Home / Browse projects / Mumbai Suburban, Maharashtra / GIRNAR RESIDENCY WING B PHASE 1

Registered No litigation declared Residential / Group Housing project

GIRNAR RESIDENCY WING B PHASE 1

By NIDHAAN REALTY LLP

RG-MH-18112 · RERA P51800056491 · Last updated on MahaRERA portal: 15 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 25.00 crore secured on the land, in favour of HERO HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Staircases, 80%
45 of 68Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

GIRNAR RESIDENCY WING B PHASE 1 is a Residential / Group Housing project by NIDHAAN REALTY LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800056491 on 5 Jun 2024. Possession is promised by 31 Dec 2026. 23 of the 68 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameGIRNAR RESIDENCY WING B PHASE 1
  • TypeResidential / Group Housing
  • Location
    • jijamata road
    • ANDHERI EAST
    • Mogra
    • Andheri
    • Mumbai Suburban
    • 400069
  • Pincode400069
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800056491
  • ReraGenie IDRG-MH-18112

Builder

  • NameNIDHAAN REALTY LLP
  • Entity typePartnership
  • PartnersJAGAT VASANT SHAH, NEHAL MULCHAND SAVLA, RAHUL MOHANLAL SHAH, DILIP KALYANJI SHAH

Key dates

this monthRegisteredJun 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Jun 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed89 files

Current status

34%23 of 68 units booked
63.5%Work done, per cost certificate

Figures as on 15 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GIRNAR RESIDENCY WING B PHASE 1NA211868068

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 80%.

GIRNAR RESIDENCY WING B PHASE 1: 64% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed62

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots62
Closed/Covered62

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area400 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofHERO HOUSING FINANCE LIMITED
Secured amountRs 25.00 crore
CERSAI search filedYes
Declared on18 Jul 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI5025.98
Proposed, not sanctioned5,026 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVISHAL SHOPPING CENTRESIR M V ROAD OPP GYMKHANA ANDHERI EAST MUMBAI 400069
Estimated costRs 31.89 cr
Cost incurredRs 20.25 cr
Work done63.51%
BuildingWingEstimatedIncurred
GIRNAR RESIDENCY WING B PHASE 1NARs 31.89 crRs 20.25 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJAY D Shah
EngineerMr. Abhay Jagat Shah
EngineerShirish Samel
Chartered AccountantHARSH NAGDA & ASSOCIATES
Chartered AccountantM. D. Vora & Co
PartnerRole in project
NIDHAAN REALTY LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Aug 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: NRLLP Form 1 Architect Certificate March 26.pdf15 Apr 2026
Withdrawal Update Form 2File: NRLLP Form 2 Engineer Certificate March 26.pdf15 Apr 2026
Withdrawal Update Form 3File: NRLLP Form 3 CA certificate March 2026.pdf15 Apr 2026
Form 2A (FY 2025-2026)File: NRLLP Form 2 A certifiacte March 2026.pdf15 Apr 2026
Form 5 (FY 2025-2026)File: NRLLP-Form 5 March 2026.pdf14 Apr 2026
Withdrawal Update Form 1File: Nidhaan Realty LLP Form 1 Dec 2025.pdf15 Jan 2026
Withdrawal Update Form 2File: Nidhaan Realty LLP Form 2 Dec 2025.pdf15 Jan 2026
Withdrawal Update Form 3File: Nidhaan Realty LLP Form 3 Dec 2025.pdf15 Jan 2026
Withdrawal Update Form 1File: Nidhaan Realty LLP Form 1 Sep 25.pdf9 Oct 2025
Withdrawal Update Form 2File: Nidhaan Realty LLP Form 2 Sep 25.pdf9 Oct 2025
Withdrawal Update Form 3File: Nidhaan Realty LLP Form 3 Sep 25.pdf9 Oct 2025
Form 2A (FY 2024-2025)File: NR LLP Form 2A March 2025.pdf5 Sep 2025
Form 5 (FY 2024-2025)File: NR LLP Form -5 2024-2025.pdf5 Sep 2025
Form 1File: Form 1 Girnar Residency Dec 24.pdf21 Aug 2025
Form 2File: Form 2 Girnar Residency dec 24.pdf21 Aug 2025
Form 3File: Form 3 Girnar Residency dec 24.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Inventory list Girnar residency B.pdf21 Aug 2025
Form 1File: Form 1.pdf21 Aug 2025
Form 2File: Form 2 (sep 24).pdf21 Aug 2025
Form 3File: From-3 Sep 24.pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: details of sold_booked inventory sep24.pdf21 Aug 2025
Withdrawal Update Form 1File: NR LLP Form- 1 june 2025.pdf21 Aug 2025
Withdrawal Update Form 2File: NR LLP form 2 - june 2025.pdf21 Aug 2025
Withdrawal Update Form 3File: NR LLP Form -3 CA Certificate June 2025.pdf21 Aug 2025
Withdrawal Update Form 1File: NR LLP Form- 1 june 2025.pdf7 Aug 2025
Withdrawal Update Form 2File: NR LLP form 2 - june 2025.pdf7 Aug 2025
Withdrawal Update Form 3File: NR LLP Form -3 CA Certificate June 2025.pdf7 Aug 2025
Commencement certificateFile: Further C.C..pdf5 Aug 2025
Form 1File: NR LLP Form 1 Architect Certificate -March 25.pdf5 Aug 2025
Form 2File: NR LLP Form 2 Engineer Certificate March 25.pdf5 Aug 2025
Form 3File: NR LLP Form 3 March 25.pdf5 Aug 2025
Disclosure of Sold and Booked InventoryFile: NR LLP disclosure of inventory March 25.pdf5 Aug 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Form -5 2024-2025 Girnar residency.pdf16 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: NR LLP Form 2A March 25.pdf15 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: NR LLP form 5.pdf15 Apr 2025
Proforma of Agreement for saleFile: Girnar Residency RERA Agreement.pdf1 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory list Girnar residency B.pdf8 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Girnar Residency dec 24 1 (1).pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Girnar Residency Dec 24.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Girnar Residency dec 24.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Girnar Residency dec 24.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 sep 24.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (sep 24) revised.pdf3 Jan 2025
Details of encumbrances concerned to FinanceFile: encumbrance letter.pdf31 Dec 2024
CERSAI detailsFile: cersai report.pdf31 Dec 2024
Details of encumbrances concerned to LegalFile: encumbrance letter.pdf31 Dec 2024
Proforma of Agreement for saleFile: Final Andheri RERA Agreement 31122024.pdf31 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From-3 Sep 24.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 sep 24.pdf15 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC Mogra.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: details of sold_booked inventory sep24.pdf15 Oct 2024
Other - LegalFile: clarification letter .pdf30 May 2024
Details of encumbrances concerned to FinanceFile: clarification .pdf8 May 2024
Details of encumbrances concerned to LegalFile: clarification .pdf8 May 2024
CERSAI detailsFile: clarification .pdf8 May 2024
Proforma of Agreement for saleFile: clarification .pdf8 May 2024
Proforma of Allotment letterFile: clarification .pdf8 May 2024
Other - LegalFile: clarification .pdf8 May 2024
Other - LegalFile: Nidhaan Realty LLP Partnership Deed (1).pdf2 May 2024
Other - LegalFile: PRC with 70 mutation entry.pdf2 May 2024
Other - LegalFile: index 2 conveyance from vardhman.pdf2 May 2024
Other - LegalFile: Convyance Vardhaman to Nidhaan.pdf2 May 2024
Other - LegalFile: Conveyance datta to NR LLP ScanningFile from NIC (1) (3)_169-end.pdf2 May 2024
Other - TechnicalFile: annexure A (3).pdf19 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: 3 commencement certificate.pdf10 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC NOT SHEET.pdf10 Apr 2024
Declaration about Commencement CertificateFile: declaration of CC.pdf10 Apr 2024
Proforma of Allotment letterFile: final allotment nidhaan.pdf10 Apr 2024
Proforma of Agreement for saleFile: final agreement girnar residency.pdf10 Apr 2024
Deviation Report with respect to Allotment letterFile: deviation report- allotment letter.pdf10 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report - AFS (4)_1-7.pdf10 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report - AFS (4)_8-14.pdf10 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report - AFS (4)_15-end.pdf10 Apr 2024
Layout approvalFile: amended plans 1-3 HIGHLIGHTED.pdf4 Apr 2024
Layout approvalFile: amended plans 4-end.pdf4 Apr 2024
Building plan approvalFile: 5 Amended Approval 11032024.pdf4 Apr 2024
PAN CardFile: Nidhaan Realty LLP Pan Card.pdf4 Apr 2024
Copy of the legal title reportFile: 001 Legal Title Report RERA Nidhan Realty LLP.pdf4 Apr 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance Declaration (1).pdf4 Apr 2024

How this compares with Mumbai Suburban

34%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GIRNAR RESIDENCY WING B PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHERI EAST6,700+ in Mumbai Suburban

2 kmGIRNAR RESIDENCY WING B Completed 125Lapsed / revoked 76Other 143Dot size: filed unitsN

Filed coordinates, straight-line distance. 344 registered projects within 2 km.

Builder: NIDHAAN REALTY LLP

NIDHAAN REALTY LLP has 1 registration on MahaRERA, including GIRNAR RESIDENCY WING B PHASE 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if GIRNAR RESIDENCY WING B PHASE 1 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GIRNAR RESIDENCY WING B PHASE 1?

The registered promoter entity is NIDHAAN REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GIRNAR RESIDENCY WING B PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GIRNAR RESIDENCY WING B PHASE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GIRNAR RESIDENCY WING B PHASE 1?

The professionals named in the filing: Architect: JAY D Shah; Engineer: Mr. Abhay Jagat Shah; Engineer: Shirish Samel; Chartered Accountant: HARSH NAGDA & ASSOCIATES; Chartered Accountant: M. D. Vora & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GIRNAR RESIDENCY WING B PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GIRNAR RESIDENCY WING B PHASE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GIRNAR RESIDENCY WING B PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.