Registered No litigation declared Residential / Group Housing project

GEBI PRERNA

By Ashwin kumar Jain

RG-MH-97882 · RERA P51700014458 · Last updated on MahaRERA portal: 21 Dec 2025

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 90 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 90 months from the original
34 of 99Construction stages doneacross 9 buildings; furthest along: Internal walls, 50%
193 of 280Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

GEBI PRERNA is a Residential / Group Housing project by Ashwin kumar Jain in Thane, Maharashtra, registered with MahaRERA as P51700014458 on 4 Dec 2017. Possession is promised by 31 Dec 2028. The completion date has moved by 90 months from the original filing. 87 of the 280 units on this registration are recorded sold or booked, and 34 of 99 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameGEBI PRERNA
  • TypeResidential / Group Housing
  • Location
    • WADA ROAD
    • SHELAR
    • Shelar (CT)
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700014458
  • ReraGenie IDRG-MH-97882

Builder

  • NameAshwin kumar Jain
  • Entity typeIndividual
  • Declared earlier projects2 →

Key dates

this monthRegisteredDec 2017First promiseJun 2021Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Dec 2017
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Jun 2021)
  • Buildings9 building records
  • Documents filed101 files

Current status

31%87 of 280 units booked

Figures as on 21 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1NA8728028
3NA111035035
2NA8728028
5NA8728028
7NA8728028
8NA8728028
6NA11735035
4NA11735035
9NA11935035

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 21 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

34 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Internal walls, at 50%.

147%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
342%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
247%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
547%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure25%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
786%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
886%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
60%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
40%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
90%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed71

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots71
Closed/Covered9
Open Space62
BuildingClosed/CoveredOpen SpaceTotal
1101
3189
2189
5189
7189
8189
6189
4167
9189

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area9,300 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jul 2025
LandownerVillageDistrict
Sangeeta Shantaram BhoirShelar (CT)Thane
Bharat BhoirShelar (CT)Thane
Bhoir Sangeeta ShantaramShelar (CT)Thane

Approvals and building plan

Sanctioning authorityMumbai metropolitan Regional development authority
Permissible FSI13915.3
Proposed, not sanctioned8,715 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSARVODAY NAGAR, MULUND WEST, MUMBAI - 80

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDURRAJ KK S Khamankar
EngineerSUNIL PATIL KAGADE PATIL
EngineerMohsin A Jatu A JATU
Chartered AccountantUday p prasad
PartnerRole in project
Ashwin kumar Jain-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700015409Jun 2021 → Dec 2025

Reason as filed by the promoterDue to the delay in getting approvals and delay due to COVID, we have come under tremendous financial stress. We have managed to complete two buildings in the last two years. Banks are not willing to fund as as we have very thin margin of profit. We are tying up with a contractor for the completion of the balance of seven buildings in the project on Barter basis. Being in the low-cost housing category we wish to complete the project anyhow as our customers are all middle and lower-class. We wish to give them the dream house we promised.

EXT51700010299Jun 2021 → Jun 2022

Reason as filed by the promoterThe project has got delayed due to non-payment of dues by customers and lack of further sales. Funds have dried up and we are awaiting funding lines from bank. We hope to restart our project in a month's time and complete by June 2022. we are also applying to MMRDA for revalidation of our CC.

EA30122519138Jun 2021 → Dec 2028

Reason as filed by the promoteras given earlier

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000023419kapil kapadiaAshwin Kumar Jain21/02/2018
CC006000000057514Suryakant PadhariaAshwin Kumar Jain13/01/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Nov 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 3File: FORM NO 5 24-25.pdf21 Dec 2025
Form 1File: form 1 arcbitect 27012022.pdf21 Dec 2025
Form 2File: form 2 22-23 part1.pdf21 Dec 2025
Disclosure of Sold and Booked InventoryFile: SALES DATA UPTO 310325.pdf21 Dec 2025
Self-declaration of Quarterly ProgressFile: QPR.pdf21 Dec 2025
Form 1File: bank_statement_QPR_merged.pdf18 Jul 2025
Form 2File: bank_statement_QPR_merged.pdf18 Jul 2025
Form 3File: bank_statement_QPR_merged.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: bank_statement_QPR_merged.pdf18 Jul 2025
Self-declaration of Quarterly ProgressFile: bank_statement_QPR_merged.pdf18 Jul 2025
Form 1File: bank_statement_QPR_merged.pdf18 Jul 2025
Form 2File: bank_statement_QPR_merged.pdf18 Jul 2025
Form 3File: bank_statement_QPR_merged.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: bank_statement_QPR_merged.pdf18 Jul 2025
Self-declaration of Quarterly ProgressFile: bank_statement_QPR_merged.pdf18 Jul 2025
Certificates of CA (Form 3)File: form 3 page 1 2 3.pdf22 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 architect 24.pdf20 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 22-23 part1.pdf20 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 22-23 part2.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: sales data 1.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: sales data 2.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: sales data 3.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: sales data 4.pdf20 Jul 2024
Certificates of CA (Form 3)File: form 3 page 1 2 3.pdf20 Jul 2024
Certificates of CA (Form 3)File: form 3 page 4 5 6.pdf20 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A 2023.pdf19 Jul 2024
Certificates of CA (Form 3)File: Form 5 CA certificate oct23.pdf19 Oct 2023
Declaration in FORM BFile: form B rera 19062023.pdf3 Jul 2023
Declaration in FORM BFile: form B rera 19062023.pdf20 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A 2023.pdf20 Jun 2023
Disclosure of sold/ booked inventoryFile: sales data 1.pdf20 Jun 2023
Disclosure of sold/ booked inventoryFile: sales data 2.pdf20 Jun 2023
Disclosure of sold/ booked inventoryFile: sales data 3.pdf20 Jun 2023
Disclosure of sold/ booked inventoryFile: sales data 4.pdf20 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 2023 ok.pdf20 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 page 1 01042023.pdf8 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 page 2 01042023.pdf8 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 page 3 4 01042023.pdf8 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 page 5 6 01042023.pdf8 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 page 7 8 01042023.pdf8 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 page 9 10 01042023.pdf8 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 22-23 part1.pdf8 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 22-23 part2.pdf8 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A 2023.pdf8 Jun 2023
Disclosure of sold/ booked inventoryFile: SALES DATA UPTO 310323.pdf8 Jun 2023
Certificates of CA (Form 3)File: form 3 page 1 2 3.pdf8 Jun 2023
Certificates of CA (Form 3)File: form 3 page 3 PART2.pdf8 Jun 2023
Certificates of CA (Form 3)File: form 3 page 4 5 6.pdf8 Jun 2023
Certificates of CA (Form 3)File: form 3 page 7 8 9.pdf8 Jun 2023
Certificates of CA (Form 3)File: form 3 page 7 8 9.pdf8 Jun 2023
Certificates of CA (Form 3)File: form 3 page 10 11 12.pdf8 Jun 2023
Certificates of CA (Form 3)File: form 3 page 13 14 15.pdf8 Jun 2023
Certificates of CA (Form 3)File: form 3 page 16 17 18.pdf8 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 2023.pdf8 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-2A 2022.pdf29 Apr 2023
Disclosure of sold/ booked inventoryFile: SALES DATA UPTO 310323.pdf29 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: from 5 2022.pdf29 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 01042022.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: SALES DATA UPTO 25122022.pdf5 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 01012023.pdf5 Jan 2023
Disclosure of sold/ booked inventoryFile: SALES DATA UPTO 30062022.pdf28 Jul 2022
Disclosure of sold/ booked inventoryFile: sales data 1234569(1).pdf23 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 21-22.pdf1 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 21-22.pdf1 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 21-22.pdf1 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form2A 31122020.pdf30 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form2A 31122020.pdf30 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 18-19.pdf30 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 19-20.pdf30 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 20-21.pdf30 Jul 2021
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE form D.pdf12 Jul 2021
Disclosure of sold/ booked inventoryFile: INVENTORY DATA.pdf12 Jul 2021
Disclosure of sold/ booked inventoryFile: INVENTORY DATA.pdf12 Jul 2021
Disclosure of sold/ booked inventoryFile: INVENTORY DATA.pdf11 Jul 2021
Certificates of CA (Form 5)File: Form 5 2017-18.pdf8 May 2019
Layout approvalFile: layout and no encu.pdf21 Nov 2017
Details of encumbrancesFile: layout and no encu.pdf21 Nov 2017
Copy of Layout Approval (in case of layout)File: layout and no encu.pdf21 Nov 2017
Declaration in FORM BFile: form B Rera.pdf21 Nov 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Laxmi KrupaPisavali20CompletedJan 2014Late, Jul 2015
Sadguru societyChinchpada110CompletedDec 2010Late, Sep 2011

How this compares with Thane

31%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 90 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GEBI PRERNA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHELAR7,600+ in Thane

2 kmGEBI PRERNACompleted 5Lapsed / revoked 7Other 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 31 registered projects within 2 km.

Builder: Ashwin kumar Jain

Ashwin kumar Jain has 1 registration on MahaRERA, including GEBI PRERNA. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if GEBI PRERNA is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GEBI PRERNA?

The registered promoter entity is Ashwin kumar Jain, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GEBI PRERNA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against GEBI PRERNA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for GEBI PRERNA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GEBI PRERNA?

The professionals named in the filing: Architect: DURRAJ KK S Khamankar; Engineer: SUNIL PATIL KAGADE PATIL; Engineer: Mohsin A Jatu A JATU; Chartered Accountant: Uday p prasad. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GEBI PRERNA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GEBI PRERNA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GEBI PRERNA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.