Home / Browse projects / Nagpur, Maharashtra / GLOCAL SQUARE 3 RD FLOOR

Registered No litigation declared Commercial project

GLOCAL SQUARE 3 RD FLOOR

By GOEL GANGA INFRASTRUCTURE AND REAL ESTATE PVT LTD

RG-MH-66560 · RERA P50500025959 · Last updated on MahaRERA portal: 19 Aug 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 9 months from the original
0 of 11Construction stages donefurthest along: Slabs of Super Structure, 59%
1Complaints at MahaRERAon this registration
Jump to the 127 documents Report an error

GLOCAL SQUARE 3 RD FLOOR is a Commercial project by GOEL GANGA INFRASTRUCTURE AND REAL ESTATE PVT LTD in Nagpur, Maharashtra, registered with MahaRERA as P50500025959 on 2 Aug 2020. Possession is promised by 30 Mar 2027. The completion date has moved by 9 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameGLOCAL SQUARE 3 RD FLOOR
  • TypeCommercial
  • Location
    • NEAR ABHYANKAR ROAD
    • SITABURDI
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440012
  • Pincode440012
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500025959
  • ReraGenie IDRG-MH-66560

Builder

  • NameGOEL GANGA INFRASTRUCTURE AND REAL ESTATE PVT LTD
  • Entity typeCompany
  • GSTIN27AACCG4057E1ZT
  • Managing DirectorATUL JAIPRAKASH GOEL
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2020First promiseJun 2026Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Aug 2020
  • Promised completion30 Mar 2027
  • Revised completionRevised to 30 Mar 2027 (originally 30 Jun 2026)
  • Buildings1 building record
  • Documents filed127 files

Current status

31.3%Work done, per cost certificate

Figures as on 19 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GLOCAL SQUARE 3RD FLOOR WING A,B,C,DNA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 59%.

GLOCAL SQUARE 3RD FLOOR WING A,B,C,D: 18% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure59%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises51%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks56%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.34%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.3%

Progress on shared amenities15

As on 19 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes20%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes20%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered72

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,620 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
DILIP MUKUNDRAO BUTY AND OTHERSNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Improvement Trust
Permissible FSI6463.28
Proposed, not sanctioned4,463 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSYNAGAUGE STREET , DINSHAW HOUSE CAMP PUNE 411001
Estimated costRs 25.23 cr
Cost incurredRs 7.89 cr
Work done31.28%
BuildingWingEstimatedIncurred
GLOCAL SQUARE 3RD FLOOR WING A,B,C,DNARs 22.80 crRs 7.88 cr
-NARs 2.43 crRs 1.26 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASHOK MOKHA
EngineerANAND SHIRSAT
Chartered AccountantA R TATIYA
PartnerRole in project
GOEL GANGA INFRASTRUCTURE AND REAL ESTATE PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA21052621053Jun 2026 → Mar 2027

Reason as filed by the promoterProject extension without default on the part of the promoter.The progress and timely completion of the above-mentioned project has been severely affected due to extraordinary and unavoidable circumstances beyond our control, including: 1. War and geopolitical disturbances affecting supply chains and transportation; 2. Acute labour shortage at project sites; 3. Shortage and delayed availability of ready-mix concrete and construction materials; 4. Gas and oil supply disruptions resulting in escalation of transportation and operational costs; 5. Delay in procurement of essential construction inp

Litigation declared11

CaseCourtStatus
845/2015CJSDDESPOSED OFF
741/2015CJJDDESPOSED OFF
1427/2015CJJDDESPOSED OFF
257/2015SMALL CAUSE COURTPENDING
1194/2015CJSDDESPOSED OFF
492/2015SMALL CAUSE COURTDESPOSED OFF
463/2016MJ CASESDESPOSED OFF
159/2023DCDRCPENDING
160/2023DCDRCPENDING
393/2021ACJMPENDING
5614/2022ACJMPENDING

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC004000000090605Mazhar HusainGoel Ganga Infrastructure and Real Estate Pvt Ltd03/05/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jul 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 May 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 May 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Mar 2027

Documents filed127

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 127 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: WTC 3rd Form 1.pdf19 Aug 2026
Withdrawal Update Form 2File: WTC 3rd Form 2.pdf19 Aug 2026
Withdrawal Update Form 3File: 3rd floor.pdf19 Aug 2026
Withdrawal Update Form 1File: WTC 3rd-Arch.pdf21 May 2026
Withdrawal Update Form 1File: WTC 3rd -Arch-Sept2025.pdf21 May 2026
Withdrawal Update Form 1File: WTC 3rd -Arch-Dec 2025.pdf21 May 2026
Withdrawal Update Form 1File: WTC 3rd Form 1.pdf21 May 2026
Withdrawal Update Form 2File: WTC 3rd.pdf21 May 2026
Withdrawal Update Form 2File: WTC 3rd -Engg-Sept2025.pdf21 May 2026
Withdrawal Update Form 2File: WTC 3rd -Engg-Dec 2025.pdf21 May 2026
Withdrawal Update Form 2File: WTC 3rd Form 2.pdf21 May 2026
Withdrawal Update Form 3File: WTC 3rd june.pdf21 May 2026
Withdrawal Update Form 3File: WTC 3rd SEPT.pdf21 May 2026
Withdrawal Update Form 3File: WTC 3rd dec.pdf21 May 2026
Withdrawal Update Form 3File: WTC 3rd.pdf21 May 2026
Form 2A (FY 2025-2026)File: WTC 3rd Form 2A.pdf21 May 2026
Withdrawal Update Form 1File: WTC 3rd Form 1.pdf19 May 2026
Withdrawal Update Form 2File: WTC 3rd Form 2.pdf19 May 2026
Withdrawal Update Form 3File: WTC 3rd.pdf19 May 2026
Form 5 (FY 2025-2026)File: Glocal 3rd.pdf7 May 2026
Other - LegalFile: GLOCAL SQUARE-Legal Notice.pdf22 Jul 2025
Other - LegalFile: GLOCAL SQUARE-Cheque.pdf22 Jul 2025
Other - LegalFile: GLOCAL SQUARE-Payment Received Letter.pdf22 Jul 2025
Other - LegalFile: Cancellation Letter.pdf22 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: WTC 3rd.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3RD A.pdf3 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3RD E.pdf3 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3RD Q.pdf3 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEC 24.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEPT 24.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JUNE 24.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MARCH 2024.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEC 23.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEPT 23.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JUNE 23.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEC 22.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEPT 22.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JUNE 22.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEC 21.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEPT 21.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JUNE 21.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MARCH 23.pdf22 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: WTC 3rd form 5 2024.pdf22 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GSM 3RD SEP 2A.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3RD.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3RD.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3RD.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3RD.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3RD.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3RD.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality certificate -3rd floor RCC.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3RD.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3 2A.pdf20 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: GSM 3RD.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 33.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: WTC 3rd form 3 2024.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3E.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3E.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3E.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3E.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3E.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3E.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3E.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3E.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 E.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3E.pdf29 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 3 Q.pdf29 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3 Q.pdf29 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: WTC 3rd form 5 2024.pdf29 Jan 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationRegisteredStatusPromisedDelivered
GANGA DHAM TOWER A..P52100000393BIBVEWADI, PuneJul 2017OngoingApr 2026Not delivered

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one moved by 9 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GLOCAL SQUARE 3 RD FLOOR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SITABURDI2,800+ in Nagpur

2 kmGLOCAL SQUARE 3 RD FLOORCompleted 21Lapsed / revoked 13Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 36 registered projects within 2 km.

Builder: GOEL GANGA INFRASTRUCTURE AND REAL ESTATE PVT LTD

GOEL GANGA INFRASTRUCTURE AND REAL ESTATE PVT LTD has 3 registrations on MahaRERA, including GLOCAL SQUARE GROUND AND FIRST FLOOR.. and GLOCAL SQUARE LG AND 2ND FLOOR. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if GLOCAL SQUARE 3 RD FLOOR is delayed beyond 30 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GLOCAL SQUARE 3 RD FLOOR?

The registered promoter entity is GOEL GANGA INFRASTRUCTURE AND REAL ESTATE PVT LTD, a company as per the filing. Its GSTIN 27AACCG4057E1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GLOCAL SQUARE 3 RD FLOOR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GLOCAL SQUARE 3 RD FLOOR?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GLOCAL SQUARE 3 RD FLOOR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GLOCAL SQUARE 3 RD FLOOR?

The professionals named in the filing: Architect: ASHOK MOKHA; Engineer: ANAND SHIRSAT; Chartered Accountant: A R TATIYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GLOCAL SQUARE 3 RD FLOOR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GLOCAL SQUARE 3 RD FLOOR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GLOCAL SQUARE 3 RD FLOOR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.