Home / Browse projects / Thane, Maharashtra / GAYATRI KRUPA
GAYATRI KRUPA
RG-MH-20032 · RERA P51700007229 · Last updated on MahaRERA portal: 8 May 2024
Source: official MahaRERA filing
Red flags
- Completion date moved by 33 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GAYATRI KRUPA is a Others project by GAYATRI BUILDERS in Thane, Maharashtra, registered with MahaRERA as P51700007229 on 17 Aug 2017. The registration is recorded completed; possession was promised by 30 Sep 2025. The completion date has moved by 33 months from the original filing.
At a glance
Project
- NameGAYATRI KRUPA
- TypeOthers
- Location
- kamatghar
- bhiwandi
- Bhiwandi (M Corp.)
- Thane
- 421302
- Pincode421302
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700007229
- ReraGenie IDRG-MH-20032
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on17 Aug 2017
- Promised completion30 Sep 2025
- Revised completionRevised to 30 Sep 2025 (originally 30 Dec 2022)
- Buildings1 building record
- Documents filed87 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| GAYATRI KRUPA | NA | 11 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
GAYATRI KRUPA: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 8 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed21
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ORIENT CONSULTING ENGINEER & ASSOCIATES |
| Engineer | ORIENT CONSULTING ENGINEERS & ASSOCIATES |
| Partner | Role in project |
|---|---|
| GAYATRI BUILDERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe had applied for O.C in local authority but we have still not received O.C from the Local authority. At the time of registration we had given the proposed date of possession as 30/12/2022 ,but we have not received OC on or before the 30/12/2022 therefore we hereby would like to extend the date of posession from 30/12/2022 to 30/09/2023 so that the name of our Project removed from Lapsed Project List.
Reason as filed by the promoterWE HAVE COMPLETED OUR PROJECT IN MARCH 2022 ITSELF AND APPLIED FOR OC ALSO BUT DUE TO SOME TECHNICAL GLITCH IN SYSTEM THERE IS A DELAY IN GETTING OC FROM THE SANCTIONING AUTHORITY.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 8 May 2024
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1-31-3-24.pdf | 8 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form2-31-3-24.pdf | 8 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: AnyScanner_05_06_2024.pdf | 8 May 2024 |
| Certificates of CA (Form 3)File: form 3.pdf | 8 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5.pdf | 8 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: BUILDING NO 1 OC (1).pdf | 8 May 2024 |
| Declaration in FORM BFile: from b.pdf | 3 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FROM 1 JUNE 22.pdf | 1 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FROM 1 SEPT 22.pdf | 1 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FROM 1 DEC 22.pdf | 1 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FROM 1 MAR 23.pdf | 1 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FROM 1 JUNE 23.pdf | 1 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FROM 1 SEPT 23.pdf | 1 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FROM 1 DEC 23.pdf | 1 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FROM 2 JUNE 2022.pdf | 1 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FROM 2 SEPT 2022.pdf | 1 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FROM 2 DEC 22.pdf | 1 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FROM 1 MAR 23.pdf | 1 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FROM 2 JUNE 23.pdf | 1 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FROM 2 SEPT 23.pdf | 1 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FROM 2 DEC 23.pdf | 1 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 2021.pdf | 1 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 2021.pdf | 1 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FROM 2A 2022.pdf | 1 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FROM 2A 2023.pdf | 1 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DISCLOSURE-2.pdf | 1 Feb 2024 |
| Certificates of CA (Form 3)File: FROM 3 JUNE 22.pdf | 1 Feb 2024 |
| Certificates of CA (Form 3)File: FROM 3 SEPT 22.pdf | 1 Feb 2024 |
| Certificates of CA (Form 3)File: FROM DEC 22.pdf | 1 Feb 2024 |
| Certificates of CA (Form 3)File: FROM MAR 23.pdf | 1 Feb 2024 |
| Certificates of CA (Form 3)File: FROM JUNE 23.pdf | 1 Feb 2024 |
| Certificates of CA (Form 3)File: FROM SEPT 23.pdf | 1 Feb 2024 |
| Certificates of CA (Form 3)File: FROM 2 DEC 23.pdf | 1 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FROM 5.pdf | 1 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure_of_sold_unsold_krupa_11zon.pdf | 21 Feb 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form_4 new format.pdf | 21 Feb 2023 |
| Certificates of CA (Form 3)File: GAYATRI KRUPA 9 SEP 2021 FORM 3_compressed.pdf | 28 Jan 2023 |
| Certificates of CA (Form 3)File: GAYATRI KRUPA 8 DEC 2021 FORM 3_compressed.pdf | 28 Jan 2023 |
| Certificates of CA (Form 3)File: GAYATRI KRUPA MARCH 2022 FORM 3_compressed.pdf | 28 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: GAYATRI KRUPA 5 2019-2020 FORM 5_compressed.pdf | 28 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: GAYATRI KRUPA 6 2020-2021 FORM 5_compressed.pdf | 28 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: GAYATRI KRUPA 7 2021-2022 FORM 5_compressed.pdf | 28 Jan 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC_application_krupa.pdf | 28 Jan 2023 |
| Certificates of CA (Form 3)File: GAYATRI KRUPA MARCH 2021.pdf | 18 Aug 2021 |
| Certificates of CA (Form 3)File: GAYATRI KRUPA JUNE 2021.pdf | 18 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 dec 2020 gayatyri krupa.pdf | 23 Jan 2021 |
| Certificates of CA (Form 3)File: FORM 3 GFAYATRI.PDF | 23 Jan 2021 |
| Certificates of CA (Form 3)File: ANNEXURE FOR FORM 3 31 DEC 2020 GAYATRI.pdf | 23 Jan 2021 |
| Certificates of CA (Form 5)File: NBD0001.pdf | 29 Sep 2018 |
| Certificates of CA (Form 5)File: NBD0002.pdf | 29 Sep 2018 |
| Certificates of CA (Form 3)File: GAYATRI KRUPA 092017-ilovepdf-compressed.pdf | 26 Sep 2018 |
| Certificates of CA (Form 3)File: GAYATRI KRUPA 122017-ilovepdf-compressed.pdf | 26 Sep 2018 |
| Certificates of CA (Form 3)File: GAYATRI KRUPA 032018-ilovepdf-compressed.pdf | 26 Sep 2018 |
| Certificates of CA (Form 3)File: GAYATRI KRUPA 062018-ilovepdf-compressed.pdf | 26 Sep 2018 |
| Certificates of CA (Form 3)File: GAYATRI KRUPA-ilovepdf-compressed.pdf | 31 Jul 2017 |
| Proforma of Allotment letterFile: GayatrikrupaReraAgreement-2017.pdf | 31 Jul 2017 |
| Building plan approvalFile: PERMISSION1.pdf | 29 Jul 2017 |
| Building plan approvalFile: PERMISSION2.pdf | 29 Jul 2017 |
| Building plan approvalFile: PERMISSION3.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: PERMISSION1.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: PERMISSION2.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: PERMISSION3.pdf | 29 Jul 2017 |
| Layout approvalFile: sectioned plan copy 1.pdf | 28 Jul 2017 |
| Layout approvalFile: sectioned plan copy 2.pdf | 28 Jul 2017 |
| PAN CardFile: GAYATRI BUILDERS.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: TITLE REPORT1.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: TITLE REPORT2.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: TITLE REPORT 3.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: TITLE REPORT 4.pdf | 28 Jul 2017 |
| Copy of the legal title reportFile: TITLE REPORT 5.pdf | 28 Jul 2017 |
| Details of encumbrancesFile: ENCUMBRANCE CERT.pdf | 28 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: sectioned plan copy 1.pdf | 28 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: sectioned plan copy 2.pdf | 28 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERT1.pdf | 28 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERT2.pdf | 28 Jul 2017 |
| Declaration in FORM BFile: AFFIDAVIT1.pdf | 28 Jul 2017 |
| Declaration in FORM BFile: AFFIDAVIT2.pdf | 28 Jul 2017 |
| Declaration in FORM BFile: AFFIDAVIT3.pdf | 28 Jul 2017 |
| Declaration in FORM BFile: AFFIDAVIT4.pdf | 28 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch krupa form pg1.pdf | 28 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 87 filed documents as one ZIP, foldered, with a manifest
Keep GAYATRI KRUPA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near bhiwandi7,600+ in Thane
Filed coordinates, straight-line distance. 93 registered projects within 2 km.
GODREJ UPAVAN
PRAKHHYAT DWELLINGS LLP
DGT - Sector 3A - Cluster 2 - Phase 1
ADRIKA DEVELOPERS PRIVATE LIMITED
DOSTI GREATER THANE - PHASE 1
ADRIKA DEVELOPERS PRIVATE LIMITED
Dosti Greater Thane - Sector 3A - Cluster 1B -
ADRIKA DEVELOPERS PRIVATE LIMITED
USHA RESIDENCY
SHREE BUDHDEV INFRA
NARAYANI DHAM BUILDING NO 2A AND 2B
MAYA DEVELOPER
See every Thane project, with the district possession charts
Builder: GAYATRI BUILDERS
GAYATRI BUILDERS has 7 registrations on MahaRERA, including GAYATRI DHAM and GAYATRI KRUPA. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if GAYATRI KRUPA is delayed beyond 30 Sep 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GAYATRI KRUPA?
The registered promoter entity is GAYATRI BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GAYATRI KRUPA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GAYATRI KRUPA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GAYATRI KRUPA?
The professionals named in the filing: Architect: ORIENT CONSULTING ENGINEER & ASSOCIATES; Engineer: ORIENT CONSULTING ENGINEERS & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GAYATRI KRUPA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback