Home / Browse projects / Palghar, Maharashtra / GIRDHARI HEIGHTS

Completed No litigation declared Residential / Group Housing project

GIRDHARI HEIGHTS

By SHREE KRISHNA DEVELOPERS

RG-MH-29775 · RERA P99000029298 · Last updated on MahaRERA portal: 9 Mar 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 16 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Apr 2026Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 85%
23 of 67Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

GIRDHARI HEIGHTS is a Residential / Group Housing project by SHREE KRISHNA DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000029298 on 18 May 2021. The registration is recorded completed; possession was promised by 30 Apr 2026. The completion date has moved by 16 months from the original filing. 44 of the 67 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameGIRDHARI HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • KAMAT PARK
    • V.S MARG
    • VIRAR EAST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401305
  • Pincode401305
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000029298
  • ReraGenie IDRG-MH-29775

Builder

  • NameSHREE KRISHNA DEVELOPERS
  • Entity typePartnership
  • PartnerBHOLANATH SHOBHANATH PATHAK
  • Other registrations11 more →
  • Completed7 of 12
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2021First promiseDec 2024Revised toApr 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 May 2021
  • Promised completion30 Apr 2026
  • Revised completionRevised to 30 Apr 2026 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed81 files

Current status

66%44 of 67 units booked
99.4%Work done, per cost certificate

Figures as on 9 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GIRDHARI HEIGHTS, BUILDING NO 5NA9067067

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 85%.

GIRDHARI HEIGHTS, BUILDING NO 5: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered1
Open Space25

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,339 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 Jul 2025
LandownerVillageDistrict
MAHESH NAGESH KAMATBorivaliMumbai Suburban
MAHESH SITARAM DESAIVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVasai-Virar City Municipal Corporation (VVCMC)
Permissible FSI4322.4
Proposed, not sanctioned4,322 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchG/5,GROUND FLOOR,VIVA COLLEGE ROAD,VIRAR WEST
Estimated costRs 9.70 cr
Cost incurredRs 9.64 cr
Work done99.4%
BuildingWingEstimatedIncurred
GIRDHARI HEIGHTS, BUILDING NO 5NARs 8.24 crRs 8.24 cr
-NARs 1.46 crRs 1.40 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY WADE
EngineerC L CHHEDA
EngineerSuraj Vinod Pathak
Chartered AccountantA K O R D AND CO Dattatray E
Chartered AccountantR V B & Associates
PartnerRole in project
SHREE KRISHNA DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000025978Dec 2024 → Dec 2025

Reason as filed by the promoterWe would like to inform you that the period 2021-2022 was not favourable for real-estate sectors due to the Covid-19 pandemic, frequent lockdown, shortage of building materials and shortage of skilled workers and construction project work were largely affected and project was not ale to complete in time. And we expect some more delay in getting occupancy certificate(OC) from VVCMC. So we request you to extend the Therefore, we request you extend the project completion date up to 30/12/2025

EA20022619930Dec 2024 → Apr 2026

Reason as filed by the promoterWe have availed Occupancy certificate from VVCMC dated 13/01/2026. Since OC dated is beyond project completion date (30/12/2025) we are Appling for the extension project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 May 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 May 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Occupancy certificate Girdhari Heights.pdf9 Mar 2026
Withdrawal Update Form 1File: from 1 SHREE KRISHNA 3RD QRTR.pdf20 Feb 2026
Withdrawal Update Form 2File: from 2 SHREE KRISHNA 3RD QRTR.pdf20 Feb 2026
Withdrawal Update Form 3File: Form 3 Girdhari heights 3rd QRTR.pdf20 Feb 2026
Withdrawal Update Form 1File: Form 1 shree krishna qrtr 2.pdf6 Dec 2025
Withdrawal Update Form 1File: Form 1 shree krishna qrtr 2.pdf6 Dec 2025
Withdrawal Update Form 2File: Form no 2 Shree Krishna developers.pdf6 Dec 2025
Withdrawal Update Form 2File: Form no 2 Shree Krishna developers.pdf6 Dec 2025
Withdrawal Update Form 3File: form 3 Girdhari Heights 2nd QRTR.pdf6 Dec 2025
Withdrawal Update Form 3File: form 3 Girdhari Heights 2nd QRTR.pdf6 Dec 2025
Form 5 (FY 2024-2025)File: form 5 shree krishna 2024-25.pdf3 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A Shree krishna.pdf1 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form no 3 March 2025 ShreeKrishna.pdf19 Apr 2025
Declaration in FORM BFile: Form B Promoter Shreekrishna.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shreekrishna (2)_compressed.pdf2 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold inventory Shreekrishna.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 shree krishna June 2024_compressed.pdf12 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 shree krishna September 2024_compressed.pdf12 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 shree krishna December 2024_compressed.pdf12 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shree krishna March 2024.pdf1 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shree krishna June 2024.pdf1 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shree krishna September 2024.pdf1 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form no 2 Shree krishna December 2024.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shreekrishna March 2024.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shreekrishna June 2024.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shreekrishna September 2024.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shreekrishna December 2024.pdf25 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM NO 5hreekrishna.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 shreekrishna.pdf11 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form no 1.pdf1 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form no 2.pdf1 Jan 2025
Details of encumbrances concerned to FinanceFile: Encumbrances to Legal.pdf25 Dec 2024
Proforma of Allotment letterFile: Allotement model.pdf25 Dec 2024
Declaration in FORM BFile: Form B Shree Krishna.pdf25 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold booked inventory Shrii Krishna.pdf25 Dec 2024
Declaration about Commencement CertificateFile: CC Declartion Shree Krishna.pdf25 Dec 2024
CERSAI detailsFile: CERSAI Reports Shree Krisnha.pdf25 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Bank dtls Shree Krisnha.pdf25 Dec 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment.pdf25 Dec 2024
Details of encumbrances concerned to LegalFile: Encumbrances to Legal.pdf25 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Devation Agreement.pdf25 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Promoters Disclosure Shree Krishna.pdf25 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold shreekrishna.pdf17 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A(3).pdf18 May 2024
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory Shri krishna.pdf1 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 Shreekrishna.pdf14 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer from 2 (1).pdf14 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 Shreekrishna.pdf12 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect form 1 Shree Krishna.pdf7 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold inventory Shree krishna (2).pdf31 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3 SHREE KRISHNA.pdf31 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A shrikrishna.pdf17 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold inventory shree krishna.pdf17 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1 shree krishna developers.pdf16 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 2 shree krishna developers.pdf16 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22 Shree Krishna.pdf27 Oct 2022
Proforma of Agreement for saleFile: Shree Krishna Developers Agreement - Girdhari Heights draft.pdf27 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June2022.pdf12 Jul 2022
Declaration about Commencement CertificateFile: Form Declaration 8flr shreekrishna dvlprs.pdf9 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 090622 shreekrishna dvlprs.pdf9 Jul 2022
Disclosure of sold/ booked inventoryFile: Shree krishna Sold Unsold Data 2022.pdf9 Jul 2022
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY 18112021 shree krishna.pdf18 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHREE KRISHNA FORM 3.pdf2 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1st Qartr Form 1 Architect Shree Krishna.pdf14 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1st qartr form 2 Engineer shree krishna.pdf14 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: C C2 SHREE KRISHNA.pdf7 May 2021
Commencement Certificates / NA Order for plotted developmentFile: revised cc girdhar final.pdf7 May 2021
Copy of the legal title reportFile: TITLE REPORT FINAL.pdf5 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE GIRDHAR.pdf1 May 2021
PAN CardFile: PANCARD SHREEKRISHNA.pdf17 Apr 2021
Details of encumbrancesFile: NON ENCUMBRANCE SHREEKRISHNA.pdf17 Apr 2021
Declaration in FORM BFile: PROMOTER FORM B.pdf17 Apr 2021
Proforma of Allotment letterFile: ALLTMNT SALES AGMNT SHREE.pdf17 Apr 2021
Layout approvalFile: SHREEKRISHNA plan1.PDF14 Apr 2021
Building plan approvalFile: SHREEKRISHNA plan 2.pdf14 Apr 2021
Copy of the legal title reportFile: TITLE REPORTS SHREE KRISHNA.pdf14 Apr 2021
Copy of Layout Approval (in case of layout)File: SHREEKRISHNA plan1.PDF14 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: SHREEKRISHNA plan 2.pdf14 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: C C1 SHREE KRISHNA.pdf14 Apr 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH SHREE KRISHNA.pdf14 Apr 2021

How this compares with Palghar

66%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 16 months
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GIRDHARI HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIRAR EAST3,200+ in Palghar

2 kmGIRDHARI HEIGHTSCompleted 76Lapsed / revoked 49Other 84Dot size: filed unitsN

Filed coordinates, straight-line distance. 209 registered projects within 2 km.

Builder: SHREE KRISHNA DEVELOPERS

SHREE KRISHNA DEVELOPERS has 12 registrations on MahaRERA, including SHREE KRISHNA HEIGHTS and SUNFLOWER. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if GIRDHARI HEIGHTS is delayed beyond 30 Apr 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GIRDHARI HEIGHTS?

The registered promoter entity is SHREE KRISHNA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GIRDHARI HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GIRDHARI HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GIRDHARI HEIGHTS?

The professionals named in the filing: Architect: AJAY WADE; Engineer: C L CHHEDA; Engineer: Suraj Vinod Pathak; Chartered Accountant: A K O R D AND CO Dattatray E; Chartered Accountant: R V B & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GIRDHARI HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GIRDHARI HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GIRDHARI HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.