Home / Browse projects / Mumbai Suburban, Maharashtra / GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED

Registered No litigation declared Residential / Group Housing project

GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED

By GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED

RG-MH-75638 · RERA P51800048383 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedmoved 24 months from the original
3 of 11Construction stages donefurthest along: Internal walls, 90%
42 of 56Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 135 documents Report an error

GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED is a Residential / Group Housing project by GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800048383 on 3 Jan 2023. Possession is promised by 31 Jul 2027. The completion date has moved by 24 months from the original filing. 14 of the 56 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameGET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED
  • TypeResidential / Group Housing
  • Location
    • MILITARY ROAD
    • MAROL
    • Andheri
    • Mumbai Suburban
    • 400059
  • Pincode400059
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800048383
  • ReraGenie IDRG-MH-75638

Builder

  • NameGET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED
  • Entity typeSociety
  • SecretoryDHIRAJLAL MAGANLAL SHETH

Key dates

this monthRegisteredJan 2023First promiseJul 2025Revised toJul 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Jan 2023
  • Promised completion31 Jul 2027
  • Revised completionRevised to 31 Jul 2027 (originally 31 Jul 2025)
  • Buildings1 building record
  • Documents filed135 files

Current status

25%14 of 56 units booked
92.0%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITEDNA77431356

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED: 49% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Closed/Covered54

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,738 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jul 2025
LandownerVillageDistrict
GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITEDAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI38349.0
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAROL MAROSHI ROAD, ANDHERI EAST, MUMBAI - 400059
Estimated costRs 27.00 cr
Cost incurredRs 24.83 cr
Work done91.95%
BuildingWingEstimatedIncurred
GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITEDNARs 21.00 crRs 22.38 cr
-NARs 6.00 crRs 2.45 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANJAY JADHAV
EngineerSHAHNAWAZ NIYAZ AHMED SIDDIQUI
EngineerBILAL MS LAKDAWALA
Chartered AccountantA B C & ASSOCIATES
PartnerRole in project
GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA30072502249Jul 2025 → Jul 2027

Reason as filed by the promoterPromoter has applied for Floor rise and Revalidation of CC

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000591031ASHOK KUMAR MOOLCHAND BAPNAGET TOGETHER CO OPERATIVE HOUSING SOCIETY LTD05/07/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2027

Documents filed135

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 135 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate.pdf20 Jul 2026
Withdrawal Update Form 2File: 2026-07-17_Form 2 Engineer Certificate_GTG_Updated.pdf20 Jul 2026
Withdrawal Update Form 3File: GET TOGETHER RERA CERTIFICATE Form 3_June 2026_1.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate-GetTogether.pdf20 Apr 2026
Withdrawal Update Form 3File: GET TOGETHER RERA CERTIFICATE Form 3_March 2026.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate_Q3.pdf20 Jan 2026
Withdrawal Update Form 3File: GET TOGETHER RERA CERTIFICATE Form 3_Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 1File: Architect Application Letter.pdf13 Jan 2026
Withdrawal Update Form 2File: Form 2_2025-26_Q2.pdf13 Jan 2026
Withdrawal Update Form 3File: GET TOGETHER RERA CERTIFICATE Form 3_Sept 2025.pdf13 Jan 2026
Form 5 (FY 2024-2025)File: Form 5_Get Together 31032025.pdf24 Oct 2025
Withdrawal Update Form 1File: Architect Application Letter.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2_2025-26_Q2.pdf18 Oct 2025
Withdrawal Update Form 3File: GET TOGETHER RERA CERTIFICATE Form 3_Sept 2025.pdf18 Oct 2025
Form 2A (FY 2024-2025)File: Form2A_Get Together 2024-25.pdf30 Jul 2025
Form 2A (FY 2023-2024)File: 5_Form_2A_Jan 24-April 2024.pdf30 Jul 2025
Form 2A (FY 2022-2023)File: 2_Form 2A_Get Together - Jan23 to Mar23.pdf30 Jul 2025
Form 5 (FY 2022-2023)File: Form 5_Get Together 2022-23.pdf30 Jul 2025
Form 1File: Form 1_Q4 2024-25_Architect.pdf29 Jul 2025
Form 2File: 5_Form_2A_APRIL2025 docx[1] Signed.pdf29 Jul 2025
Form 3File: GET TOGETHER RERA CERTIFICATE Form 3_March 2025.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold ,Booked Inventory -Building.pdf29 Jul 2025
Self-declaration of Quarterly ProgressFile: Self Declaration Get Together.pdf29 Jul 2025
Form 1File: Form 1_Architects Certificate Signed.pdf29 Jul 2025
Form 2File: 5_Engineer_Certificate_ Dec 2024-Jan 25.pdf29 Jul 2025
Form 3File: GET TOGETHER RERA CERTIFICATE Form 3_March 2025.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold ,Booked Inventory -Building.pdf29 Jul 2025
Self-declaration of Quarterly ProgressFile: Self Declaration Get Together.pdf29 Jul 2025
Form 1File: Form 1_Get Together_Q2_2024-25.pdf29 Jul 2025
Form 2File: Form 2_Get Together_Q2_2024-25.pdf29 Jul 2025
Form 3File: Form 3_Get Together Quarter 1_2024-25.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold ,Booked Inventory -Building.pdf29 Jul 2025
Form 1File: 5_Form_2A April24-June 2024 (1).pdf29 Jul 2025
Form 2File: 5_Engineer Certificate_APRIL2024-JUNE 24 (1).pdf29 Jul 2025
Form 3File: Form 3_Get Together Quarter 1_2024-25.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold ,Booked Inventory -Building.pdf29 Jul 2025
Form 1File: Architect Certificate.pdf29 Jul 2025
Form 2File: 5_Engineer Certificate_JAN 2024-April 24.pdf29 Jul 2025
Form 3File: GET TOGETHER RERA CERTIFICATE Form 3_March 2024.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold ,Booked Inventory -Building.pdf29 Jul 2025
Form 1File: Architect Certificate 08 01 2024 final signed.pdf29 Jul 2025
Form 2File: Form 2_Engineer Certificate_Oct23 to Dec23.pdf29 Jul 2025
Form 3File: GET TOGETHER RERA CERTIFICATE Form 3_Dec 2023.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold ,Booked Inventory -Building.pdf29 Jul 2025
Form 1File: Architect Certificate 08 01 2024 final signed.pdf29 Jul 2025
Form 2File: Form 2_Engineer Certificate_Oct23 to Dec23.pdf29 Jul 2025
Form 3File: GET TOGETHER RERA CERTIFICATE Form 3_Dec 2023.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold ,Booked Inventory -Building.pdf29 Jul 2025
Form 1File: Architect Certificate 01 04 2023 signed.pdf29 Jul 2025
Form 2File: 3_Engineer Certificate_Apr23 to Jun23.pdf29 Jul 2025
Form 3File: GET TOGETHER RERA CERTIFICATE Form 3_June 2023.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold ,Booked Inventory -Building.pdf29 Jul 2025
Form 1File: Architect Certificate 01 01 2023 signed.pdf29 Jul 2025
Form 2File: 2_Engineer Certificate_Jan23 to Mar23.pdf29 Jul 2025
Form 3File: GET TOGETHER RERA CERTIFICATE Form 3_Mar 2023.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold ,Booked Inventory -Building.pdf29 Jul 2025
Form 1File: Architect Certificate 16 07 2025 signed.pdf20 Jul 2025
Form 2File: Form 2 Engineer Certificate-signed.pdf20 Jul 2025
Form 3File: Form 3_GET TOGETHER RERA CERTIFICATE_June 2025.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold ,Booked Inventory -Building.pdf20 Jul 2025
Self-declaration of Quarterly ProgressFile: Self Declaration Get Together.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q4 2024-25_Architect.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GET TOGETHER RERA CERTIFICATE Form 3_March 2025.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architects Certificate Signed.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5_Engineer_Certificate_ Dec 2024-Jan 25.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Get Together_Q2_2024-25.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GET TOGETHER RERA CERTIFICATE Form 3_June 2024.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5_Engineer_Certificate_july24_to_sept24 (1).pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 5_Form_2A_JULY- SEPT 2024 docx (1).pdf18 Oct 2024
Layout approvalFile: Drawing-1-4.pdf17 Oct 2024
Layout approvalFile: Drawing-5-7.pdf17 Oct 2024
Copy of Layout Approval (in case of layout)File: Drawing-1-4.pdf17 Oct 2024
Copy of Layout Approval (in case of layout)File: Drawing-5-7.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA COMPLETION OF WORK 13 07 2024 signed.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5_Engineer Certificate_APRIL2024-JUNE 24 (1).pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 5_Form_2A April24-June 2024 (1).pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Get Together Quarter 1_2024-25.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf19 Apr 2024

How this compares with Mumbai Suburban

25%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GET TOGETHER CO OPERATIVE HOUSING SOCIETY LI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAROL6,700+ in Mumbai Suburban

2 kmGET TOGETHER CO OPERATIVCompleted 44Lapsed / revoked 22Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 110 registered projects within 2 km.

Builder: GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED

GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED has 1 registration on MahaRERA, including GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED is delayed beyond 31 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED?

The registered promoter entity is GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED, a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED?

The professionals named in the filing: Architect: SANJAY JADHAV; Engineer: SHAHNAWAZ NIYAZ AHMED SIDDIQUI; Engineer: BILAL MS LAKDAWALA; Chartered Accountant: A B C & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GET TOGETHER CO OPERATIVE HOUSING SOCIETY LI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.