Home / Browse projects / Thane, Maharashtra / GAYATRI ANAND

Registered No litigation declared Residential / Group Housing project

GAYATRI ANAND

By Gayatri Builders

RG-MH-06302 · RERA P51700052310 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Slabs of Super Structure, 6%
21 of 25Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 75 documents Report an error

GAYATRI ANAND is a Residential / Group Housing project by Gayatri Builders in Thane, Maharashtra, registered with MahaRERA as P51700052310 on 9 Aug 2023. Possession is promised by 31 Dec 2028. 4 of the 25 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameGAYATRI ANAND
  • TypeResidential / Group Housing
  • Location
    • Chikanghar
    • Kalyan W
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700052310
  • ReraGenie IDRG-MH-06302

Builder

  • NameGayatri Builders
  • Entity typePartnership
  • GSTIN27AASFG6991J1ZH
  • PartnersAshok Hotchand Gangwani, Vaibhav Dattaram Durve
  • Other registrations6 more →
  • Completed4 of 7
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed75 files

Current status

16%4 of 25 units booked

Figures as on 28 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GAYATRI ANANDNA6525025

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 6%.

GAYATRI ANAND: 1% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Open Space50

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area770 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Mar 2026
LandownerVillageDistrict
HINGUL AMBIKA CHS LTDChikangharThane

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVLI MUNCIPAL CORPORATION
Permissible FSI1819.75
Proposed, not sanctioned1,820 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKALYAN W

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA S DASTANE
EngineerSumedh Marathe
Chartered AccountantS B Shinde and Associates Chartered Accountants
Chartered AccountantG C Godbole & Co.
Chartered AccountantSUBHASH S SHINDE
PartnerRole in project
Gayatri Builders-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed75

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: From 1 Q4 FY 25-26 Anand.pdf28 Apr 2026
Form 2File: From 2 Q4 FY 25-26 Anand.pdf28 Apr 2026
Form 3File: Form 3 Q4 FY 25-26 Anand.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclousre of Sold Undold Inventory 31-03-26.pdf28 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 FY 25-26 Anand.pdf2 Mar 2026
Form 1File: Form 1 Q3 FY 25-26 Anand.pdf22 Feb 2026
Form 2File: Form 2 Q3 FY 25-26 Anand.pdf22 Feb 2026
Form 3File: Form3 Q3 FY 25-26 Anand.pdf22 Feb 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold - Anand 311225.pdf22 Feb 2026
Form 1File: Form1 Q2 FY 25-26 Anand.pdf20 Nov 2025
Form 2File: Form 2 Q2 FY 25-26 Anand.pdf20 Nov 2025
Form 3File: Form 3 Q2 FY 25-26 Anand.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold - Anand 300925.pdf20 Nov 2025
Form 1File: Form 1 Q1 FY 25-26 Anand.pdf23 Aug 2025
Form 2File: Form 2 Q1 FY 25-26 Anand.pdf23 Aug 2025
Form 3File: Form 3 Q1 FY 25-26 Anand.pdf23 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf23 Aug 2025
Form 1File: Form 1 Q4 FY 24-25 Anand.pdf30 Jun 2025
Form 2File: Form 2 Q4 FY 24-25 Anand.pdf30 Jun 2025
Form 3File: From 3 Q4 FY 24-25 Anand.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf30 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Gayatri Anand FY 23-24.pdf9 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 FY 24-25 Anand.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 FY 24-25 Anand.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 FY 24-25 Anand.pdf24 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Q3 FY 24-25 Anand.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2 FY 24-25 Anand.pdf27 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A Q1 FY 24-25 Anand.pdf27 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Q2 FY 24-25 Anand.pdf27 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 FY 24-25 Anand.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 FY 24-25 Anand.pdf20 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Q2 FY 24-25 Anand.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 FY 24-25 Anand.pdf7 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1 FY 24-25 Anand.pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 FY 24-25 Anand.pdf24 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A Q1 FY 24-25 Anand.pdf24 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Q2 FY 23-24 Anand.pdf12 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Q3 FY 23-24 Anand.pdf12 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Q4 FY 23-24 Anand.pdf12 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 FY 23-24 Anand.pdf11 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 FY 23-24 Anand.pdf11 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 FY 23-24 Anand.pdf11 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 FY 23-24 Anand.pdf10 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q3 FY 23-24 Anand.pdf10 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 FY 23-24 Anand.pdf10 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 FY 23-24 Anand.pdf8 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 FY 23-24 Anand.pdf8 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2 FY 23-24 Anand.pdf8 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2 FY 23-24 Anand.pdf8 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: frm 3 .pdf29 Jul 2023
Proforma of Agreement for saleFile: Model afs anand.pdf29 Jul 2023
Layout approvalFile: Plan - Gaytri Anand.PDF15 Jul 2023
Building plan approvalFile: Plan - Gaytri Anand.PDF15 Jul 2023
PAN CardFile: PAN ANAND.pdf15 Jul 2023
Copy of the legal title reportFile: LEGAL TITLE CERTIFICATE GAYATRI ANAND.pdf15 Jul 2023
Details of encumbrances concerned to FinanceFile: NO ENC FIN.pdf15 Jul 2023
Details of encumbrances concerned to FinanceFile: NO ENC LEGAL.pdf15 Jul 2023
Details of encumbrances concerned to LegalFile: NO ENC FIN.pdf15 Jul 2023
Details of encumbrances concerned to LegalFile: NO ENC LEGAL.pdf15 Jul 2023
Copy of Layout Approval (in case of layout)File: Plan - Gaytri Anand.PDF15 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan - Gaytri Anand.PDF15 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf15 Jul 2023
Declaration about Commencement CertificateFile: DEC CC ANAND.pdf15 Jul 2023
Declaration in FORM BFile: FORM B DEV.pdf15 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GAYATRI BUILDERS ENGG CERTIFICATE.pdf15 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Gayatri Anand.pdf15 Jul 2023
CERSAI detailsFile: CERSAI.pdf15 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: GAYATRI BUILDERS_DISCLOSURE OF INTEREST_MR ASHOK H GANFWANI.pdf15 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: GAYATRI BUILDERS_DISCLOSURE OF INTEREST_MR VAIBHAV DURVE.pdf15 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: GAYATRI BUILDERS_DISCLOSURE OF INTEREST_MRS MRUDULA KARANDIKAR.pdf15 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: GAYATRI BUILDERS_DISCLOSURE OF INTEREST_MRS SHEETAL M DURVE.pdf15 Jul 2023
Proforma of Allotment letterFile: ALLOTMENTLETTER ANAND .pdf15 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A DECLARATION ABOUT SEPARATE BANK ACCOUNT.pdf15 Jul 2023
Deviation Report with respect to Allotment letterFile: DEV AL.pdf15 Jul 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION INRESPECT OF DRAFT AGREEMENT.pdf15 Jul 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
GAYATRI NIWASP51700029816CHIKANGHAR, ThaneJul 2021CompletedDec 2025May 2023
Gayatri SankulP51700021518Oak Baug, ThaneJul 2019CompletedDec 2023May 2021

How this compares with Thane

16%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GAYATRI ANAND on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalyan W7,600+ in Thane

2 kmGAYATRI ANANDCompleted 78Lapsed / revoked 52Other 121Dot size: filed unitsN

Filed coordinates, straight-line distance. 251 registered projects within 2 km.

Builder: Gayatri Builders

GAYATRI BUILDERS has 7 registrations on MahaRERA, including GAYATRI DHAM and GAYATRI KRUPA. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if GAYATRI ANAND is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GAYATRI ANAND?

The registered promoter entity is Gayatri Builders, a partnership as per the filing. Its GSTIN 27AASFG6991J1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GAYATRI ANAND?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GAYATRI ANAND?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GAYATRI ANAND?

The professionals named in the filing: Architect: A S DASTANE; Engineer: Sumedh Marathe; Chartered Accountant: S B Shinde and Associates Chartered Accountants; Chartered Accountant: G C Godbole & Co.; Chartered Accountant: SUBHASH S SHINDE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GAYATRI ANAND?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GAYATRI ANAND. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GAYATRI ANAND to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.