ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / GHATKOPAR AVENUE AARADHYA ONE EARTH PHASE I

Completed No litigation declared Others project

GHATKOPAR AVENUE AARADHYA ONE EARTH PHASE I

By MAN REALTORS AND HOLDINGS PRIVATE LIMITED

RG-MH-28066 · RERA P51800024676 · Last updated on MahaRERA portal: 6 Jan 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
79 of 88Construction stages doneacross 8 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 258 documents Report an error

GHATKOPAR AVENUE AARADHYA ONE EARTH PHASE I is a Others project by MAN REALTORS AND HOLDINGS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800024676 on 28 Feb 2020. The registration is recorded completed; possession was promised by 30 Mar 2025.

At a glance

Project

  • NameGHATKOPAR AVENUE AARADHYA ONE EARTH PHASE I
  • TypeOthers
  • Location
    • AMBEDKAR CIRCLE
    • PANT NAGAR
    • Kurla
    • Mumbai Suburban
    • 400075
  • Pincode400075
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800024676
  • ReraGenie IDRG-MH-28066

Builder

  • NameMAN REALTORS AND HOLDINGS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsSUKETU RAMESH SHAH, MANAN PARAG SHAH, ASHOK MANHARLAL MEHTA, AMIT PRAVINCHANDRA BHANSALI
  • Other registrations5 more →
  • Completed6 of 6

Key dates

this monthRegisteredFeb 2020PromisedMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Feb 2020
  • Promised completion30 Mar 2025
  • Revised completionNone
  • Buildings8 building records
  • Documents filed258 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER A - AVIONNA210000
TOWER C - CASANA210000
TOWER D - DEWNA210000
REHAB TOWER 1 - ALPHANA220000
REHAB TOWER 2 - BREEZENA220000
REHAB TOWER 3 - CORALNA220000
REHAB TOWER 4 - DELTANA220000
REHAB TOWER 5 - EVENA220000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 6 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

79 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Podiums (if any), at 0%.

TOWER A - AVION91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER C - CASA91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
TOWER D - DEW82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
REHAB TOWER 1 - ALPHA91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
REHAB TOWER 2 - BREEZE91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
REHAB TOWER 3 - CORAL91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
REHAB TOWER 4 - DELTA91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
REHAB TOWER 5 - EVE91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes70%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed294

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots294
Closed/Covered294
BuildingClosed/CoveredTotal
TOWER A - AVION9090
TOWER C - CASA4747
TOWER D - DEW4545
REHAB TOWER 1 - ALPHA2828
REHAB TOWER 2 - BREEZE2929
REHAB TOWER 3 - CORAL1717
REHAB TOWER 4 - DELTA2525
REHAB TOWER 5 - EVE1313

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,365 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI40000.0
Proposed, not sanctioned40,000 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKAILAS PLAZA, GHATKOPAR EAST, MUMBAI- 400077

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
MAN REALTORS AND HOLDINGS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Aug 2023

Documents filed258

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 258 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrancesFile: Declaration on Finance Encumbrances 28122023 Entire Loan Repaid.pdf6 Jan 2024
Details of encumbrancesFile: Declaration on Finance Encumbrances Updated GAAOE ICICI 08112023 30Cr.pdf9 Nov 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 01082023.pdf14 Sep 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 GAAOE Phase 1.pdf6 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Tower D.pdf10 Aug 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 19072023.pdf27 Jul 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 24072023.pdf27 Jul 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 25072023.pdf27 Jul 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 26072023.pdf27 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 31032023.pdf20 Jul 2023
CERSAI detailsFile: CERSAI 30062023 (Corrected).pdf18 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 30062023.pdf17 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold 30062023.pdf17 Jul 2023
CERSAI detailsFile: CERSAI 30062023.pdf17 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY 202223.pdf13 Jul 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 15062023.pdf13 Jul 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 19062023.pdf13 Jul 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 23062023.pdf13 Jul 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 03072023.pdf13 Jul 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 07072023.pdf13 Jul 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 11072023.pdf13 Jul 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 13072023.pdf13 Jul 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 01062023.pdf13 Jun 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 02062023.pdf13 Jun 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 06062023.pdf13 Jun 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 26052023.pdf30 May 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 29052023.pdf30 May 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 18052023.pdf24 May 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 19052023.pdf24 May 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 23052023.pdf24 May 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 24052023.pdf24 May 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 06052023.pdf16 May 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 08052023.pdf16 May 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 10052023.pdf16 May 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 15052023.pdf16 May 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 25042023.pdf6 May 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 29042023.pdf6 May 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 02052023.pdf6 May 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 04052023.pdf6 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Declaration for Annual Audit Report of Statutory CA (Form 5) for FY 2017 18 and FY 2018 1928 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Declaration for Annual Audit Report of Statutory CA (Form 5) for FY 2017 18 and FY 2018 1928 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 31032020.pdf28 Apr 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 21042023.pdf25 Apr 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 24042023.pdf25 Apr 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 12042023.pdf21 Apr 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 13042023.pdf21 Apr 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 15042023.pdf21 Apr 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 17042023.pdf21 Apr 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 18042023.pdf21 Apr 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 19042023.pdf21 Apr 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 20042023.pdf21 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31032023.pdf18 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A FY 2021 22.pdf18 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 31032023.pdf18 Apr 2023
Disclosure of sold/ booked inventoryFile: Wing D Unsold and Sold 31032023.pdf18 Apr 2023
CERSAI detailsFile: CERSAI 14042023.pdf18 Apr 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 05042023.pdf12 Apr 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 06042023.pdf12 Apr 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 10042023.pdf12 Apr 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 11042023.pdf12 Apr 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 27032023.pdf5 Apr 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 29032023.pdf5 Apr 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 31032023.pdf5 Apr 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 03042023.pdf5 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 22.pdf23 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 22.pdf23 Mar 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 17032023.pdf23 Mar 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 18032023.pdf23 Mar 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 21032023.pdf23 Mar 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 13032023.pdf17 Mar 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 14032023.pdf17 Mar 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 13022023.pdf13 Mar 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 14022023.pdf13 Mar 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 15022023.pdf13 Mar 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 16022023.pdf13 Mar 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 17022023.pdf13 Mar 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 20022023.pdf13 Mar 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 21022023.pdf13 Mar 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 22022023.pdf13 Mar 2023
Other - FinanceFile: Rqst Ltr for Withdrawal 23022023.pdf13 Mar 2023

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GHATKOPAR AVENUE AARADHYA ONE EARTH PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANT NAGAR6,700+ in Mumbai Suburban

2 kmGHATKOPAR AVENUE AARADHYCompleted 42Lapsed / revoked 14Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 73 registered projects within 2 km.

Builder: MAN REALTORS AND HOLDINGS PRIVATE LIMITED

MAN REALTORS AND HOLDINGS PRIVATE LIMITED has 6 registrations on MahaRERA, including GHATKOPAR AVENUE AARADHYA ONE EARTH PHASE I and GHATKOPAR AVENUE AARADHYA ONE EARTH PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if GHATKOPAR AVENUE AARADHYA ONE EARTH PHASE I is delayed beyond 30 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GHATKOPAR AVENUE AARADHYA ONE EARTH PHASE I?

The registered promoter entity is MAN REALTORS AND HOLDINGS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GHATKOPAR AVENUE AARADHYA ONE EARTH PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GHATKOPAR AVENUE AARADHYA ONE EARTH PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in GHATKOPAR AVENUE AARADHYA ONE EARTH PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GHATKOPAR AVENUE AARADHYA ONE EARTH PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GHATKOPAR AVENUE AARADHYA ONE EARTH PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.