in Nagpur, Maharashtra, registered with MahaRERA as P50500003695 on 6 Aug 2017. Possession is promised by 30 Dec 2026.

At a glance

Project

  • NameGLOCAL SQUARE LG AND 2ND FLOOR
  • TypeCommercial
  • Location
    • ABHYANKAR ROAD
    • SITABURDI
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440012
  • Pincode440012
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500003695
  • ReraGenie IDRG-MH-01420

Builder

  • NameGOEL GANGA INFRASTRUCTURE AND REAL ESTATE PVT LTD
  • Entity typeCompany
  • GSTIN27AACCG4057E1ZT
  • Managing DirectorATUL JAIPRAKASH GOEL
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Aug 2017
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed106 files

Current status

73.1%Work done, per cost certificate

Figures as on 7 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GS-LG-WING A,B AND CNA50000
GS-LG-WING DNA50000
GS-2ND FLOOR- WING A,B AND CNA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 49%.

GS-LG-WING A,B AND C67%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises48%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.49%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.43%
GS-LG-WING D76%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.36%
GS-2ND FLOOR- WING A,B AND C18%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises23%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.38%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.12%

Progress on shared amenities15

As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes46%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,620 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
DILIP MUKUNDRAO BUTY AND OTHERNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNAGPUR IMPROVEMENT TRUST
Permissible FSI12444.69
Proposed, not sanctioned12,445 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch CAMP PUNE 411001
Estimated costRs 99.89 cr
Cost incurredRs 73.01 cr
Work done73.09%
BuildingWingEstimatedIncurred
GS-LG-WING A,B AND CNARs 59.21 crRs 55.26 cr
GS-2ND FLOOR- WING A,B AND CNARs 22.44 crRs 8.30 cr
-NARs 11.48 crRs 5.03 cr
GS-LG-WING DNARs 6.75 crRs 4.42 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAshok Mokha Architects
ArchitectMETAPHOR DESIGN
EngineerANAND SIRSAT
Chartered AccountantA R TATIYA
PartnerRole in project
GOEL GANGA INFRASTRUCTURE AND REAL ESTATE PVT LTD-

Litigation declared20

CaseCourtStatus
845/2015CJSDDESPOSED OFF
741/2015CJJDDESPOSED OFF
1427/2015CJJDDESPOSED OFF
257/2015SMALL CAUSE COURTPENDING
1194/2015CJSDDESPOSED OFF
492/2015SMALL CAUSE COURTDESPOSED OFF
32089/2016SUPREME COURTDISPOSED OFF
33160/2016SUPREME COURTDISPOSED OFF
33004/2016SUPREME COURTDISPOSED OFF
33226/2016SUPREME COURTDISPOSED OFF
34176/2016SUPREME COURTDISPOSED OFF
38036/2016SUPREME COURTDISPOSED OFF
9652,9653/2017SUPREME COURTDISPOSED OFF
5005/2017BOMBAY HIGH COURT NAGPUR BENCHDISPOSED OFF
463/2016M J casesDESPOSED OFF
393/2021ACJMPENDING
159/2023DCDRCPENDING
160/2023DCDRCPENDING
5614/2022ACJMPENDING
5614/2022ACJMPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Oct 2022

Documents filed106

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Glocal Lg 2nd.pdf7 May 2026
Certificates of CA (Form 3)File: LG.pdf25 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LG A.pdf3 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LG E.pdf3 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: LG Q.pdf3 Apr 2025
Certificates of CA (Form 3)File: June 2021.pdf20 Mar 2025
Certificates of CA (Form 3)File: Sept 2021.pdf20 Mar 2025
Certificates of CA (Form 3)File: Dec 2021.pdf20 Mar 2025
Certificates of CA (Form 3)File: 2022_11zon.pdf20 Mar 2025
Certificates of CA (Form 3)File: June 2022.pdf20 Mar 2025
Certificates of CA (Form 3)File: Sept 2022.pdf20 Mar 2025
Certificates of CA (Form 3)File: dec 2022.pdf20 Mar 2025
Certificates of CA (Form 3)File: June 2023.pdf20 Mar 2025
Certificates of CA (Form 3)File: Sept 2023.pdf20 Mar 2025
Certificates of CA (Form 3)File: March 2023.pdf20 Mar 2025
Certificates of CA (Form 3)File: June 2024.pdf20 Mar 2025
Certificates of CA (Form 3)File: Sept 2024.pdf20 Mar 2025
Certificates of CA (Form 3)File: Dec 2024.pdf20 Mar 2025
Certificates of CA (Form 3)File: dec 2023.pdf20 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: LG.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: LG.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: LG.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: LG.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: LG 2A.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: LG.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: LG 2A.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: LG.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: LG.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: LG.pdf20 Feb 2025
Certificates of CA (Form 3)File: LG.pdf30 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LG E.pdf30 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LG E.pdf30 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LG E.pdf30 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LG E.pdf30 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LG E.pdf30 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LG E.pdf30 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LG E.pdf30 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LG E.pdf30 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LG E.pdf30 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LG E.pdf30 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LG.pdf30 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: LG E.pdf30 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: LG Q.pdf30 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: LG Q.pdf30 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: LG.pdf30 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GSM 3RD 2021 MARCH.pdf29 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LG.pdf29 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LG.pdf29 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LG.pdf29 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LG.pdf29 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LG.pdf29 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LG.pdf29 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LG.pdf29 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LG.pdf29 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LG.pdf29 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LG.pdf29 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LG.pdf29 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LG_compressed.pdf29 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LG.pdf29 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LG.pdf29 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: LG.pdf29 Jan 2025
PAN CardFile: WTC Nagpur_PAN CARD.pdf15 Oct 2024
OtherFile: WTC-Incorporation Certificate.pdf15 Oct 2024
OtherFile: Annexure A.pdf15 Oct 2024
Certificates of CA (Form 3)File: WTC.pdf4 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: WTC2021.pdf4 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: WTC 2022.pdf4 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: wtc 2nd floor.pdf13 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: GLOCAL LAYOUT FOR RERA 30-4-2019.pdf24 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WTC LG,2ND_ARCH_30-9-23.pdf16 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: WTC LG, 2ND_ENGG_30-9-23.pdf16 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: WTC LG, 2ND_QUALITY_30-9-23.pdf16 Oct 2023
Other - FinanceFile: WTC GST CERTIFICATE AA2705230078291_RC25052023.pdf26 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GSM Arch LG 2nd.pdf5 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GSM LG 2ND ARCH.pdf5 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: GSM LG 2ND ARCH.pdf5 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GSM ENGG LG 2nd.pdf5 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GSM LG 2ND ENGG.pdf5 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: GSM LG 2ND ENGG.pdf5 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: GSM ENGG LG 2nd.pdf5 Feb 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationRegisteredStatusPromisedDelivered
GANGA DHAM TOWER A..P52100000393BIBVEWADI, PuneJul 2017OngoingApr 2026Not delivered

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GLOCAL SQUARE LG AND 2ND FLOOR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SITABURDI2,800+ in Nagpur

2 kmGLOCAL SQUARE LG AND 2NDCompleted 47Lapsed / revoked 20Other 56Dot size: filed unitsN

Filed coordinates, straight-line distance. 123 registered projects within 2 km.

Builder: GOEL GANGA INFRASTRUCTURE AND REAL ESTATE PVT LTD

GOEL GANGA INFRASTRUCTURE AND REAL ESTATE PVT LTD has 3 registrations on MahaRERA, including GLOCAL SQUARE GROUND AND FIRST FLOOR.. and GLOCAL SQUARE LG AND 2ND FLOOR. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if GLOCAL SQUARE LG AND 2ND FLOOR is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GLOCAL SQUARE LG AND 2ND FLOOR?

The registered promoter entity is GOEL GANGA INFRASTRUCTURE AND REAL ESTATE PVT LTD, a company as per the filing. Its GSTIN 27AACCG4057E1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GLOCAL SQUARE LG AND 2ND FLOOR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GLOCAL SQUARE LG AND 2ND FLOOR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GLOCAL SQUARE LG AND 2ND FLOOR?

The professionals named in the filing: Architect: Ashok Mokha Architects; Architect: METAPHOR DESIGN; Engineer: ANAND SIRSAT; Chartered Accountant: A R TATIYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GLOCAL SQUARE LG AND 2ND FLOOR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GLOCAL SQUARE LG AND 2ND FLOOR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GLOCAL SQUARE LG AND 2ND FLOOR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.