Geetanjali A Apartment
By Sarthak Housing Development Corporation Unit -3
RG-MH-98895 · RERA P52100049213 · Last updated on MahaRERA portal: 8 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 3 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Geetanjali A Apartment is a Others project by Sarthak Housing Development Corporation Unit -3 in Pune, Maharashtra, registered with MahaRERA as P52100049213 on 3 Feb 2023. Possession is promised by 30 Jun 2027. The completion date has moved by 12 months from the original filing. 4 of the 13 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- NameGeetanjali A Apartment
- TypeOthers
- Location
- SAHAKAR NAGAR
- PARVATI
- Haveli
- Pune
- 411009
- Pincode411009
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100049213
- ReraGenie IDRG-MH-98895
Builder
- NameSarthak Housing Development Corporation Unit -3
- Entity typePartnership
- GSTIN27AEQFS0264J1ZL
- PartnerSnehal Gaurav deo
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Feb 2023
- Promised completion30 Jun 2027
- Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2026)
- Buildings1 building record
- Documents filed116 files
Current status
Figures as on 8 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Geetanjali A Apartment | NA | 4 | 4 | 13 | 0 | 13 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
Geetanjali A Apartment: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 8 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed42
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership15
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Mr Shamrao Pawar | Parvati | Pune |
| Mr Sham Baburao Joshi | Parvati | Pune |
| Mrs Madhumalati V Atre | Parvati | Pune |
| Mr Amit V Atre | Parvati | Pune |
| Mr. Rajeev Sadashiv kulkarni | Parvati | Pune |
| Mr Ameya Kolhe | Parvati | Pune |
| Mrs Prachi Basu | Parvati | Pune |
| Mr Sanjeev Bhimsen Badami | Parvati | Pune |
| Mrs hemalata Rajendra Kulkarni | Parvati | Pune |
| Mrs Shanti Viswanathan | Parvati | Pune |
| Mr Omkar Bramhe | Parvati | Pune |
| Mrs Sunita Bramhe | Parvati | Pune |
| Mrs Swarada Omkar Bramhe | Parvati | Pune |
| Mrs Ranjana Yashwant Patwardhan | Parvati | Pune |
| Durga Mahila Patsanstha | Parvati | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR MANGESH GOTAL |
| Engineer | SADASHIV LOHOKARE |
| Chartered Accountant | SPAK & CO |
| Chartered Accountant | Supriya Abhijit Mundada |
| Chartered Accountant | GMKS and Co |
| Partner | Role in project |
|---|---|
| Sarthak Housing Development Corporation Unit -3 | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. Sudden and steep hikes in the prices of steel, cement, and fuel created financial constraints for the contractors. This resulted in temporary work stoppages and difficulties in procuring materials at previously budgeted rates. 2. Financial Constraints and Lack of Liquidity: As per the RERA framework, project construction is primarily funded through the 70% realization from allottees. Due to the lack of bookings and zero sales, there has been a complete absence of cash inflow into the project’s designated RERA bank account. This financial crunch has hindered our ability to maintain the plann
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600005 | Ram Gawali | Sarthak Housing Development Corporation Unit -3 | 06/01/2026 |
| SM12600007 | Ram Gawali | Sarthak Housing Development Corporation Unit -3 | 06/01/2026 |
| CC12602183 | RANJANA YESHWANT PATWARDHAN | Sarthak Housing Development Corporation Unit -3 | 14/04/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Jan 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Dec 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2027
Documents filed116
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 116 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1- Architect Certificate SHDC Unit 3 Upto 31st March 2026.pdf | 8 May 2026 |
| Form 2File: Form 2 RERA Engineer Certificate SHDC Unit 3 upto 31st March 2026.pdf | 8 May 2026 |
| Form 3File: Form 3- CA Certificate- SHDC Unit 3 Upto 31st March 2026.pdf | 8 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Upto 31st March 2026.pdf | 8 May 2026 |
| Form 2A (FY 2022-2023)File: Form 2A- SHDC Unit 3- FY 22-23.pdf | 17 Mar 2026 |
| Form 2A (FY 2023-2024)File: Form 2A- SHDC Unit 3- FY 23-24.pdf | 17 Mar 2026 |
| Form 2A (FY 2024-2025)File: Form 2A- SHDC Unit 3- FY 24-25.pdf | 17 Mar 2026 |
| Form 1File: Signed Form 1- Architect Certificate- SHDC Unit 3- Upto 31st March 2023.pdf | 21 Feb 2026 |
| Form 2File: Signed Form 2- Engineer Certificate- SHDC Unit 3- Upto 31st March 2023.pdf | 21 Feb 2026 |
| Form 3File: Signed Form 3- CA Certificate- SHDC Unit 3- Upto 31st March 2023.pdf | 21 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory- Upto 31st March 2023.pdf | 21 Feb 2026 |
| Form 5 (FY 2022-2023)File: Form 5- Annual Report- SHDC Unit 3- FY 22-23.pdf | 20 Feb 2026 |
| Form 5 (FY 2023-2024)File: Form 5- Annual Report- SHDC Unit 3- FY 23-24.pdf | 20 Feb 2026 |
| Form 5 (FY 2024-2025)File: Form 5- Annual Report- SHDC Unit 3- FY 24-25.pdf | 20 Feb 2026 |
| Form 1File: Form 1- Architect Certificate SHDC Unit 3 upto 30th Sep 2025.pdf | 17 Feb 2026 |
| Form 2File: Form 2 RERA Engineer Certificate SHDC Unit 3 Upto 30th Sep 2025.pdf | 17 Feb 2026 |
| Form 3File: Form 3- CA Certificate- SHDC Unit 3 Upto 30th Sep 2025- FINAL.pdf | 17 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Upto 30th Sep 2025.pdf | 17 Feb 2026 |
| Form 1File: Form 1- Architect Certificate- SHDC Unit 3.pdf | 17 Feb 2026 |
| Form 2File: Form 2 RERA Engineer Certificate SHDC Unit 3 Upto 31st Dec 2025.pdf | 17 Feb 2026 |
| Form 3File: Form 3- CA Certificate- SHDC Unit 3 Upto 31st Dec 2025.pdf | 17 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Upto 31st Dec 2025.pdf | 17 Feb 2026 |
| Form 1File: Form 1 Architect Certificate Geetanjali Upto 30th Sep 2024.pdf | 14 Feb 2026 |
| Form 2File: Form 2 RERA Engineer Certificate SHDC Unit 3 Upto 30th Sep 2024.pdf | 14 Feb 2026 |
| Form 3File: Signed Form 3 RERA CA Certificate Geetanjali upto 30th Sep 2024.pdf | 14 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Signed Sold Unsold Inventory Upto 30th Sep 2024.pdf | 14 Feb 2026 |
| Form 1File: Form 1 Architect Certificate Geetanjali Upto 31st Dec 2024.pdf | 14 Feb 2026 |
| Form 2File: Form 2 RERA Engineer Certificate SHDC Unit 3 Upto 31st Dec 2024.pdf | 14 Feb 2026 |
| Form 3File: Form 3- RERA CA Certificate-Geetanjali- Upto 31st Dec 2024.pdf | 14 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Upto 31st Dec 2024.pdf | 14 Feb 2026 |
| Form 1File: Form 1 Architect Certificate Geetanjali Upto 31st March 2025.pdf | 14 Feb 2026 |
| Form 2File: Form 2 RERA Engineer Certificate SHDC Unit 3 Upto 31st March 2025.pdf | 14 Feb 2026 |
| Form 3File: Form 3- RERA CA Certificate-Geetanjali- Upto 31st March 2025.pdf | 14 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Upto 31st March 2025.pdf | 14 Feb 2026 |
| Form 1File: Form 1- Architect Certificate SHDC Unit 3 upto 30th June 2025.pdf | 14 Feb 2026 |
| Form 2File: Form 2 RERA Engineer Certificate SHDC Unit 3 Upto 30th June 2025.pdf | 14 Feb 2026 |
| Form 3File: Form 3- RERA CA Certificate-Geetanjali- Upto 30th June 2025- FINAL.pdf | 14 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Upto 30th June 2025.pdf | 14 Feb 2026 |
| Form 1File: Signed Form 1 Architect Certificate SHDC Unit 3.pdf | 13 Feb 2026 |
| Form 2File: Form 2 RERA Engineer Certificate SHDC Unit 3 Upto 30th June 2023.pdf | 13 Feb 2026 |
| Form 3File: Signed Form 3 RERA CA Certificate Geetanjali upto 30th June 2023.pdf | 13 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 13 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 13 Feb 2026 |
| Form 3File: Signed Form 3 RERA CA Certificate Geetanjali upto 30th Sep 2023.pdf | 13 Feb 2026 |
| Form 2File: Form 2 RERA Engineer Certificate SHDC Unit 3 Upto 30th Sep 2023.pdf | 13 Feb 2026 |
| Form 1File: Signed Form 1 Architect Certificate SHDC Unit 3.pdf | 13 Feb 2026 |
| Form 1File: Signed Form 1 Architect Certificate SHDC Unit 3.pdf | 13 Feb 2026 |
| Form 2File: Form 2 RERA Engineer Certificate SHDC Unit 3 Upto 31st Dec 2023.pdf | 13 Feb 2026 |
| Form 3File: Signed Form 3 RERA CA Certificate Geetanjali upto 31st Dec 2023.pdf | 13 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 13 Feb 2026 |
| Form 1File: Signed Form 1 Architect Certificate SHDC Unit 3.pdf | 13 Feb 2026 |
| Form 2File: Form 2 RERA Engineer Certificate SHDC Unit 3 Upto 31st March 2024.pdf | 13 Feb 2026 |
| Form 3File: Signed Form 3 RERA CA Certificate Geetanjali upto 31st March 2024.pdf | 13 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf | 13 Feb 2026 |
| Form 2File: Form 2 RERA Engineer Certificate SHDC Unit 3 Upto 30th June 2024.pdf | 13 Feb 2026 |
| Form 3File: Signed Form 3 RERA CA Certificate Geetanjali upto 30th June 2024.pdf | 13 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Signed Sold Unsold Inventory Upto 30th June 2024.pdf | 13 Feb 2026 |
| Form 1File: Form 1 Architect Certificate SHDC Unit 3 Upto 30th June 2024.pdf | 13 Feb 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Geetanjali A Architect Form-1(1-10-24 to 31-12-24) Dated-10-01-2025.pdf | 15 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Geetanjali Upto 30th June 2024.pdf | 23 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Geetanjali Upto 30th Sep 2024.pdf | 23 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 RERA CA Certificate Geetanjali upto 30th June 2023.pdf | 23 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 RERA CA Certificate Geetanjali upto 30th Sep 2023.pdf | 23 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 RERA CA Certificate Geetanjali upto 31st Dec 2023.pdf | 23 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 RERA CA Certificate Geetanjali upto 31st March 2024.pdf | 23 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 RERA CA Certificate Geetanjali upto 30th June 2024.pdf | 23 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 RERA CA Certificate Geetanjali upto 30th Sep 2024.pdf | 23 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA Engineer Certificate SHDC Unit 3 Upto 30th June 2023.pdf | 23 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA Engineer Certificate SHDC Unit 3 Upto 30th Sep 2024.pdf | 23 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA Engineer Certificate SHDC Unit 3 Upto 30th June 2024.pdf | 23 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA Engineer Certificate SHDC Unit 3 Upto 31st March 2024.pdf | 23 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA Engineer Certificate SHDC Unit 3 Upto 31st Dec 2023.pdf | 23 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA Engineer Certificate SHDC Unit 3 Upto 30th Sep 2023.pdf | 23 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Signed Sold Unsold Inventory Upto 30th June 2024.pdf | 23 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Signed Sold Unsold Inventory Upto 30th Sep 2024.pdf | 23 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 25 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 25 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 25 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 25 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 25 Oct 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 116 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Geetanjali A Apartment on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PARVATI13,700+ in Pune
Filed coordinates, straight-line distance. 169 registered projects within 2 km.
Sai Towers
CITY ETHERNAL LLP
ARCO SKYLIFE
ARCO ENGINEERS
Shrirang Park
NBC PROJECTS
NYATI EMBLEM
NYATI CONSTRUCTION PRIVATE LIMITED
SHALIMAR
SONIGARA VENTURES
SUMEDHA
SHREE RAM BUILDERS & PROMOTERS
Builder: Sarthak Housing Development Corporation Unit -3
Sarthak Housing Development Corporation Unit -3 has 1 registration on MahaRERA, including Geetanjali A Apartment. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Geetanjali A Apartment is delayed beyond 30 Jun 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Geetanjali A Apartment?
The registered promoter entity is Sarthak Housing Development Corporation Unit -3, a partnership as per the filing. Its GSTIN 27AEQFS0264J1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Geetanjali A Apartment?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Geetanjali A Apartment?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Geetanjali A Apartment?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Geetanjali A Apartment?
The professionals named in the filing: Architect: AR MANGESH GOTAL; Engineer: SADASHIV LOHOKARE; Chartered Accountant: SPAK & CO; Chartered Accountant: Supriya Abhijit Mundada; Chartered Accountant: GMKS and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Geetanjali A Apartment?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback