Home / Browse projects / Udupi, Karnataka / Genesis
Genesis
RG-KA-87212 · RERA PRM/KA/RERA/1273/318/PR/180523/001803 · Last updated on RERA Karnataka portal: Not stated
Source: official RERA Karnataka filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No complaints on record
- Separate project account declared
Saved.
Genesis is a Mixed Development project by Santhosh Sanjith Maben in Udupi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1273/318/PR/180523/001803 on 23 May 2018. Possession is promised by 30 Jun 2020. The completion date has moved by 12 months from the original filing. 0 of the 30 units on this registration are recorded sold or booked, and 0 of 15 construction stages are filed complete.
At a glance
Project
- NameGenesis
- TypeMixed Development
- Location
- Udupi
- PincodeNot stated
- RERA no.PRM/KA/RERA/1273/318/PR/180523/001803
- ReraGenie IDRG-KA-87212
Builder
- NameSanthosh Sanjith Maben
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on23 May 2018
- Promised completion30 Jun 2020
- Revised completionRevised to 30 Jun 2020 (originally 30 Jun 2019)
- Buildings1 building record
- Documents filed52 files
Current status
Figures as on Not stated, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Genesis | - | - | - | - | - | 30 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on Not stated, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 15 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 0%.
Building: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | Not applicable |
| Painting | - |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per santioned drawings | Not applicable |
Progress on shared amenities41
As on Not stated, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Sewage and Drainage System | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Water conservation | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | No | Not applicable |
| Use of renewable energy | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Gas | Yes | - |
| Water and Sanitation | No | Not applicable |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas and common storage spaces | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Kumarchandra M.R |
| Engineer | K Anil Hegde |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterShortage of Building Materials, Concrete, Jalli etc
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed52
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1273/318/PR/180523/001803 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect Certificate for Work Completion Schedule till DateFile: Archcert WS.pdf | - |
| CA Certificate for Funds UtilizationFile: CAcert FU2.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: Archcert PW.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: CAcert FR2.pdf | - |
| AffidavitFile: Affidavit for extension of project registration.pdf | - |
| Latest Encumbrance CertificateFile: Encumbrance cert 2019.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails Ext.xlsx | - |
| Document 1File: Declaration form.pdf | - |
| Document 2File: template6.pdf | - |
| Document 3File: 02071010000524 Synd.pdf | - |
| Document 4File: vijaya bank statement.pdf | - |
| Document 5File: Silas Developers (Vijaya bank statement)-.pdf | - |
| commencement cert | - |
| Approval Plan Scanned 5MB | - |
| approved layout plan | - |
| Sale deed | - |
| Agreement for Sale | - |
| Sale deed | - |
| APPROVED BUILD PLAN | - |
| approved layout plan | - |
| land doc location | - |
| BROCHURE | - |
| Document 1_1 | - |
| EC updated | - |
| Khata | - |
| land doc location | - |
| approved layout plan | - |
| APPROVED BUILD PLAN | - |
| rtc 1 | - |
| Balance Sheet 2016 - 2017File: B S 2016-17.pdf | - |
| Balance Sheet 2015 - 2016File: Balancesheet 2016.pdf | - |
| Balance Sheet 2014 - 2015File: na_1703201812384700.pdf | - |
| Audited Profit and Loss Statement 2016 - 2017File: pl 17_1603201813350800.pdf | - |
| Audited Profit and Loss Statement 2015 - 2016File: P&L Ac2016.pdf | - |
| Audited Profit and Loss Statement 2014 - 2015File: na_1703201812384700.pdf | - |
| Director's Report 2016 - 2017File: na_1703201812384700.pdf | - |
| Director's Report 2015 - 2016File: na_1703201812384700.pdf | - |
| Director's Report 2014 - 2015File: na_1703201812384700.pdf | - |
| Cash Flow Statement 2016 - 2017File: na_1703201812384700.pdf | - |
| Cash Flow Statement 2015 - 2016File: na_1703201812384700.pdf | - |
| Auditor's Report 2016 - 2017File: na_1703201812384700.pdf | - |
| Auditor's Report 2015 - 2016File: na_1703201812384700.pdf | - |
| Auditor's Report 2014 - 2015File: na_1703201812384700.pdf | - |
| Income Tax Return Acknowledgement 2016 - 2017File: itr 17.pdf | - |
| Income Tax Return Acknowledgement 2015 - 2016File: ITR.pdf | - |
| Income Tax Return Acknowledgement 2014 - 2015File: na_1703201812384700.pdf | - |
| form b 1 | - |
| Prospectus/BrochureFile: RERA Advertise Scan.pdf | - |
| Advertisement Copy 1File: RERA Advertise Scan.pdf | - |
| Tower Excel SheetFile: PRM_KA_RERA_1273_318_PR_180523_001803 (2).xlsx | - |
| Occupancy CertificateFile: Occupancy&taxreceipts.pdf | - |
| Completion certificateFile: Occupancy&taxreceipts.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Udupi
Computed across the 260+ Udupi projects on ReraGenie, from their own filings.
Keep Genesis on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Udupi260+ in Udupi
GRASSLANDS - LAKESIDE
GRAZLANZ PROPERTIES LLP
MANDAVI DOWNTOWN
MANDAVI CONSTRUCTIONS
KIRTHI PALMVILLE PHASE II
KIRTHI CONSTRUCTION
RAINTREE
VINIT S AMIN
MANDAVI ROYAL GARDEN
MANDAVI INFRASTRUCTURES
Mandavi Casa Grande
J J Builders and Developers
See every Udupi project, with the district possession charts
Builder: Santhosh Sanjith Maben
Santhosh Sanjith Maben has 1 registration on RERA Karnataka, including Genesis. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Udupi district page.
Frequently asked questions
What are my rights if Genesis is delayed beyond 30 Jun 2020?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Genesis?
The registered promoter entity is Santhosh Sanjith Maben. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Genesis?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Genesis?
The professionals named in the filing: Architect: Kumarchandra M.R; Engineer: K Anil Hegde. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Genesis?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback