Registration lapsed No litigation declared Residential / Group Housing project

GLOBAL CITY

By DIVINE DEVELOPERS

RG-MH-19962 · RERA P52100012401 · Last updated on MahaRERA portal: 16 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 31 months past the filed date
  • Completion date moved by 33 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2024Possession promised31 months past this date
43 of 55Construction stages doneacross 5 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 53 documents Report an error

GLOBAL CITY is a Residential / Group Housing project by DIVINE DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100012401 on 1 Sep 2017. Possession was promised by 30 Mar 2024 and is now 31 months past that date. The completion date has moved by 33 months from the original filing.

At a glance

Project

  • NameGLOBAL CITY
  • TypeResidential / Group Housing
  • Location
    • Wadagaon (CT)
    • Mawal
    • Pune
    • 412106
  • Pincode412106
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100012401
  • ReraGenie IDRG-MH-19962

Builder

  • NameDIVINE DEVELOPERS
  • Entity typePartnership
  • PartnersASHISH RAJENDRAKUMAR SHAH, PRAKASH VIMALCHAND DHOKA, PRAVIN PREMCHAND KOTHARI
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

31 months past promisethis monthRegisteredSep 2017First promiseJun 2021Revised toMar 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Sep 2017
  • Promised completion30 Mar 2024
  • Revised completionRevised to 30 Mar 2024 (originally 15 Jun 2021)
  • Buildings5 building records
  • Documents filed53 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 1 WING A AND BNA60000
BUILDING 2 WING A AND BNA60000
BUILDING 3NA60000
BUILDING 4 WING A, B, C, D, E AND FNA60000
BUILDING 5 ROW HOUSE A AND BNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 16 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

43 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING 1 WING A AND B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 2 WING A AND B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 3100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 4 WING A, B, C, D, E AND F100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING 5 ROW HOUSE A AND B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed149

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots149
Closed/Covered128
Open Space21
BuildingClosed/CoveredOpen SpaceTotal
BUILDING 1 WING A AND B24024
BUILDING 2 WING A AND B26026
BUILDING 3808
BUILDING 4 WING A, B, C, D, E AND F702191

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
ARJUN BALOBA DHORE AND OTHER 40Wadagaon (CT)Pune

Approvals and building plan

Permissible FSI9535.52
Proposed, not sanctioned7,802 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTALEGAON DABHADE TALUKA MAVAL DIST PUNE

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMILIND POKHARKAR LICENSED SURVEYOR
EngineerJAYANT SHANKAR JOSHI
PartnerRole in project
DIVINE DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100009061Jun 2021 → Dec 2021

Reason as filed by the promoterWe Have Completed Half Project & Obtain occupancy Certificate From Competent Authority For Bldg 1 Wing A & B, Bldg No. 3, Bldg No. 4 Wing A, B, C & D, Those Bldg Are Completed & Have Occupancy Certificate Attached In Document Upload Folder in Completion Certificate Column Remaining Bldg 2 Wing A & B, Bldg No. 4 Wing E & F & Bldg No. 5, Are In Process So We Need Some Extension Time For Those Bldg's Completion.

EXT52100012179Jun 2021 → Mar 2024

Reason as filed by the promoterThe reason for the extension is we did not started the whole project work at the same time instead we started one building work at a time and completed the same on time. but we delayed to complete the whole project work soo we need the extension. we have completed 7 wings from the whole project and also have obtained the completion certificated for the same from competent authority. remaining 4 wings work has also been completed 50 to 70 percent. we have also taken NOC consent from the allottees to whom which we have sold the flats. soo we request you to please allow us the extension. we assur

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Jul 2024

Documents filed53

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 GLOBAL KOTHARI.pdf16 Jan 2025
Other - LegalFile: GLOBAL BUILDING 5.pdf16 Jan 2025
Other - FinanceFile: GLOBAL BUILDING 5.pdf16 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: GLOUBAL.pdf8 Dec 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: GLOUBAL 1.pdf8 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Certificate_R01.pdf3 Jul 2024
Declaration about Commencement CertificateFile: Declaration of CC.pdf18 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Divine__Form_No_5__FY_2020.pdf18 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 2019-20 (1).pdf18 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2020-21 (1).pdf18 Aug 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory.pdf18 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Divine__Form_No_5__FY_2018.pdf18 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Divine__Form_No_5__FY_2019.pdf18 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Divine__Form_No_5__FY_2020.pdf18 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Divine__Form_No_5__FY_2021.pdf18 Aug 2022
Certificates of CA (Form 3)File: CA.pdf3 Mar 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion pmrda.pdf3 Mar 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion TDMC.pdf3 Mar 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch.pdf4 Aug 2018
Certificates of CA (Form 3)File: CA.pdf4 Aug 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect kothari.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: enginer kothari.pdf30 Jul 2017
Proforma of Allotment letterFile: Yaksh PDF.pdf30 Jul 2017
Building plan approvalFile: scan 3-12-min.pdf29 Jul 2017
Building plan approvalFile: scan 4-12-min.pdf29 Jul 2017
Building plan approvalFile: scan 5-12-min.pdf29 Jul 2017
Building plan approvalFile: scan 2-12-min.pdf29 Jul 2017
Building plan approvalFile: scan 6-12-min.pdf29 Jul 2017
Building plan approvalFile: scan 8-12-min.pdf29 Jul 2017
Building plan approvalFile: scan 7-12-min.pdf29 Jul 2017
Building plan approvalFile: scan 9-12-min.pdf29 Jul 2017
Building plan approvalFile: scan 10-12-min.pdf29 Jul 2017
Building plan approvalFile: scan 11-12-min.pdf29 Jul 2017
Building plan approvalFile: scan 12-12-min.pdf29 Jul 2017
Details of encumbrancesFile: ENCUMBRANCE CERTI.pdf29 Jul 2017
Building Plan Approval (IOD)File: scan 2-12-min.pdf29 Jul 2017
Building Plan Approval (IOD)File: scan 3-12-min.pdf29 Jul 2017
Building Plan Approval (IOD)File: scan 4-12-min.pdf29 Jul 2017
Building Plan Approval (IOD)File: scan 5-12-min.pdf29 Jul 2017
Building Plan Approval (IOD)File: scan 6-12-min.pdf29 Jul 2017
Building Plan Approval (IOD)File: scan 7-12-min.pdf29 Jul 2017
Building Plan Approval (IOD)File: scan 8-12-min.pdf29 Jul 2017
Building Plan Approval (IOD)File: scan 9-12-min.pdf29 Jul 2017
Building Plan Approval (IOD)File: scan 10-12-min.pdf29 Jul 2017
Building Plan Approval (IOD)File: scan 11-12-min.pdf29 Jul 2017
Building Plan Approval (IOD)File: scan 12-12-min.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMISSION.pdf29 Jul 2017
Declaration in FORM BFile: AFFADAVIT.pdf29 Jul 2017
Certificates of CA (Form 3)File: C A certificate.pdf29 Jul 2017
Layout approvalFile: scan 1-12.pdf28 Jul 2017
PAN CardFile: divine pan.pdf28 Jul 2017
Copy of the legal title reportFile: SEARCH REPORT.pdf28 Jul 2017
Copy of Layout Approval (in case of layout)File: scan 1-12.pdf28 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 33 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GLOBAL CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadagaon (CT)13,700+ in Pune

2 kmGLOBAL CITYCompleted 20Lapsed / revoked 16Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 53 registered projects within 2 km.

Builder: DIVINE DEVELOPERS

DIVINE DEVELOPERS has 2 registrations on MahaRERA, including GLOBAL CITY and DREAM DIVINE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that GLOBAL CITY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if GLOBAL CITY is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GLOBAL CITY?

The registered promoter entity is DIVINE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GLOBAL CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GLOBAL CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GLOBAL CITY?

The professionals named in the filing: Architect: MILIND POKHARKAR LICENSED SURVEYOR; Engineer: JAYANT SHANKAR JOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GLOBAL CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GLOBAL CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GLOBAL CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.